22-007 |
NA |
$56,000.00 |
$0.00 |
$0.00 |
$0.00 |
$56,000.00 |
|
87-009 |
SMS |
$11,650.00 |
$11,650.00 |
$209,700.00 |
$0.00 |
$233,000.00 |
(1) Acquire Clear Zone Land for Runway 4-22 Extension. (2)Environmental Assessment of Runway Extension. |
87-010 |
SMS |
$23,506.00 |
$23,506.00 |
$423,103.00 |
$0.00 |
$470,115.00 |
(1) Construct 700' Runway Extension & parallel Taxiway with medium intensity runway and taxiway lights. (2) Master Plan Update |
99-021 |
CEU |
$13,356.50 |
$13,356.50 |
$240,417.00 |
$0.00 |
$267,130.00 |
(1) Preparation of plans and specifications through bidding for runway 7/25 overlay, widening, and extension; apron rehabilitation and overlay; and runway safety area improvements. (2) Cemetery analysis and relocation plan (3) Preliminary engineering for |
16-032 |
GYH |
$40,729.00 |
$40,729.00 |
$733,125.00 |
$0.00 |
$814,583.00 |
(1) RWY 5/23 concerete joint replacement, asphalt rejuvenation, and remarking the runway
(2) Engineering design services for reconstructing the north section of TWY "A" |
16-030 |
3J1 |
$434,563.00 |
$1,054,048.00 |
$13,397,499.00 |
$0.00 |
$14,886,110.00 |
(A) Acquire property both in fee simple and easement.
(B) Phase I - Clearing, grading and drainage for realign runway
© Phase II and III - Pave and light realign runway |
16-029 |
HXD |
$1,050,718.00 |
$1,050,718.00 |
$18,912,922.00 |
$0.00 |
$21,014,358.00 |
(A) Design and bidding reimbursement services for runway 3/21 extension and west side drainage improvements
(B) Construction services for extending each end of runway 3/21
© Taxiway "F" infield drainage improvements and mitigation services
(D) Construct EMAS on end of RWY 21
12-18-2019 Note: The Quality Enterprises Rwy 21 Extension has a change order to balance final quantities in the amount of $847,870.83 (not yet included in this grant as of 12-18-2019) |
14-026 |
HXD |
$45,430.00 |
$45,431.00 |
$817,750.00 |
$0.00 |
$908,611.00 |
(A) Reimbursable for the Environmental Categorical Exclusion Service (B) Engineering Design and Bidding Services for Relocate Taxiway "A "and the General Aviation Apron Including Realignment of Taxiway "F" (C) Engineering Design Services for an Airfield Drainage Plan (D) Remove Trees between Air Traffic Control Tower and the General Aviation Apron (E) Environmental Assessment for Removing Trees to Runway 03 Approach (F) Engineering Design and Construction Services For Relocate Remote Transmitter Receiver (RTR) |
03-017 |
RBW |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
(A) Reinstall existing omni-directional approach lighting system (ODALS) on runway 23.
(B) Relocate existing precision approach path indicator lighting system (PAPIS) on runway 23.
(C) Install security fencing along Thunderbolt and Sidneys Roads. |
16-007 |
RBW |
$17,996.00 |
$17,996.00 |
$323,927.00 |
$0.00 |
$359,919.00 |
(A)Update airport layout plan
(B) Airfield drainage study
(C) Engineering design services for drainage repairs in the apron area |
99-014 |
CUB |
$3,835.00 |
$3,835.00 |
$69,024.00 |
$0.00 |
$76,694.00 |
(Phase I) Engineering design services for rehabilitating the airfield lighting system. |
09-004 |
ARW |
$14,059.00 |
$14,059.00 |
$534,252.00 |
$0.00 |
$562,370.00 |
1) Design services: Runway and taxiway overlay, runway end identifier lights, rotating beacon and windsock replacement; 2) Construction services: Tree obstruction removal |
08-016 |
NA |
$66,000.00 |
$0.00 |
$0.00 |
$0.00 |
$66,000.00 |
1- Palmetto Aviation Quarterly Newsletter $18,000
2 - Wings Program $7,000
3 - Aviation Safety Week Program $5,500
4- Airport Safety and Maintenance Programs $7,000
5- SC Aviation Hall of Fame $5,000
6 - Aviation Education Program ( i.e. Wright Flight, Civil Air Patrol) $23,500 |
13-006 |
GGE |
$7,230.51 |
$7,230.53 |
$130,149.36 |
$0.00 |
$144,610.40 |
1. Hangar Taxilane Extension
2. Land Acquisition - Doar Property
3. DBE Plan Update (FY'12-FY'14) and Small Business Participation Plan |
86-027 |
AND |
$20,333.34 |
$20,333.34 |
$366,029.00 |
$0.00 |
$406,695.70 |
1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp |
86-011 |
HXD |
$4,350.00 |
$4,350.00 |
$0.00 |
$0.00 |
$8,700.00 |
1. Resealing of runway overruns (300'x75') x 2 (600'x75') 2. Remarking of runway overruns from relocated to displaced |
84-008 |
SPA |
$7,760.00 |
$7,760.00 |
$139,680.00 |
$0.00 |
$155,200.00 |
1. Security Fencing; 2. Rehab. Aircraft Apron; 3. Rehab. Auto Parking; 4. Non-destructive testing-Rwy 4-22; 5. Obstruction survey Twy 4-22 & 11-29 |
85-XX1 |
AQX |
$75,000.00 |
$150,000.00 |
$0.00 |
$0.00 |
$225,000.00 |
1800' Rwy extension |
13-009 |
LKR |
$8,183.00 |
$8,183.00 |
$310,956.00 |
$0.00 |
$327,322.00 |
2011 Taxilane Rehabilitation Project. |
23-030 |
HXD |
$95,304.00 |
$0.00 |
$857,735.00 |
$0.00 |
$953,039.00 |
36 Hunter Road Land Acquisition |