South Carolina Grant History

Year-ID FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description Sort descending
22-007 NA $56,000.00 $0.00 $0.00 $0.00 $56,000.00
87-009 SMS $11,650.00 $11,650.00 $209,700.00 $0.00 $233,000.00 (1) Acquire Clear Zone Land for Runway 4-22 Extension. (2)Environmental Assessment of Runway Extension.
87-010 SMS $23,506.00 $23,506.00 $423,103.00 $0.00 $470,115.00 (1) Construct 700' Runway Extension & parallel Taxiway with medium intensity runway and taxiway lights. (2) Master Plan Update
99-021 CEU $13,356.50 $13,356.50 $240,417.00 $0.00 $267,130.00 (1) Preparation of plans and specifications through bidding for runway 7/25 overlay, widening, and extension; apron rehabilitation and overlay; and runway safety area improvements. (2) Cemetery analysis and relocation plan (3) Preliminary engineering for
16-032 GYH $40,729.00 $40,729.00 $733,125.00 $0.00 $814,583.00 (1) RWY 5/23 concerete joint replacement, asphalt rejuvenation, and remarking the runway (2) Engineering design services for reconstructing the north section of TWY "A"
16-030 3J1 $434,563.00 $1,054,048.00 $13,397,499.00 $0.00 $14,886,110.00 (A) Acquire property both in fee simple and easement. (B) Phase I - Clearing, grading and drainage for realign runway © Phase II and III - Pave and light realign runway
16-029 HXD $1,050,718.00 $1,050,718.00 $18,912,922.00 $0.00 $21,014,358.00 (A) Design and bidding reimbursement services for runway 3/21 extension and west side drainage improvements (B) Construction services for extending each end of runway 3/21 © Taxiway "F" infield drainage improvements and mitigation services (D) Construct EMAS on end of RWY 21 12-18-2019 Note: The Quality Enterprises Rwy 21 Extension has a change order to balance final quantities in the amount of $847,870.83 (not yet included in this grant as of 12-18-2019)
14-026 HXD $45,430.00 $45,431.00 $817,750.00 $0.00 $908,611.00 (A) Reimbursable for the Environmental Categorical Exclusion Service (B) Engineering Design and Bidding Services for Relocate Taxiway "A "and the General Aviation Apron Including Realignment of Taxiway "F" (C) Engineering Design Services for an Airfield Drainage Plan (D) Remove Trees between Air Traffic Control Tower and the General Aviation Apron (E) Environmental Assessment for Removing Trees to Runway 03 Approach (F) Engineering Design and Construction Services For Relocate Remote Transmitter Receiver (RTR)
03-017 RBW $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 (A) Reinstall existing omni-directional approach lighting system (ODALS) on runway 23. (B) Relocate existing precision approach path indicator lighting system (PAPIS) on runway 23. (C) Install security fencing along Thunderbolt and Sidneys Roads.
16-007 RBW $17,996.00 $17,996.00 $323,927.00 $0.00 $359,919.00 (A)Update airport layout plan (B) Airfield drainage study (C) Engineering design services for drainage repairs in the apron area
99-014 CUB $3,835.00 $3,835.00 $69,024.00 $0.00 $76,694.00 (Phase I) Engineering design services for rehabilitating the airfield lighting system.
09-004 ARW $14,059.00 $14,059.00 $534,252.00 $0.00 $562,370.00 1) Design services: Runway and taxiway overlay, runway end identifier lights, rotating beacon and windsock replacement; 2) Construction services: Tree obstruction removal
08-016 NA $66,000.00 $0.00 $0.00 $0.00 $66,000.00 1- Palmetto Aviation Quarterly Newsletter $18,000 2 - Wings Program $7,000 3 - Aviation Safety Week Program $5,500 4- Airport Safety and Maintenance Programs $7,000 5- SC Aviation Hall of Fame $5,000 6 - Aviation Education Program ( i.e. Wright Flight, Civil Air Patrol) $23,500
13-006 GGE $7,230.51 $7,230.53 $130,149.36 $0.00 $144,610.40 1. Hangar Taxilane Extension 2. Land Acquisition - Doar Property 3. DBE Plan Update (FY'12-FY'14) and Small Business Participation Plan
86-027 AND $20,333.34 $20,333.34 $366,029.00 $0.00 $406,695.70 1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp
86-011 HXD $4,350.00 $4,350.00 $0.00 $0.00 $8,700.00 1. Resealing of runway overruns (300'x75') x 2 (600'x75') 2. Remarking of runway overruns from relocated to displaced
84-008 SPA $7,760.00 $7,760.00 $139,680.00 $0.00 $155,200.00 1. Security Fencing; 2. Rehab. Aircraft Apron; 3. Rehab. Auto Parking; 4. Non-destructive testing-Rwy 4-22; 5. Obstruction survey Twy 4-22 & 11-29
85-XX1 AQX $75,000.00 $150,000.00 $0.00 $0.00 $225,000.00 1800' Rwy extension
13-009 LKR $8,183.00 $8,183.00 $310,956.00 $0.00 $327,322.00 2011 Taxilane Rehabilitation Project.
23-030 HXD $95,304.00 $0.00 $857,735.00 $0.00 $953,039.00 36 Hunter Road Land Acquisition