87-018 |
0A2 |
$14,600.00 |
$14,600.00 |
$0.00 |
$0.00 |
$29,200.00 |
Approach clearing and obstruction removal in the primary surface areas of runway 10/28, marking power lines, and preliminary engineering design for possible future overlay. |
19-040 |
35A |
$16,173.00 |
$16,172.00 |
$291,105.00 |
$0.00 |
$323,450.00 |
Rwy 23 Approach Land Acquisition Reimbursement (6 Acres) |
23-037 |
35A |
$88,766.00 |
$88,767.00 |
$1,769,269.00 |
$0.00 |
$1,946,802.00 |
Apron and Taxilanes Rehabilitation (design, bid, construction), Entrance Parking Lot Overlay (construction) |
23-036 |
35A |
$17,344.00 |
$17,345.00 |
$312,198.00 |
$0.00 |
$346,887.00 |
Rwy 5/23 Pavement Rehabilitation, Lighting Rehabilitation, 18B Aeronautical Survey |
09-033 |
35A |
$9,750.00 |
$3,250.00 |
$0.00 |
$0.00 |
$13,000.00 |
Replace rotating beacon |
13-030 |
35A |
$21,541.00 |
$21,542.00 |
$387,747.00 |
$0.00 |
$430,830.00 |
Update Airport Layout Plan; Remove Obstructions in Runway 5 and 23 Approaches (Design & Construction) |
08-027 |
35A |
$621.00 |
$9,363.00 |
$190,271.00 |
$0.00 |
$200,255.00 |
Land acquisition assistance services. |
14-020 |
35A |
$9,248.00 |
$9,248.00 |
$166,455.00 |
$0.00 |
$184,951.00 |
Acquire property to the approach of RWY 23 - 1.5 acres of easement from Southside Fire District; Fee simple acquisition of .9 acres from the Palmer estate. |
15-020 |
35A |
$18,005.00 |
$18,005.00 |
$324,090.00 |
$0.00 |
$360,100.00 |
Acquire land for approach clearing |
00-019 |
35A |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
$500,000.00 |
Construct two 10-unit t-hangars and connecting taxilanes. |
91-016A |
35A |
$4,000.00 |
$4,000.00 |
$0.00 |
$0.00 |
$8,000.00 |
Installation of two drain culverts and repair eroded areas along the embankments of the runway. |
91-016 |
35A |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Installation of drain culverts and repair eroded areas along the sides of runway 5/23. |
11-016 |
35A |
$4,103.00 |
$13,732.00 |
$338,864.00 |
$0.00 |
$356,699.00 |
Facilitate land and easement acquisition to approach end of runway 23. |
87-015 |
35A |
$1,500.00 |
$1,500.00 |
$0.00 |
$0.00 |
$3,000.00 |
Purchase six (6) OSHA approved fire fighting suits for the Southside Fire Department as they are responsible for providing fire protection. |
05-014 |
35A |
$16,737.00 |
$16,737.00 |
$636,000.00 |
$0.00 |
$669,474.00 |
Pave runway 5/23 with asphalt, including paving of a 550' runway extension, and installation of medium intensity runway lights. |
99-012 |
35A |
$25,920.00 |
$25,920.00 |
$0.00 |
$0.00 |
$51,840.00 |
Update the airport layout plan, aerial topographic mapping, survey control points, and a boundary property plat. |
03-005 |
35A |
$45,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Rejuvenate, crack seal, and paint runway 5/23. |
81-004 |
38J |
$12,000.00 |
$12,000.00 |
$0.00 |
$0.00 |
$24,000.00 |
Fencing - 8200 linear feet with number 9 gauge chain link with four (4) walk-thru and one (1) drive-thru gate. |
22-033 |
3J0 |
$45,518.00 |
$11,380.00 |
$0.00 |
$0.00 |
$56,898.00 |
NPIAS Justification Analysis and Report |
22-032 |
3J0 |
$24,307.00 |
$6,077.00 |
$0.00 |
$0.00 |
$30,384.00 |
Tree Removal (17 trees with stump grinding) in approach to runway 29
Grant amended at May, 2023 Commission meeting, adding $13,427 in state aid.
Original grant:
$10,880 State
$2,720 Hampton County
Amended grant:
$24,307 State
$6,077 Hampton County |