86-xx4 |
CKI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
Preliminary engineering design and environmental assessment for a 700'runway extension, including the construction of a 4400' parallel taxiway, and 150'x300' apron expansion; widen & strengthen of runway and safety areas. |
86-xx3 |
UDG |
$45,000.00 |
$0.00 |
$0.00 |
$0.00 |
$45,000.00 |
Construction Of Airport Terminal Building |
86-xx2 |
MNI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$60,000.00 |
Preliminary engineering for runway extension |
85-XX2 |
HVS |
$25,000.00 |
$0.00 |
$0.00 |
$0.00 |
$25,000.00 |
Miscellaneous airport improvements- clearing and grubbing, fencing, terminal repair, and roofing T-hangars. |
86-xx1 |
99N |
$25,000.00 |
$0.00 |
$0.00 |
$0.00 |
$25,000.00 |
Installation of Airfield Lighting |
85-XX1 |
AQX |
$75,000.00 |
$150,000.00 |
$0.00 |
$0.00 |
$225,000.00 |
1800' Rwy extension |
23-064 |
AIK |
$52,292.00 |
$34,861.00 |
$0.00 |
$0.00 |
$87,153.00 |
Apron Expansion, ChgO # 1 (Construction) |
23-063 |
HXD |
$5,450.00 |
$0.00 |
$0.00 |
$0.00 |
$5,450.00 |
Tree trimming and removal (Construction) |
23-059 |
RBW |
$550,186.00 |
$366,790.00 |
$0.00 |
$0.00 |
$916,976.00 |
Perimeter Wildlife Fencing (Construction) |
22-055 |
DYB |
$168,000.00 |
$112,000.00 |
$0.00 |
$0.00 |
$280,000.00 |
Taxilane and Apron Project (Design & Permit) |
23-055 |
CDN |
$142,046.00 |
$94,698.00 |
$0.00 |
$0.00 |
$236,744.00 |
Ancillary / Outfall Drainage Improvements (Construction) |
23-054 |
LKR |
$719,869.00 |
$479,913.00 |
$0.00 |
$0.00 |
$1,199,782.00 |
Ancillary Terminal Site Work and Lighting Vault (Construction) |
22-053 |
UZA |
$37,847.00 |
$25,232.00 |
$0.00 |
$0.00 |
$63,079.00 |
Glideslope Replacement (design and bidding) |
22-052 |
LKR |
$20,642.00 |
$13,762.00 |
$0.00 |
$0.00 |
$34,404.00 |
Airport Security Camera System (Cameras & DVR) |
79-050 |
SPA |
$2,800.00 |
$2,800.00 |
$0.00 |
$0.00 |
$5,600.00 |
To establish vegetation in the area cleared for the FAA MALS/RAIL system which is associated with the partial instrument landing system. |
23-050 |
AND |
$161,518.00 |
$17,946.00 |
$0.00 |
$0.00 |
$179,464.00 |
Runway 17 - 35 Reconstruction (Design)
100% Design - Bidding |
22-049 |
GMU |
$186,000.00 |
$124,000.00 |
$0.00 |
$0.00 |
$310,000.00 |
Greenville Downtown Airport District Planning Study |
19-049 |
HVS |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
$500,000.00 |
South Carolina Legislative Special Appropriation
$500,000 at 100% State funding to be used for Hartsville Regional Airport Terminal and Terminal Area Development |
22-047 |
99N |
$19,200.00 |
$4,800.00 |
$0.00 |
$0.00 |
$24,000.00 |
Apron Repair |
23-047 |
S19 |
$93,506.00 |
$23,377.00 |
$0.00 |
$0.00 |
$116,883.00 |
IRT Technical Coordination and Bid Package Development (Planning - Design) |