17-024 |
FDW |
$0.00 |
$39,000.00 |
$702,000.00 |
$0.00 |
$0.00 |
Rehabilitate runway and taxiway lighting system |
05-024 |
MYR |
$0.00 |
$350,000.00 |
$0.00 |
$0.00 |
$350,000.00 |
Renovate general aviation terminal building |
02-021 |
AND |
$0.00 |
$73,857.00 |
$780,420.00 |
$0.00 |
$854,277.00 |
Runway extension Phase II: Land Acquisition, disadvantage business enterprise (DBE) plan preparation, and a FAA reimbursable agreement for coordinating the relocation of the medium intensity approach lighting system (MALSR). |
00-012 |
LUX |
$0.00 |
$22,939.00 |
$0.00 |
$0.00 |
$0.00 |
Collect inventory data, update aviation activity forecast, analysis demand capacity and facility requirements, review alternatives and implementation plan development. Data will be summarized in a brief narrative report. |
87-011 |
HXD |
$0.00 |
$13,600.00 |
$244,800.00 |
$0.00 |
$258,400.00 |
Crash/Fire/Rescue Station, Rapid Intervention Fire Truck and 36" Rotating Beacon with Tower. AIP Project 3-45=0030-02 |
04-002 |
AQX |
$0.00 |
$80,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Construct terminal building. |
92-015A |
UDG |
$531.15 |
$538.13 |
$9,190.00 |
$0.00 |
$10,259.28 |
Amendment to SCAC #92-015 for the reconstruction of the parallel taxiway to runway 5/23, including the medium intensity taxiway lighting system and replacement of the wind cone. |
08-027 |
35A |
$621.00 |
$9,363.00 |
$190,271.00 |
$0.00 |
$200,255.00 |
Land acquisition assistance services. |
21-016 |
SPA |
$739.00 |
$246.00 |
$0.00 |
$0.00 |
$985.00 |
Fence Repairs |
11-018A |
SPA |
$802.00 |
$802.00 |
$19,260.00 |
$0.00 |
$20,864.00 |
Amendment to 11-018: Engineering design, bidding, and construction services; including construction of an auto parking lot for newly constructed terminal building and installation of a new waterline service line. |
95-002 |
DYB |
$953.34 |
$953.34 |
$0.00 |
$0.00 |
$1,906.68 |
Purchasing and installing a lighted wind cone and relocating the segmented circle. |
84-011 |
5J5 |
$975.00 |
$975.00 |
$0.00 |
$0.00 |
$1,950.00 |
Relocate existing power line from the approach to Runway 22 to the extreme eastern edge of airport property, clear and grub for entrance road right-of-way. |
99-008AA |
SPA |
$1,039.02 |
$1,039.02 |
$18,702.36 |
$0.00 |
$20,780.40 |
Grant amendment for project cost increase for the installation of high intensity runway edge lights. |
04-021 |
RBW |
$1,070.00 |
$1,070.00 |
$40,660.00 |
$0.00 |
$42,800.00 |
Update the airport layout plan. |
08-018 |
PHH |
$1,140.00 |
$1,140.00 |
$43,305.00 |
$0.00 |
$45,585.00 |
Install perimeter fencing |
05-025 |
HVS |
$1,191.25 |
$10,789.75 |
$227,639.00 |
$0.00 |
$239,620.00 |
Update the airport master plan and assist in the acquisition of 41.72 acres of property for obstruction clearing. |
14-019A |
SMS |
$1,320.00 |
$1,320.00 |
$23,760.00 |
$0.00 |
$26,400.00 |
Amend grant 14-019 to cover change orders associated with apron rehabilitation |
06-001 |
BBP |
$1,351.00 |
$1,351.00 |
$51,339.00 |
$0.00 |
$54,041.00 |
Update the airport layout plan and re-mark the runway and taxiway pavement markings |
87-015 |
35A |
$1,500.00 |
$1,500.00 |
$0.00 |
$0.00 |
$3,000.00 |
Purchase six (6) OSHA approved fire fighting suits for the Southside Fire Department as they are responsible for providing fire protection. |
07-019 |
6J4 |
$1,520.00 |
$1,520.00 |
$57,776.00 |
$0.00 |
$60,816.00 |
Install a two-box precision approach path indicator light system (PAPI's) on end of runway 1. |