17-024 FDW $0.00 $39,000.00 $702,000.00 $0.00 $0.00 Rehabilitate runway and taxiway lighting system
05-024 MYR $0.00 $350,000.00 $0.00 $0.00 $350,000.00 Renovate general aviation terminal building
02-021 AND $0.00 $73,857.00 $780,420.00 $0.00 $854,277.00 Runway extension Phase II: Land Acquisition, disadvantage business enterprise (DBE) plan preparation, and a FAA reimbursable agreement for coordinating the relocation of the medium intensity approach lighting system (MALSR).
00-012 LUX $0.00 $22,939.00 $0.00 $0.00 $0.00 Collect inventory data, update aviation activity forecast, analysis demand capacity and facility requirements, review alternatives and implementation plan development. Data will be summarized in a brief narrative report.
87-011 HXD $0.00 $13,600.00 $244,800.00 $0.00 $258,400.00 Crash/Fire/Rescue Station, Rapid Intervention Fire Truck and 36" Rotating Beacon with Tower. AIP Project 3-45=0030-02
04-002 AQX $0.00 $80,000.00 $0.00 $0.00 $80,000.00 Construct terminal building.
92-015A UDG $531.15 $538.13 $9,190.00 $0.00 $10,259.28 Amendment to SCAC #92-015 for the reconstruction of the parallel taxiway to runway 5/23, including the medium intensity taxiway lighting system and replacement of the wind cone.
08-027 35A $621.00 $9,363.00 $190,271.00 $0.00 $200,255.00 Land acquisition assistance services.
21-016 SPA $739.00 $246.00 $0.00 $0.00 $985.00 Fence Repairs
11-018A SPA $802.00 $802.00 $19,260.00 $0.00 $20,864.00 Amendment to 11-018: Engineering design, bidding, and construction services; including construction of an auto parking lot for newly constructed terminal building and installation of a new waterline service line.
95-002 DYB $953.34 $953.34 $0.00 $0.00 $1,906.68 Purchasing and installing a lighted wind cone and relocating the segmented circle.
84-011 5J5 $975.00 $975.00 $0.00 $0.00 $1,950.00 Relocate existing power line from the approach to Runway 22 to the extreme eastern edge of airport property, clear and grub for entrance road right-of-way.
99-008AA SPA $1,039.02 $1,039.02 $18,702.36 $0.00 $20,780.40 Grant amendment for project cost increase for the installation of high intensity runway edge lights.
04-021 RBW $1,070.00 $1,070.00 $40,660.00 $0.00 $42,800.00 Update the airport layout plan.
08-018 PHH $1,140.00 $1,140.00 $43,305.00 $0.00 $45,585.00 Install perimeter fencing
05-025 HVS $1,191.25 $10,789.75 $227,639.00 $0.00 $239,620.00 Update the airport master plan and assist in the acquisition of 41.72 acres of property for obstruction clearing.
14-019A SMS $1,320.00 $1,320.00 $23,760.00 $0.00 $26,400.00 Amend grant 14-019 to cover change orders associated with apron rehabilitation
06-001 BBP $1,351.00 $1,351.00 $51,339.00 $0.00 $54,041.00 Update the airport layout plan and re-mark the runway and taxiway pavement markings
87-015 35A $1,500.00 $1,500.00 $0.00 $0.00 $3,000.00 Purchase six (6) OSHA approved fire fighting suits for the Southside Fire Department as they are responsible for providing fire protection.
07-019 6J4 $1,520.00 $1,520.00 $57,776.00 $0.00 $60,816.00 Install a two-box precision approach path indicator light system (PAPI's) on end of runway 1.