South Carolina Grant History

Year-ID Sort descending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
79-050 SPA $2,800.00 $2,800.00 $0.00 $0.00 $5,600.00 To establish vegetation in the area cleared for the FAA MALS/RAIL system which is associated with the partial instrument landing system.
80-036 SMS $20,750.00 $20,750.00 $373,500.00 $0.00 $415,000.00 Strengthen Runway 4/22, Partial parallel and connecting taxiways and apron.
80-034 SPA $9,957.11 $9,957.11 $179,228.00 $0.00 $199,142.22 Strengthen apron and taxiways C and D, install safety fencing approximate 15,830', install four additional threshold lights on runway 4/22.
80-033 GMU $15,000.00 $15,000.00 $0.00 $0.00 $30,000.00 Construct By-pass Taxiway Runway 36
80-032 MYR $26,287.00 $26,288.00 $210,301.00 $0.00 $262,876.00 Expansion of the Myrtle Beach Jetport aircraft parking apron.
80-031 MYR $46,933.50 $46,933.50 $0.00 $0.00 $93,867.00 Expansion of baggage claim area.
80-030 HYW $12,500.00 $12,500.00 $0.00 $0.00 $25,000.00 Paving of 2000' access road.
80-029 BNL $7,538.00 $17,494.00 $60,306.00 $0.00 $85,338.00 Relocation of Medium Intensity Runway lights on Runway 16/34 and Installation of Safety Fencing.
80-028 BNL $19,855.00 $19,855.00 $303,604.00 $0.00 $343,314.00 Resurface runway 16/34
80-027 JZI $34,000.00 $34,000.00 $0.00 $0.00 $68,000.00 Emergency repairs to taxiway pavement surfaces and deteriorated areas of drainage systems around and beneath these taxiways.
80-026 CAE $5,682.43 $5,682.43 $102,283.74 $0.00 $113,648.60 Grooving Runway 11/29 and reconstruction and strengthening of runway 5/23.
80-025 CAE $40,828.98 $40,828.98 $81,657.96 $0.00 $163,315.92 Installation of concourse elevators for the handicapped.
80-024 DCM $51,181.80 $51,181.80 $409,454.40 $0.00 $511,818.00 Reconstruct and mark runway 17/35, install MIRL, relocate and install new beacon, install segmented circle, wind cone and install non-directional beacon.
80-023 CKI $63,000.00 $33,000.00 $0.00 $0.00 $96,000.00 Construction of Terminal Building
80-022 AND $16,500.00 $16,500.00 $0.00 $0.00 $0.00 Install taxiway marker and identifier lights.
80-020 GYH $195,000.00 $195,000.00 $0.00 $0.00 $0.00 Purchase and installation of an instrument landing system for runway 4.
80-019 FLO $15,038.00 $0.00 $0.00 $0.00 $15,038.00 Strengthen taxiways "G", "J", "K" and a portion of Twy "B".
80-018 52J $13,115.00 $13,115.00 $0.00 $0.00 $26,230.00 Clearing of approaches and transitional surfaces.
80-017 SMS $16,560.00 $20,460.00 $333,180.00 $0.00 $370,200.00 A. Easement acquisition for clear zones & transitional surfaces to runway 4-22; B. Clearing in clear zones and transitional surfaces; C. Rehabilitation of drainage systems; D. Extend runway safety areas.
80-016 GSP $10,000.00 $10,000.00 $0.00 $0.00 $20,000.00 Clearing and grubbing for installation of MALS/RAILS on runway 21, to include approximately 300' of security fencing for the light lane.