20-007 GMU $23,503.00 $15,668.00 $0.00 $0.00 $39,171.00 Installation of nine (9) security cameras at all electronic gate access points and repair of landslide at the approach end of Runway 1 Amendment 1 - Project was amended on 06-18-2020 to add small amount of fence relocation and power gate. This will be added using 60/40 program. Amount added to project was $14,635 ($8,781 State/$5,854 Local)
20-006 3J0 $871,793.72 $600,625.12 $0.00 $0.00 $1,472,418.84 Construct taxiway parallel to Runway 11/29, construct hangar sitework and taxilanes for new hangar development
20-004 NA $27,886.00 $0.00 $0.00 $0.00 $27,886.00 Outreach, Education and Aviation Training Program (including mobile virtual reality flight simulators and Lowcountry Instructional Flight Training day camps)
20-003 UDG $18,000.00 $12,000.00 $0.00 $0.00 $30,000.00 Terminal Parking Lot Rehabilitation
20-002 CUB $22,350.00 $7,450.00 $0.00 $0.00 $29,800.00 Paint apron lighting poles
20-001 AQX $7,594.00 $5,062.00 $0.00 $0.00 $12,656.00 Purchase and install security cameras near hangars
19-049 HVS $500,000.00 $0.00 $0.00 $0.00 $500,000.00 South Carolina Legislative Special Appropriation $500,000 at 100% State funding to be used for Hartsville Regional Airport Terminal and Terminal Area Development
19-047 MNI $18,671.00 $18,672.00 $336,087.00 $0.00 $373,430.00 Perimeter Fence and Windsock (Construction)
19-046 PYG $9,000.00 $9,000.00 $162,000.00 $0.00 $180,000.00 Acquire Land (Parcel 046 000 000 315) 1.4 AC
19-045 RBW $189,880.00 $189,880.00 $3,417,832.00 $0.00 $3,797,592.00 Airfield Drainage Improvements
19-044 GMU $572,665.00 $381,776.00 $0.00 $0.00 $954,441.00 Construct Airport Parking Lot Supplemental parking lot to serve Runway Park, the Military History Center and to support special events held at Greenville Downtown Airport
19-043 AQX $14,095.00 $14,097.00 $253,730.00 $0.00 $281,922.00 Improve Airport Drainage (Design) Project amended on 3/18/2021 to add $36,772 project cost ($33,905 FAA/$1,839 Local/$18,38 State) New totals are $281,922 FAA/$14,097 Local/$14,095 State
19-042 HVS $8,328.00 $8,328.00 $149,905.00 $0.00 $166,561.00 Terminal Building and Airport Access Road (Design and Bidding)
19-041 6J0 $43,621.00 $43,620.00 $785,171.00 $0.00 $872,412.00 North Apron Reconstruction (Construction)
19-040 35A $16,173.00 $16,172.00 $291,105.00 $0.00 $323,450.00 Rwy 23 Approach Land Acquisition Reimbursement (6 Acres)
19-039 DCM $13,750.00 $13,750.00 $247,500.00 $0.00 $275,000.00 Runway Rejuvenation, crack sealing, remarking
19-038 6J4 $6,338.00 $6,338.00 $114,084.00 $0.00 $126,760.00 Apron and Taxiway Reconstruction (Design/Bid)
19-037 BPP $51,074.00 $44,325.00 $554,861.00 $0.00 $650,260.00 Apron Pavement Rehabilitation (Construction) AIP and Non-AIP Project consists of AIP ($616,513 @ 90/5/5) and Non-AIP eligible portions ($33,747 @ 60/40). Total SCAC Grant $51,074.
19-036 UDG $231,458.00 $267,503.00 $4,130,201.00 $0.00 $4,629,162.00 Rehabilitate Runway 5-23 (Construction)
19-035 OGB $8,500.00 $8,500.00 $153,000.00 $0.00 $170,000.00 Main Apron Expansion (Design/Bid)