Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
23-029 HXD $12,000,000.00 $2,160,000.00 $21,600,000.00 $3,000,000.00 $38,760,000.00 Terminal Construction
23-028 MYR $500,000.00 $74,500,000.00 $35,000,000.00 $0.00 $110,000,000.00 Terminal Expansion (Design, Program Management, Construction)
23-027 GSP $500,000.00 $13,800,000.00 $0.00 $0.00 $14,300,000.00 FBO Terminal Expansion and Improvement Project
23-026 FLO $500,000.00 $25,013.00 $3,688,593.00 $0.00 $4,213,606.00 Rehabilitate Taxiways B, B-3, B-4, and D (Construction)
23-025 HXD $378,044.00 $0.00 $2,993,835.00 $0.00 $3,371,879.00 Taxiway F Strengthening (Construction) Exec Air Land Acquisition
23-024 S19 $53,226.00 $13,307.00 $0.00 $0.00 $66,533.00 Obstruction Removal and Mitigation
23-023 52J $26,694.00 $26,695.00 $480,506.00 $0.00 $533,895.00 Wildlife Perimeter Fence (Design, Bidding, Env Documentation, DBE Plan, Rebid and Construction)
23-022 DCM $6,883.00 $6,884.00 $123,903.00 $0.00 $137,670.00 Airport Lighting Rehabilitation (Design/Bidding)
23-021 BNL $78,254.00 $78,254.00 $1,408,576.00 $0.00 $1,565,084.00 Taxiway Lighting and Signage Rehabilitation (Construction) Project amended on 8/15/2023 in the amount of $23,424 (total amount now $78,254). The FAA agreed to provide additional funding for additive bids. Amendment is to provide SCAC funds to match the additional FAA dollars.
23-020 GSP $8,939,049.01 $8,510,950.99 $0.00 $0.00 $17,450,000.00 Terminal Roadway Improvement Project (TRIP)
23-019 HXD $3,000,000.00 $2,160,000.00 $21,600,000.00 $12,000,000.00 $38,760,000.00 Terminal Construction
23-018 MYR $7,919,063.21 $67,080,936.79 $35,000,000.00 $0.00 $110,000,000.00 Terminal Expansion (design, program management, construction)
23-016 SPA $194,010.00 $129,340.00 $0.00 $0.00 $323,350.00 Airport Water & Sewer Line Installation (Construction)
23-015 6J4 $18,112.00 $6,038.00 $0.00 $0.00 $24,150.00 Sanding and rust removal from the large hangar/terminal building and Quonset Hut and painting those two buildings to prevent furture damage from rust.
23-014 UZA $9,895.00 $3,298.00 $0.00 $0.00 $13,193.00 Automated Vehicle Gate Replacement
23-013 LQK $34,140.00 $22,760.00 $0.00 $0.00 $56,900.00 Runway End 23 Crossfield Apron Expansion - Design
23-012 S19 $171,044.00 $42,760.00 $0.00 $0.00 $213,804.00 Airport Grading Coordination + Environmental Services
23-011 MAO $17,116.00 $17,116.00 $308,086.00 $0.00 $342,318.00 ALP Update (Including 18B Survey) Independent Fee Estimate (IFE Reimbursement)
23-010 HVS $23,620.00 $15,747.00 $0.00 $0.00 $39,367.00 Create a Stormwater Pollution Prevention Plan (SWPPP)
23-009 MKS $34,022.00 $22,682.00 $0.00 $0.00 $56,704.00 Installation of a 3-phase generator near fuel farm to provide uniterrupted service in the event of a natural disaster.