18-018 |
CUB |
$10,883.00 |
$11,217.00 |
$195,900.00 |
$0.00 |
$218,000.00 |
Twy B Extension Wetland Mitigation Monitoring (Yr 3-5); Rehabilitate Perimeter Fencing (11,000 LF) - Design; Rehabilitate Access Road - Design; Rehabilitate Twy A5 (300 LF) - Design; Improve Airport Drainage (Structures, Culvert, Retaining Wall - Design; Rehabilitate Apron (Compass Calibration Pad Installation) |
18-017 |
SPA |
$22,340.00 |
$22,340.00 |
$402,114.00 |
$0.00 |
$446,794.00 |
Update Airport Master Plan, Acquire Land in Rwy 23 Approach (Reimbursement) 4 Parcels |
18-016 |
FLO |
$55,555.00 |
$55,556.00 |
$1,000,000.00 |
$0.00 |
$1,111,111.00 |
Replace Twy A Lights, PAPI's, REIL's, Convert Wind Sock and Distance Remaining Signs to LED (Design). Phase 1 Construction of Vault and Wind Cone |
18-015 |
UZA |
$11,700.00 |
$11,700.00 |
$210,602.00 |
$0.00 |
$234,002.00 |
Rwy 20 Obstruction Removal |
18-014 |
CRE |
$364,127.00 |
$364,127.75 |
$6,554,292.75 |
$0.00 |
$7,282,547.50 |
Rehabilitate Rwy 5/23 |
18-013 |
GMU |
$172,200.00 |
$156,250.00 |
$2,238,297.00 |
$0.00 |
$2,566,747.00 |
Rehabilitate Airfield Lighting for Rwy 01-19, Twy A and Twy B, Rehabilitate Rwy 01 MALSF System. Prepare Stormwater Master Plan, Update Stormwater Pollution Prevention Plan. |
18-012 |
ARW |
$60,841.00 |
$60,841.00 |
$1,095,143.00 |
$0.00 |
$1,216,825.00 |
Replace Runway/Taxiway Edge Lights, PAPI's, REIL's, Windsock, Vault and Signage (Design and Construction) |
18-011 |
CDN |
$102,924.00 |
$102,924.00 |
$1,852,627.00 |
$0.00 |
$2,058,475.00 |
Improve Airport Drainage (9,700 LF)
Note: The FAA reduced the eligible amount for this grant, resulting in overpayment to Kershaw County of $13,152.72. This overpayment was balanced by reducing state participation on grant 23-055 (the 60/40 grant to assist with the FAA's reduction in eligibility) |
18-010 |
CEU |
$38,890.00 |
$38,890.00 |
$700,017.00 |
$0.00 |
$777,797.00 |
Land Acquisition - Rwy 7 Approach (Property and Relocation)
Terminal Apron Expansion (30,000 SY) Design
Project also includes Amendment to provide State Participation in FAA grant for Terminal Area Planning
FAA: |
18-009 |
HXD |
$110,095.00 |
$110,095.78 |
$1,981,717.00 |
$0.00 |
$2,201,907.77 |
Land Acquisition Reimbursement (Rwy 3/21) |
18-007 |
AND |
$500,000.00 |
$1,302,826.00 |
$0.00 |
$1,700,000.00 |
$3,502,826.00 |
New General Aviation Terminal Building |
18-004 |
AND |
$290,537.00 |
$1,476,247.00 |
$5,229,650.00 |
$0.00 |
$6,996,434.00 |
Rehabilitate center 100' width of runway 5/23 |
18-003 |
RBW |
$31,778.00 |
$31,778.00 |
$572,000.00 |
$0.00 |
$635,556.00 |
Acquire airfield emergency generator and Phase II - airfield drainage repairs. |
18-002 |
CRE |
$31,522.00 |
$31,522.00 |
$567,399.00 |
$0.00 |
$630,443.00 |
Engineering design services for rehabilitating runway 5/23 |
18-001 |
HYW |
$8,334.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,668.00 |
Engineering design and site development services for installing a 4-box PAPI system |
17-024 |
FDW |
$0.00 |
$39,000.00 |
$702,000.00 |
$0.00 |
$0.00 |
Rehabilitate runway and taxiway lighting system |
17-023 |
GGE |
$10,622.00 |
$10,622.00 |
$191,192.00 |
$0.00 |
$212,436.00 |
Engineering design services to expand apron by 4,330 SY, engineering services to improve airport drainage, and runway 5/23 obstruction analysis. |
17-022 |
6J2 |
$23,540.00 |
$23,540.00 |
$423,725.00 |
$0.00 |
$470,805.00 |
Land acquisition of 7 pacels of property totally 49.29 acres, including tree obstuction removal within the 7 parcels. |
17-021 |
RBW |
$500,000.00 |
$1,819,719.00 |
$0.00 |
$0.00 |
$2,319,719.00 |
Renovate and Expand Terminal Building |
17-020 |
GMU |
$10,500.00 |
$3,500.00 |
$0.00 |
$0.00 |
$14,000.00 |
RWY 10 approach - obstruction tree removal |