South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
17-005 GRD $10,502.00 $10,502.00 $189,041.00 $0.00 $210,045.00 Rehabilitate asphalt entrance road and auto parking lot
17-004 CQW $10,175.00 $10,175.00 $183,145.00 $0.00 $203,495.00 Engineering design and easement analysis for obstruction removal
17-003 LUX $14,529.00 $14,529.00 $261,529.00 $0.00 $290,587.00 Rehabilitate auto parking area with concrete pavement
17-002 GMU $17,554.00 $17,555.00 $315,983.00 $0.00 $351,092.00 Engineering design services for airfield lighting system rehab to RWY 1/19, TWY "A" & TWY "B" , MALSF system to RWY 1, including taxiway "B" pavement design services.
16-034 AND $36,737.00 $36,737.00 $661,268.00 $0.00 $734,742.00 Phase II - Acquire avigation easements and remove trees in the approach to runway 23.
16-033 HYW $35,845.00 $35,845.00 $645,216.00 $0.00 $716,906.00 Rehabilitate runway and taxiway edge lighting system, including a new lighted wind cone frame.
16-032 GYH $40,729.00 $40,729.00 $733,125.00 $0.00 $814,583.00 (1) RWY 5/23 concerete joint replacement, asphalt rejuvenation, and remarking the runway (2) Engineering design services for reconstructing the north section of TWY "A"
16-031 PYG $6,100.00 $6,100.00 $109,800.00 $0.00 $122,000.00 Install a 2-box PAPI system, engineering design services for a taxiway turnaround, and developing a disadvantage business enterprise plan.
16-030 3J1 $434,563.00 $1,054,048.00 $13,397,499.00 $0.00 $14,886,110.00 (A) Acquire property both in fee simple and easement. (B) Phase I - Clearing, grading and drainage for realign runway © Phase II and III - Pave and light realign runway
16-029 HXD $1,050,718.00 $1,050,718.00 $18,912,922.00 $0.00 $21,014,358.00 (A) Design and bidding reimbursement services for runway 3/21 extension and west side drainage improvements (B) Construction services for extending each end of runway 3/21 © Taxiway "F" infield drainage improvements and mitigation services (D) Construct EMAS on end of RWY 21 12-18-2019 Note: The Quality Enterprises Rwy 21 Extension has a change order to balance final quantities in the amount of $847,870.83 (not yet included in this grant as of 12-18-2019)
16-028 SPA $18,700.00 $18,700.00 $336,602.00 $0.00 $374,002.00 Acquire .25 acres in the approach of runway 23 (James Eillis Proctor property) and for FAA reimbursement services for relocating runway 5/23 navaids.
16-027 FLO $262,605.00 $262,605.00 $4,726,894.00 $0.00 $5,252,104.00 Rehabilitate airfield drainage system
16-026 FLO $35,530.00 $35,531.00 $639,554.00 $0.00 $710,615.00 Aircraft rescue and firefighting (ARFF) site construction and architect and engineering redesign services
16-025 RBW $56,249.00 $56,249.00 $1,012,482.00 $0.00 $1,124,980.00 Phase I construction services for apron drainage repairs and engineering design services for a Phase II airfield drainage analysis.
16-024 CUB $4,200.00 $4,200.00 $75,600.00 $0.00 $84,000.00 Engineering design services for installing airfield guidance signs
16-023 CDN $9,500.00 $9,500.00 $171,000.00 $0.00 $190,000.00 Engineering design services for improving the airport drainage system.
16-020 DYB $9,229.00 $9,229.00 $166,118.00 $0.00 $184,576.00 Land acquisition - acquire 82.83 acres of Darlington Veneer to remove obstructive trees from approach end of RWY 6.
16-019 GRD $2,872.00 $2,872.00 $51,689.00 $0.00 $57,433.00 Design and bidding services for auto parking lot rehabilititation
16-018 DYB $9,580.00 $6,388.00 $0.00 $0.00 $15,968.00 Vehicle gate operator improvements
16-017 MKS $113,767.00 $113,767.00 $2,047,806.00 $0.00 $2,275,340.00 Phase II - Relocate power lines in runway 5 approach