17-005 |
GRD |
$10,502.00 |
$10,502.00 |
$189,041.00 |
$0.00 |
$210,045.00 |
Rehabilitate asphalt entrance road and auto parking lot |
17-004 |
CQW |
$10,175.00 |
$10,175.00 |
$183,145.00 |
$0.00 |
$203,495.00 |
Engineering design and easement analysis for obstruction removal |
17-003 |
LUX |
$14,529.00 |
$14,529.00 |
$261,529.00 |
$0.00 |
$290,587.00 |
Rehabilitate auto parking area with concrete pavement |
17-002 |
GMU |
$17,554.00 |
$17,555.00 |
$315,983.00 |
$0.00 |
$351,092.00 |
Engineering design services for airfield lighting system rehab to RWY 1/19, TWY "A" & TWY "B" , MALSF system to RWY 1, including taxiway "B" pavement design services. |
16-034 |
AND |
$36,737.00 |
$36,737.00 |
$661,268.00 |
$0.00 |
$734,742.00 |
Phase II - Acquire avigation easements and remove trees in the approach to runway 23. |
16-033 |
HYW |
$35,845.00 |
$35,845.00 |
$645,216.00 |
$0.00 |
$716,906.00 |
Rehabilitate runway and taxiway edge lighting system, including a new lighted wind cone frame. |
16-032 |
GYH |
$40,729.00 |
$40,729.00 |
$733,125.00 |
$0.00 |
$814,583.00 |
(1) RWY 5/23 concerete joint replacement, asphalt rejuvenation, and remarking the runway
(2) Engineering design services for reconstructing the north section of TWY "A" |
16-031 |
PYG |
$6,100.00 |
$6,100.00 |
$109,800.00 |
$0.00 |
$122,000.00 |
Install a 2-box PAPI system, engineering design services for a taxiway turnaround, and developing a disadvantage business enterprise plan. |
16-030 |
3J1 |
$434,563.00 |
$1,054,048.00 |
$13,397,499.00 |
$0.00 |
$14,886,110.00 |
(A) Acquire property both in fee simple and easement.
(B) Phase I - Clearing, grading and drainage for realign runway
© Phase II and III - Pave and light realign runway |
16-029 |
HXD |
$1,050,718.00 |
$1,050,718.00 |
$18,912,922.00 |
$0.00 |
$21,014,358.00 |
(A) Design and bidding reimbursement services for runway 3/21 extension and west side drainage improvements
(B) Construction services for extending each end of runway 3/21
© Taxiway "F" infield drainage improvements and mitigation services
(D) Construct EMAS on end of RWY 21
12-18-2019 Note: The Quality Enterprises Rwy 21 Extension has a change order to balance final quantities in the amount of $847,870.83 (not yet included in this grant as of 12-18-2019) |
16-028 |
SPA |
$18,700.00 |
$18,700.00 |
$336,602.00 |
$0.00 |
$374,002.00 |
Acquire .25 acres in the approach of runway 23 (James Eillis Proctor property) and for FAA reimbursement services for relocating runway 5/23 navaids. |
16-027 |
FLO |
$262,605.00 |
$262,605.00 |
$4,726,894.00 |
$0.00 |
$5,252,104.00 |
Rehabilitate airfield drainage system |
16-026 |
FLO |
$35,530.00 |
$35,531.00 |
$639,554.00 |
$0.00 |
$710,615.00 |
Aircraft rescue and firefighting (ARFF) site construction and architect and engineering redesign services |
16-025 |
RBW |
$56,249.00 |
$56,249.00 |
$1,012,482.00 |
$0.00 |
$1,124,980.00 |
Phase I construction services for apron drainage repairs and engineering design services for a Phase II airfield drainage analysis. |
16-024 |
CUB |
$4,200.00 |
$4,200.00 |
$75,600.00 |
$0.00 |
$84,000.00 |
Engineering design services for installing airfield guidance signs |
16-023 |
CDN |
$9,500.00 |
$9,500.00 |
$171,000.00 |
$0.00 |
$190,000.00 |
Engineering design services for improving the airport drainage system. |
16-020 |
DYB |
$9,229.00 |
$9,229.00 |
$166,118.00 |
$0.00 |
$184,576.00 |
Land acquisition - acquire 82.83 acres of Darlington Veneer to remove obstructive trees from approach end of RWY 6. |
16-019 |
GRD |
$2,872.00 |
$2,872.00 |
$51,689.00 |
$0.00 |
$57,433.00 |
Design and bidding services for auto parking lot rehabilititation |
16-018 |
DYB |
$9,580.00 |
$6,388.00 |
$0.00 |
$0.00 |
$15,968.00 |
Vehicle gate operator improvements |
16-017 |
MKS |
$113,767.00 |
$113,767.00 |
$2,047,806.00 |
$0.00 |
$2,275,340.00 |
Phase II - Relocate power lines in runway 5 approach |