Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
16-016 LUX $51,003.00 $51,003.00 $918,054.00 $0.00 $1,020,060.00 Rehabilitate a portion of the parallel taxiway by of a concrete overlay.
16-015 FDW $8,500.00 $8,500.00 $150,000.00 $0.00 $167,000.00 Design services for rehabilitating runway 4/22 medium intensity lighting and connecting taxiway edge lighting system.
16-014 HXD $55,615.00 $55,615.00 $1,001,077.00 $0.00 $1,112,307.00 Acquire property to meet FAA's object free area standards for runway 3/21, including business relocation expenses.
16-013 GMU $75,966.00 $25,322.00 $0.00 $0.00 $0.00 Replace EMAS arresting bed joint tape
16-012 GMU $20,862.00 $20,862.00 $375,512.00 $0.00 $417,236.00 Fee simple acquistion of 2.37 acres of land along airport road
16-011 UZA $209,609.00 $209,609.00 $3,772,962.00 $0.00 $4,192,180.00 Rehabilitate parallel taxiway and taxiway filet widening
16-010 SMS $4,974.00 $4,974.00 $89,536.00 $0.00 $99,484.00 Engineering design and bidding services for replacing airfield lighting with LED fixtures, including PAPIS and REILS.
16-009 3J1 $36,452.00 $24,301.00 $0.00 $0.00 $60,753.00 Rehabilitate apron/hangar taxilane Original grant $29,912/$19,941 (60%/40%) Project amended on February 12th to add more paving and drainage improvements New grant $36,452/$24,301
16-008 3J1 $85,151.00 $85,152.00 $1,532,727.00 $0.00 $1,703,030.00 Land acquisition - (Bedell tracts - tax map 661 and 14801)
16-007 RBW $17,996.00 $17,996.00 $323,927.00 $0.00 $359,919.00 (A)Update airport layout plan (B) Airfield drainage study (C) Engineering design services for drainage repairs in the apron area
16-006 SPA $474,743.00 $474,743.00 $8,545,378.00 $0.00 $9,494,864.00 Phase II site preparation for 600' runway extension
16-005 CEU $14,445.00 $9,630.00 $0.00 $0.00 $24,075.00 Vehicle access control arm gate barrier
16-004 SMS $62,541.00 $41,694.00 $64,782.00 $0.00 $169,017.00 Taxi lane paving next to a 15,000 SF hangar.
16-003 GRD $21,564.00 $21,564.00 $151,847.00 $0.00 $194,975.00 Concrete apron joint sealing and spall repairs including replacement of the HVAC system.
16-002 FDW $8,140.00 $8,140.00 $146,516.00 $0.00 $162,796.00 Update the airport layout plan
16-001 LKR $8,005.00 $8,005.00 $144,089.00 $0.00 $160,099.00 Design and permitting services for an aircraft parking apron
15-021 CUB $29,184.00 $29,184.00 $525,312.00 $0.00 $583,680.00 Southeast airfield clearing and grading improvements
15-020 35A $18,005.00 $18,005.00 $324,090.00 $0.00 $360,100.00 Acquire land for approach clearing
15-019 MKS $124,678.00 $124,678.00 $2,244,208.00 $0.00 $2,493,564.00 Phase I - Relocate power lines on approach end of runway 5, including an enviromental assessment
15-018 AIK $125,627.00 $125,627.00 $2,261,288.00 $0.00 $2,512,542.00 Apron expansion and rehabilitation