16-032 |
GYH |
$40,729.00 |
$40,729.00 |
$733,125.00 |
$0.00 |
$814,583.00 |
(1) RWY 5/23 concerete joint replacement, asphalt rejuvenation, and remarking the runway
(2) Engineering design services for reconstructing the north section of TWY "A" |
16-031 |
PYG |
$6,100.00 |
$6,100.00 |
$109,800.00 |
$0.00 |
$122,000.00 |
Install a 2-box PAPI system, engineering design services for a taxiway turnaround, and developing a disadvantage business enterprise plan. |
16-030 |
3J1 |
$434,563.00 |
$1,054,048.00 |
$13,397,499.00 |
$0.00 |
$14,886,110.00 |
(A) Acquire property both in fee simple and easement.
(B) Phase I - Clearing, grading and drainage for realign runway
© Phase II and III - Pave and light realign runway |
16-029 |
HXD |
$1,050,718.00 |
$1,050,718.00 |
$18,912,922.00 |
$0.00 |
$21,014,358.00 |
(A) Design and bidding reimbursement services for runway 3/21 extension and west side drainage improvements
(B) Construction services for extending each end of runway 3/21
© Taxiway "F" infield drainage improvements and mitigation services
(D) Construct EMAS on end of RWY 21
12-18-2019 Note: The Quality Enterprises Rwy 21 Extension has a change order to balance final quantities in the amount of $847,870.83 (not yet included in this grant as of 12-18-2019) |
16-028 |
SPA |
$18,700.00 |
$18,700.00 |
$336,602.00 |
$0.00 |
$374,002.00 |
Acquire .25 acres in the approach of runway 23 (James Eillis Proctor property) and for FAA reimbursement services for relocating runway 5/23 navaids. |
16-027 |
FLO |
$262,605.00 |
$262,605.00 |
$4,726,894.00 |
$0.00 |
$5,252,104.00 |
Rehabilitate airfield drainage system |
16-026 |
FLO |
$35,530.00 |
$35,531.00 |
$639,554.00 |
$0.00 |
$710,615.00 |
Aircraft rescue and firefighting (ARFF) site construction and architect and engineering redesign services |
16-025 |
RBW |
$56,249.00 |
$56,249.00 |
$1,012,482.00 |
$0.00 |
$1,124,980.00 |
Phase I construction services for apron drainage repairs and engineering design services for a Phase II airfield drainage analysis. |
16-024 |
CUB |
$4,200.00 |
$4,200.00 |
$75,600.00 |
$0.00 |
$84,000.00 |
Engineering design services for installing airfield guidance signs |
16-023 |
CDN |
$9,500.00 |
$9,500.00 |
$171,000.00 |
$0.00 |
$190,000.00 |
Engineering design services for improving the airport drainage system. |
16-020 |
DYB |
$9,229.00 |
$9,229.00 |
$166,118.00 |
$0.00 |
$184,576.00 |
Land acquisition - acquire 82.83 acres of Darlington Veneer to remove obstructive trees from approach end of RWY 6. |
16-019 |
GRD |
$2,872.00 |
$2,872.00 |
$51,689.00 |
$0.00 |
$57,433.00 |
Design and bidding services for auto parking lot rehabilititation |
16-018 |
DYB |
$9,580.00 |
$6,388.00 |
$0.00 |
$0.00 |
$15,968.00 |
Vehicle gate operator improvements |
16-017 |
MKS |
$113,767.00 |
$113,767.00 |
$2,047,806.00 |
$0.00 |
$2,275,340.00 |
Phase II - Relocate power lines in runway 5 approach |
16-016 |
LUX |
$51,003.00 |
$51,003.00 |
$918,054.00 |
$0.00 |
$1,020,060.00 |
Rehabilitate a portion of the parallel taxiway by of a concrete overlay. |
16-015 |
FDW |
$8,500.00 |
$8,500.00 |
$150,000.00 |
$0.00 |
$167,000.00 |
Design services for rehabilitating runway 4/22 medium intensity lighting and connecting taxiway edge lighting system. |
16-014 |
HXD |
$55,615.00 |
$55,615.00 |
$1,001,077.00 |
$0.00 |
$1,112,307.00 |
Acquire property to meet FAA's object free area standards for runway 3/21, including business relocation expenses. |
16-013 |
GMU |
$75,966.00 |
$25,322.00 |
$0.00 |
$0.00 |
$0.00 |
Replace EMAS arresting bed joint tape |
16-012 |
GMU |
$20,862.00 |
$20,862.00 |
$375,512.00 |
$0.00 |
$417,236.00 |
Fee simple acquistion of 2.37 acres of land along airport road |
16-011 |
UZA |
$209,609.00 |
$209,609.00 |
$3,772,962.00 |
$0.00 |
$4,192,180.00 |
Rehabilitate parallel taxiway and taxiway filet widening |