15-017 |
CEU |
$11,990.00 |
$11,990.00 |
$215,820.00 |
$0.00 |
$239,800.00 |
Runway 7 land acquisition (portion of Mt. Nebo Church and Carolyn Brooks 7.1 acres) |
15-016 |
HXD |
$242,136.00 |
$242,136.00 |
$4,358,453.00 |
$0.00 |
$4,842,725.00 |
Runway 3/21 land acquisition to clear the runway object free area. |
15-015 |
CDN |
$122,184.00 |
$122,184.00 |
$2,199,318.00 |
$0.00 |
$2,443,686.00 |
Runway safety area improvements, obstruction removal and offsite roadway enhancements |
15-014 |
GGE |
$50,122.00 |
$50,122.00 |
$902,201.00 |
$0.00 |
$1,002,445.00 |
Expand apron and conduct an environmental assessment for a future land acquisition project to clear obsructions in the approach ends of runway 5/23. |
15-013 |
HXD |
$481,905.00 |
$481,905.00 |
$8,674,296.00 |
$0.00 |
$9,638,106.00 |
Runway 3 off-airport property tree removal, parallel TWY "A" relocation, and apron replacement |
15-012 |
CQW |
$12,262.00 |
$12,263.00 |
$220,724.00 |
$0.00 |
$245,249.00 |
Environmental assessment determination to clear off airport obstructions |
15-011 |
CEU |
$36,439.00 |
$36,439.00 |
$655,899.00 |
$0.00 |
$728,777.00 |
Construct new stub taxiway "A-2", re-designate taxiway signage, and remark the airfield. |
15-010 |
UDG |
$30,585.00 |
$30,585.00 |
$550,526.00 |
$0.00 |
$611,696.00 |
Install new runway edge lights on RWY 5/23, remove asphalt pavement shoulders, update Exhibit A |
15-009 |
ARW |
$19,725.00 |
$19,725.00 |
$355,048.00 |
$0.00 |
$394,498.00 |
Design services for RWY 7 tree removal, environmental assessment services for runway safety area improvements and the site area to complete a full parallel taxiway |
15-008 |
GMU |
$6,337.00 |
$6,338.00 |
$114,075.00 |
$0.00 |
$126,750.00 |
Obstruction removal in the approach to RWY 19 |
15-004 |
CKI |
$9,605.00 |
$60,725.00 |
$632,085.00 |
$0.00 |
$702,415.00 |
Engineering and administration services associated with construction paving and fencing surrounding a 10 unit T-Hangar |
15-003 |
UZA |
$8,328.00 |
$8,329.00 |
$149,913.00 |
$0.00 |
$166,570.00 |
Airport layout plan update |
15-002 |
GMU |
$26,654.00 |
$26,654.00 |
$0.00 |
$0.00 |
$53,308.00 |
Retrofit and replace incandescent lighting fixtures in terminal building and replace airfield sodium vapor security light fixtures using low energy LED fixtures. |
14-030 |
CDN |
$72,125.00 |
$72,125.00 |
$1,298,250.00 |
$0.00 |
$1,442,500.00 |
Phase III - Runway 6/24 land acquisition (27 Parcels) |
14-029 |
SPA |
$431,443.00 |
$431,443.00 |
$7,765,973.00 |
$0.00 |
$8,628,859.00 |
Phase I - Extend Runway 23 by 600' (To 5,800'). Engineering Design and Construction Services for Environmental Mitigation and Site Prep |
14-028 |
6J4 |
$21,813.00 |
$21,813.00 |
$392,645.00 |
$0.00 |
$436,271.00 |
Install 15,000 Linear Feet of Perimeter Fencing Including Access Gates |
14-027 |
3J1 |
$33,333.00 |
$33,334.00 |
$600,000.00 |
$0.00 |
$666,667.00 |
Phase I - Preliminary Engineering Design Services For a 4200' X 75' Runway to include Final Engineering Design Plans and Specs for Clearing, Grading, and Drainage of a 4,200' X75' runway. |
14-026 |
HXD |
$45,430.00 |
$45,431.00 |
$817,750.00 |
$0.00 |
$908,611.00 |
(A) Reimbursable for the Environmental Categorical Exclusion Service (B) Engineering Design and Bidding Services for Relocate Taxiway "A "and the General Aviation Apron Including Realignment of Taxiway "F" (C) Engineering Design Services for an Airfield Drainage Plan (D) Remove Trees between Air Traffic Control Tower and the General Aviation Apron (E) Environmental Assessment for Removing Trees to Runway 03 Approach (F) Engineering Design and Construction Services For Relocate Remote Transmitter Receiver (RTR) |
14-025 |
FDW |
$89,638.00 |
$89,638.00 |
$1,613,480.00 |
$0.00 |
$1,792,756.00 |
Runway 4/22 Safety Area Improvements |
14-024 |
CQW |
$3,612.00 |
$3,612.00 |
$65,011.00 |
$0.00 |
$72,235.00 |
Engineering, administration, and legal services for identifying obstructions. |