Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
15-017 CEU $11,990.00 $11,990.00 $215,820.00 $0.00 $239,800.00 Runway 7 land acquisition (portion of Mt. Nebo Church and Carolyn Brooks 7.1 acres)
15-016 HXD $242,136.00 $242,136.00 $4,358,453.00 $0.00 $4,842,725.00 Runway 3/21 land acquisition to clear the runway object free area.
15-015 CDN $122,184.00 $122,184.00 $2,199,318.00 $0.00 $2,443,686.00 Runway safety area improvements, obstruction removal and offsite roadway enhancements
15-014 GGE $50,122.00 $50,122.00 $902,201.00 $0.00 $1,002,445.00 Expand apron and conduct an environmental assessment for a future land acquisition project to clear obsructions in the approach ends of runway 5/23.
15-013 HXD $481,905.00 $481,905.00 $8,674,296.00 $0.00 $9,638,106.00 Runway 3 off-airport property tree removal, parallel TWY "A" relocation, and apron replacement
15-012 CQW $12,262.00 $12,263.00 $220,724.00 $0.00 $245,249.00 Environmental assessment determination to clear off airport obstructions
15-011 CEU $36,439.00 $36,439.00 $655,899.00 $0.00 $728,777.00 Construct new stub taxiway "A-2", re-designate taxiway signage, and remark the airfield.
15-010 UDG $30,585.00 $30,585.00 $550,526.00 $0.00 $611,696.00 Install new runway edge lights on RWY 5/23, remove asphalt pavement shoulders, update Exhibit A
15-009 ARW $19,725.00 $19,725.00 $355,048.00 $0.00 $394,498.00 Design services for RWY 7 tree removal, environmental assessment services for runway safety area improvements and the site area to complete a full parallel taxiway
15-008 GMU $6,337.00 $6,338.00 $114,075.00 $0.00 $126,750.00 Obstruction removal in the approach to RWY 19
15-004 CKI $9,605.00 $60,725.00 $632,085.00 $0.00 $702,415.00 Engineering and administration services associated with construction paving and fencing surrounding a 10 unit T-Hangar
15-003 UZA $8,328.00 $8,329.00 $149,913.00 $0.00 $166,570.00 Airport layout plan update
15-002 GMU $26,654.00 $26,654.00 $0.00 $0.00 $53,308.00 Retrofit and replace incandescent lighting fixtures in terminal building and replace airfield sodium vapor security light fixtures using low energy LED fixtures.
14-030 CDN $72,125.00 $72,125.00 $1,298,250.00 $0.00 $1,442,500.00 Phase III - Runway 6/24 land acquisition (27 Parcels)
14-029 SPA $431,443.00 $431,443.00 $7,765,973.00 $0.00 $8,628,859.00 Phase I - Extend Runway 23 by 600' (To 5,800'). Engineering Design and Construction Services for Environmental Mitigation and Site Prep
14-028 6J4 $21,813.00 $21,813.00 $392,645.00 $0.00 $436,271.00 Install 15,000 Linear Feet of Perimeter Fencing Including Access Gates
14-027 3J1 $33,333.00 $33,334.00 $600,000.00 $0.00 $666,667.00 Phase I - Preliminary Engineering Design Services For a 4200' X 75' Runway to include Final Engineering Design Plans and Specs for Clearing, Grading, and Drainage of a 4,200' X75' runway.
14-026 HXD $45,430.00 $45,431.00 $817,750.00 $0.00 $908,611.00 (A) Reimbursable for the Environmental Categorical Exclusion Service (B) Engineering Design and Bidding Services for Relocate Taxiway "A "and the General Aviation Apron Including Realignment of Taxiway "F" (C) Engineering Design Services for an Airfield Drainage Plan (D) Remove Trees between Air Traffic Control Tower and the General Aviation Apron (E) Environmental Assessment for Removing Trees to Runway 03 Approach (F) Engineering Design and Construction Services For Relocate Remote Transmitter Receiver (RTR)
14-025 FDW $89,638.00 $89,638.00 $1,613,480.00 $0.00 $1,792,756.00 Runway 4/22 Safety Area Improvements
14-024 CQW $3,612.00 $3,612.00 $65,011.00 $0.00 $72,235.00 Engineering, administration, and legal services for identifying obstructions.