14-001 |
SMS |
$8,325.00 |
$48,894.00 |
$514,975.00 |
$0.00 |
$572,194.00 |
Phase II Land Acquisition and proposed Apron Rehabilitation and Expansion.
Construct Terminal Apron (7,650 SY) - Phase I - Design Only
Construct Taxilane (4,200 SY) - Phase I - Design Only
Acquire Land for Approaches - Runway Ends 5 and 23 - Five Parcels |
13-033 |
AQX |
$7,916.00 |
$7,917.00 |
$142,500.00 |
$0.00 |
$158,333.00 |
Perimeter Fencing - Design
Obstruction Removal - Design |
13-032 |
GGE |
$102,606.00 |
$102,606.00 |
$1,846,917.00 |
$0.00 |
$2,052,129.00 |
Rehabilitation of Taxiways A, B, and C. |
13-031 |
HVS |
$52,491.00 |
$52,492.00 |
$944,847.00 |
$0.00 |
$1,049,830.00 |
Runway Safety Area Development - Phase 2 - Construction (Including Obstruction Removal) |
13-030 |
35A |
$21,541.00 |
$21,542.00 |
$387,747.00 |
$0.00 |
$430,830.00 |
Update Airport Layout Plan; Remove Obstructions in Runway 5 and 23 Approaches (Design & Construction) |
13-028 |
MKS |
$25,927.00 |
$32,442.00 |
$525,324.00 |
$0.00 |
$583,693.00 |
Runway 23 Approach - Acquire Clearance Easements (Phase 1) on 28 parcels.
This phase includes all associated Title work, Surveys/Plats, Appraisals, Review Appraisals, Legal Fees, and Acquisition Costs of Easements. |
13-027 |
6J0 |
$37,230.00 |
$511,768.00 |
$453,184.00 |
$0.00 |
$1,002,182.00 |
ALP Update (including Business Plan) and T-hangar, Taxilane & Fencing Project |
13-026 |
PYG |
$8,016.00 |
$12,140.00 |
$181,398.00 |
$0.00 |
$201,554.00 |
Construction of Stub Taxiway |
13-025 |
GRD |
$8,375.00 |
$8,375.00 |
$150,752.00 |
$0.00 |
$167,502.00 |
Design, pre-design investigation services and Permitting services for the pavement and lighting rehabilitation for Runway 9-27 at Greenwood County Airport. |
13-024 |
AIK |
$9,557.00 |
$9,557.00 |
$172,021.00 |
$0.00 |
$191,135.00 |
Security Fencing Project
The purpose of this project is to finish the remaining part of the airport perimeter fence project that was built in 2008. This project includes the installation of approximately 2,445' of new 8' chain link fence with 3-strand barbed wire and dual-leaf swing gates including wildlife deterrent treatment. |
13-023 |
BNL |
$7,086.00 |
$7,087.00 |
$127,555.00 |
$0.00 |
$141,728.00 |
ALP Update |
13-022 |
LQK |
$3,250.00 |
$23,800.00 |
$243,450.00 |
$0.00 |
$270,500.00 |
Land Acquisition within Approach to Runway 5 (Facilitation) of approximately 17 acres. |
13-021 |
UZA |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
Apron & Taxiway Rehabilitation (Design)
Design and subsequent construction will renew the look and condition, and will strengthen both surfaces which were recently given low PCN strength ratings. |
13-020 |
CUB |
$4,673.00 |
$4,673.00 |
$84,114.00 |
$0.00 |
$93,460.00 |
Taxiway Extension Design (Phase II); Land Acquisition Administrative Costs (6 acres)
This project eliminates a back taxiing requirement on RWY 31 approach, and assists with the administrative costs of acquiring approximately 6 acres of undeveloped property which will prevent non-compatible uses adjacent to the airport. |
13-019 |
AND |
$28,821.00 |
$29,021.00 |
$520,574.00 |
$0.00 |
$578,416.00 |
Runway 23 Avigation Easements (Phase 1)
This phase includes all associated Title work, Surveys/Plats, Appraisals, Review Appraisals, Legal Fees, and Acquisition Costs of Easements on 34 parcels. |
13-018 |
GMU |
$46,514.00 |
$46,515.00 |
$837,261.00 |
$0.00 |
$930,290.00 |
Refurbishing of the airfield signage system and installation of taxiway lights on taxiways "C" and "D". |
13-017 |
PHH |
$10,372.00 |
$10,372.00 |
$186,698.00 |
$0.00 |
$207,442.00 |
Construction of Hangar Taxiway
Provides direct access to the runway, and will be 25' wide and include the apron areas in front of the hangars. |
13-016 |
CRE |
$130,866.00 |
$130,866.00 |
$2,355,579.00 |
$0.00 |
$2,617,311.00 |
Ramp Rehabilitation - Schedule I - Construction and Construction Administration |
13-013 |
UDG |
$2,579.00 |
$2,579.00 |
$46,424.00 |
$0.00 |
$51,582.00 |
Apron and Taxilanes Rehabilitation Project - Phase 2 (Re-Design & Bidding - Repackaged). |
13-012 |
SPA |
$10,408.00 |
$17,742.00 |
$180,000.00 |
$0.00 |
$208,150.00 |
Runway/RSA Extension Environmental Assessment Study |