South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
14-018 CEU $22,511.00 $22,511.00 $405,205.00 $0.00 $450,227.00 Land acquisition to approach end of RWY 7 (4 Parcels, 2.5 acres); engineering design services for a stub TWY; and relocation of a power line.
14-017 CRE $160,303.00 $160,303.00 $2,885,445.00 $0.00 $3,206,051.00 Phase II - Rehabilitate terminal apron with a concrete overlay including construction and construction administration.
14-016 CUB $139,006.00 $139,006.00 $2,502,108.00 $0.00 $2,780,120.00 Phase I - TWY "A" extension (1000') - Environmental mitigation and construction
14-015 GGE $22,136.00 $22,136.00 $398,454.00 $0.00 $442,726.00 Construct T-hangar taxilanes
14-014 UDG $27,354.00 $27,354.00 $492,375.00 $0.00 $547,083.00 Asphalt rehabilitation of the apron and taxilane
14-013 MKS $33,269.00 $33,269.00 $598,840.00 $0.00 $665,378.00 Clear obstructions in the approach to RWY 23 (37 parcels)
14-012 AIK $9,740.00 $9,740.00 $175,325.00 $0.00 $194,805.00 Engineering & permitting services for expanded the terminal apron
14-010 GYH $7,080.00 $7,081.00 $127,448.00 $0.00 $141,609.00 Runway Safety Area and Drainage Improvements for RWY 5-23. Project includes the full design for the airfield and construction of Phase 1.
14-009 GRD $157,470.00 $157,470.00 $2,834,461.00 $0.00 $3,149,401.00 ALP Update; Bidding, Construction, Construction Phase Services, and Grant Services for the pavement and lighting rehabilitation for Runway 9-27.
14-007 EOE $56,242.00 $56,242.00 $1,012,345.00 $0.00 $1,124,829.00 Apron Rehabilitation and Expansion (Construction) Project consists of rehabilitation of the existing terminal apron and connectors from the apron to Taxiway 'A' and the expansion of the terminal apron.
14-006 3J1 $432,694.00 $114,923.00 $162,000.00 $0.00 $709,617.00 Acquisition of 8 fee simple parcels and 59 easements. Project covers the professional services for closing on the fee simple parcels, professional services for purchasing the easements, and the estimated costs of the easements.
14-005 UZA $103,301.00 $103,302.00 $1,859,426.00 $0.00 $2,066,029.00 Apron Rehabilitation (Construction) including construction administration, inspection and testing. This project includes the design of taxiway filet widening, and the repackaging of the taxiway rehabilitation design.
14-004 MAO $57,720.00 $38,480.00 $0.00 $0.00 $96,200.00 Marion County Airport Terminal Renovation including: New Rubber Roof, Re-glazing of windows, Window Tinting, Drop Ceiling, Paint, Carpet, VCT Tile, Outside Trim, Lighting, AC duct work, Handicap Ramps and hand rails, Bathroom sink lowering, installation of grab bars, and stall reconfiguration for ADA compliance.
14-002 GMU $14,790.00 $4,930.00 $0.00 $0.00 $19,720.00 Application of seal coat to terminal and hangar parking areas.
14-001 SMS $8,325.00 $48,894.00 $514,975.00 $0.00 $572,194.00 Phase II Land Acquisition and proposed Apron Rehabilitation and Expansion. Construct Terminal Apron (7,650 SY) - Phase I - Design Only Construct Taxilane (4,200 SY) - Phase I - Design Only Acquire Land for Approaches - Runway Ends 5 and 23 - Five Parcels
13-033 AQX $7,916.00 $7,917.00 $142,500.00 $0.00 $158,333.00 Perimeter Fencing - Design Obstruction Removal - Design
13-032 GGE $102,606.00 $102,606.00 $1,846,917.00 $0.00 $2,052,129.00 Rehabilitation of Taxiways A, B, and C.
13-031 HVS $52,491.00 $52,492.00 $944,847.00 $0.00 $1,049,830.00 Runway Safety Area Development - Phase 2 - Construction (Including Obstruction Removal)
13-030 35A $21,541.00 $21,542.00 $387,747.00 $0.00 $430,830.00 Update Airport Layout Plan; Remove Obstructions in Runway 5 and 23 Approaches (Design & Construction)
13-028 MKS $25,927.00 $32,442.00 $525,324.00 $0.00 $583,693.00 Runway 23 Approach - Acquire Clearance Easements (Phase 1) on 28 parcels. This phase includes all associated Title work, Surveys/Plats, Appraisals, Review Appraisals, Legal Fees, and Acquisition Costs of Easements.