14-001 SMS $8,325.00 $48,894.00 $514,975.00 $0.00 $572,194.00 Phase II Land Acquisition and proposed Apron Rehabilitation and Expansion. Construct Terminal Apron (7,650 SY) - Phase I - Design Only Construct Taxilane (4,200 SY) - Phase I - Design Only Acquire Land for Approaches - Runway Ends 5 and 23 - Five Parcels
13-033 AQX $7,916.00 $7,917.00 $142,500.00 $0.00 $158,333.00 Perimeter Fencing - Design Obstruction Removal - Design
13-032 GGE $102,606.00 $102,606.00 $1,846,917.00 $0.00 $2,052,129.00 Rehabilitation of Taxiways A, B, and C.
13-031 HVS $52,491.00 $52,492.00 $944,847.00 $0.00 $1,049,830.00 Runway Safety Area Development - Phase 2 - Construction (Including Obstruction Removal)
13-030 35A $21,541.00 $21,542.00 $387,747.00 $0.00 $430,830.00 Update Airport Layout Plan; Remove Obstructions in Runway 5 and 23 Approaches (Design & Construction)
13-028 MKS $25,927.00 $32,442.00 $525,324.00 $0.00 $583,693.00 Runway 23 Approach - Acquire Clearance Easements (Phase 1) on 28 parcels. This phase includes all associated Title work, Surveys/Plats, Appraisals, Review Appraisals, Legal Fees, and Acquisition Costs of Easements.
13-027 6J0 $37,230.00 $511,768.00 $453,184.00 $0.00 $1,002,182.00 ALP Update (including Business Plan) and T-hangar, Taxilane & Fencing Project
13-026 PYG $8,016.00 $12,140.00 $181,398.00 $0.00 $201,554.00 Construction of Stub Taxiway
13-025 GRD $8,375.00 $8,375.00 $150,752.00 $0.00 $167,502.00 Design, pre-design investigation services and Permitting services for the pavement and lighting rehabilitation for Runway 9-27 at Greenwood County Airport.
13-024 AIK $9,557.00 $9,557.00 $172,021.00 $0.00 $191,135.00 Security Fencing Project The purpose of this project is to finish the remaining part of the airport perimeter fence project that was built in 2008. This project includes the installation of approximately 2,445' of new 8' chain link fence with 3-strand barbed wire and dual-leaf swing gates including wildlife deterrent treatment.
13-023 BNL $7,086.00 $7,087.00 $127,555.00 $0.00 $141,728.00 ALP Update
13-022 LQK $3,250.00 $23,800.00 $243,450.00 $0.00 $270,500.00 Land Acquisition within Approach to Runway 5 (Facilitation) of approximately 17 acres.
13-021 UZA $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 Apron & Taxiway Rehabilitation (Design) Design and subsequent construction will renew the look and condition, and will strengthen both surfaces which were recently given low PCN strength ratings.
13-020 CUB $4,673.00 $4,673.00 $84,114.00 $0.00 $93,460.00 Taxiway Extension Design (Phase II); Land Acquisition Administrative Costs (6 acres) This project eliminates a back taxiing requirement on RWY 31 approach, and assists with the administrative costs of acquiring approximately 6 acres of undeveloped property which will prevent non-compatible uses adjacent to the airport.
13-019 AND $28,821.00 $29,021.00 $520,574.00 $0.00 $578,416.00 Runway 23 Avigation Easements (Phase 1) This phase includes all associated Title work, Surveys/Plats, Appraisals, Review Appraisals, Legal Fees, and Acquisition Costs of Easements on 34 parcels.
13-018 GMU $46,514.00 $46,515.00 $837,261.00 $0.00 $930,290.00 Refurbishing of the airfield signage system and installation of taxiway lights on taxiways "C" and "D".
13-017 PHH $10,372.00 $10,372.00 $186,698.00 $0.00 $207,442.00 Construction of Hangar Taxiway Provides direct access to the runway, and will be 25' wide and include the apron areas in front of the hangars.
13-016 CRE $130,866.00 $130,866.00 $2,355,579.00 $0.00 $2,617,311.00 Ramp Rehabilitation - Schedule I - Construction and Construction Administration
13-013 UDG $2,579.00 $2,579.00 $46,424.00 $0.00 $51,582.00 Apron and Taxilanes Rehabilitation Project - Phase 2 (Re-Design & Bidding - Repackaged).
13-012 SPA $10,408.00 $17,742.00 $180,000.00 $0.00 $208,150.00 Runway/RSA Extension Environmental Assessment Study