South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
12-016 GRD $6,976.00 $6,977.00 $125,578.00 $0.00 $139,531.00 Runway 9 Tree Obstruction Removal Project - Phase 1
12-015 LKR $7,594.00 $7,594.00 $136,698.00 $0.00 $151,886.00 Taxiway 'A' Pavement & Lighting Rehabilitation Project (Design Phase Only)
12-014 CQW $38,193.00 $38,193.15 $687,476.70 $0.00 $763,862.85 Construction, Lighting and Marking of the Final Segment of the Parallel Taxiway System to Runway 8/26
12-013 HXD $37,856.00 $37,857.39 $972,625.00 $0.00 $1,048,338.39 Environmental Assessment and Benefit Cost Analysis for Five-Year CIP, including a Traditional Cultural Properties Analysis requested by the State Historic Preservation Office, Phase III Data Recovery and Public Outreach Program resulting from discovering Mitchellville remnants at the end of Runway 21
12-012 OGB $10,433.00 $10,433.00 $111,458.00 $0.00 $132,324.00 Update the airport layout plan and develop an airport business plan.
12-011 MNI $14,550.00 $4,950.00 $0.00 $0.00 $19,500.00 Refurbish rotating beacon with new wiring and electrical motor. Clean lenses and replace glass as necessary. Repaint beacon tower and platform.
12-009 LUX $327,656.00 $263,999.00 $2,460,322.00 $0.00 $3,051,977.00 Rehabilitate RWY 8/26 and apron area with 5" concrete overlay. 152' paved overrun.
12-008 UZA $98,579.00 $98,584.00 $1,807,433.00 $0.00 $2,004,596.00 Rehabilitate Runway 2/20 with a two inch asphalt surface course, over a double surface treatment, including engineering design and construction services
12-007 OGB $2,120.00 $2,120.00 $0.00 $0.00 $4,240.00 Perform surveying services for creating approach surface drawings used in community/airport planning and land use development control.
12-006 CKI $37,072.00 $37,072.00 $1,408,746.00 $0.00 $1,482,890.00 Extend existing partial parallel taxiway to a full parallel for runway 14-32. Remove tree obstructions to meet 34:1 approach criteria per FAA Part 77 regulation
12-005 LUX $38,327.00 $26,959.00 $103,534.00 $0.00 $168,820.00 Engineering design services for rehabilitating runway 8/26, selected areas of parallel taxiway, and apron.
12-004 LUX $28,969.00 $19,312.00 $0.00 $0.00 $48,281.00 Engineering services for a runway 26 paved overrun and corporate hangar site prep project.
12-003 CDN $11,283.00 $11,283.00 $428,760.00 $0.00 $451,326.00 Professional service fees (admin, planning, engineering, legal, environmental, and appraisal services) for acquiring land and aviation easements within runway 6/24 safety area and approach corroders.
12-002 DYB $128,579.90 $181,955.00 $4,886,779.00 $0.00 $5,197,313.90 Pave and light a 1300' runway extension to approach end of Runway 6 including connecting parallel taxiway.
11-023 SMS $2,693.00 $5,202.00 $150,000.00 $0.00 $157,895.00 Facilitate land acquisition assistance and runway safety area cost overruns.
11-022 CDN $14,081.00 $4,694.00 $0.00 $0.00 $18,775.00 Replace rotating beacon and paint beacon tower
11-021 CEU $13,158.00 $13,158.00 $500,000.00 $0.00 $526,316.00 Supplemental erosion control associated with extended runway 25 and connecting parallel taxiway.
11-020A SPA $6,396.00 $6,396.00 $243,048.00 $0.00 $255,840.00 Amendment to 11-020: Rehabilitate terminal apron with 33,000 SY of new concrete and 29,000 SY of new asphalt including associated connecting taxiways.
11-020 SPA $86,400.00 $86,400.00 $3,283,200.00 $0.00 $3,456,000.00 Rehabilitate terminal apron with 33,000 SY of new concrete and 29,000 SY of new asphalt including associated connecting taxiways
11-019 GRD $6,750.00 $2,250.00 $0.00 $0.00 $9,000.00 Replace RWY 27 PAPI