Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
13-004 3J1 $102,045.00 $68,030.00 $0.00 $0.00 $170,075.00 Airport Layout Plan Update & Environmental Assessment. This request if the first of the planning, design, and construction of the newly re-aligned runway at the current site of the Ridgeland Airport. Re-alignment is necessary to bring the airport into FAA standards, and for the protection of the school across HWY 278.
13-003 ARW $26,250.00 $8,750.00 $0.00 $0.00 $35,000.00 Airport Terminal Building Maintenance - including restroom renovations and skylight repairs.
13-002 CKI $21,833.00 $7,278.00 $0.00 $0.00 $29,111.00 Airport Terminal Building Maintenance - including roof repairs and painting.
13-001 CUB $19,038.00 $19,039.00 $342,690.00 $0.00 $380,767.00 Taxiway 'A' extension, design, and permitting (Phase I). The primary need for the proposed project is to improve airfield safety by eliminating back taxiing on Runway 13-31.
12-027 99N $12,420.00 $12,420.00 $223,560.00 $0.00 $248,400.00 Design/Construction of security fencing and gates.
12-026 GGE $6,561.00 $6,561.00 $118,098.00 $0.00 $131,220.00 Rehabilitate TWY A, including taxiway connectors.
12-025 EOE $4,301.00 $4,301.00 $77,420.00 $0.00 $86,022.00 Apron rehabilitation and expansion (design only).
12-023 GRD $1,596.00 $1,595.50 $60,626.00 $0.00 $63,817.50 Runway 9 Approach Survey and Clearing (FY2011)
12-022 BBP $4,841.00 $13,036.00 $160,893.00 $0.00 $178,770.00 NAVAID Rehabilitation (PAPI, REIL, and Regulator) Land Acquisition Approach Clearing (Design and Bidding Only)
12-021 FDW $6,775.00 $6,775.00 $121,950.00 $0.00 $135,500.00 Engineering Design Services to improve runway safety area
12-020 HVS $10,984.00 $10,983.50 $197,703.00 $0.00 $219,670.50 Runway Safety Area Development (Design) and Approach Obstruction Clearing - RWY 3 and RWY 21 (Design)
12-019 MNI $29,420.00 $29,420.00 $529,560.00 $0.00 $588,400.00 The project consists of surveying obstructions located on properties adjacent to the south end runway, conducting FAA appraisals of the properties that have obstructions that will have to be removed, obtaining navigational easements on those properties and removing the identified obstructions in order to bring the runway up to an LPV of 34:1 per FAA recommendation. Additional navigational easements will be obtained on properties adjacent to the north end runway to allow for additional obstructions to be removed.
12-018 MNI $9,250.00 $9,250.00 $166,500.00 $0.00 $185,000.00 The project consists of surveying obstructions located on properties adjacent to the north runway end, obtaining navigational easements on those properties and removing the identified obstructions in order to accomplish an LPV instrument approach meeting FAA 34:1 criteria.
12-017 HXD $16,061.00 $16,061.00 $289,098.00 $0.00 $321,220.00 Lighted Sign Replacement Runway 21 Tree Removal
12-016 GRD $6,976.00 $6,977.00 $125,578.00 $0.00 $139,531.00 Runway 9 Tree Obstruction Removal Project - Phase 1
12-015 LKR $7,594.00 $7,594.00 $136,698.00 $0.00 $151,886.00 Taxiway 'A' Pavement & Lighting Rehabilitation Project (Design Phase Only)
12-014 CQW $38,193.00 $38,193.15 $687,476.70 $0.00 $763,862.85 Construction, Lighting and Marking of the Final Segment of the Parallel Taxiway System to Runway 8/26
12-013 HXD $37,856.00 $37,857.39 $972,625.00 $0.00 $1,048,338.39 Environmental Assessment and Benefit Cost Analysis for Five-Year CIP, including a Traditional Cultural Properties Analysis requested by the State Historic Preservation Office, Phase III Data Recovery and Public Outreach Program resulting from discovering Mitchellville remnants at the end of Runway 21
12-012 OGB $10,433.00 $10,433.00 $111,458.00 $0.00 $132,324.00 Update the airport layout plan and develop an airport business plan.
12-011 MNI $14,550.00 $4,950.00 $0.00 $0.00 $19,500.00 Refurbish rotating beacon with new wiring and electrical motor. Clean lenses and replace glass as necessary. Repaint beacon tower and platform.