12-016 |
GRD |
$6,976.00 |
$6,977.00 |
$125,578.00 |
$0.00 |
$139,531.00 |
Runway 9 Tree Obstruction Removal Project - Phase 1 |
12-015 |
LKR |
$7,594.00 |
$7,594.00 |
$136,698.00 |
$0.00 |
$151,886.00 |
Taxiway 'A' Pavement & Lighting Rehabilitation Project (Design Phase Only) |
12-014 |
CQW |
$38,193.00 |
$38,193.15 |
$687,476.70 |
$0.00 |
$763,862.85 |
Construction, Lighting and Marking of the Final Segment of the Parallel Taxiway System to Runway 8/26 |
12-013 |
HXD |
$37,856.00 |
$37,857.39 |
$972,625.00 |
$0.00 |
$1,048,338.39 |
Environmental Assessment and Benefit Cost Analysis for Five-Year CIP, including a Traditional Cultural Properties Analysis requested by the State Historic Preservation Office, Phase III Data Recovery and Public Outreach Program resulting from discovering Mitchellville remnants at the end of Runway 21 |
12-012 |
OGB |
$10,433.00 |
$10,433.00 |
$111,458.00 |
$0.00 |
$132,324.00 |
Update the airport layout plan and develop an airport business plan. |
12-011 |
MNI |
$14,550.00 |
$4,950.00 |
$0.00 |
$0.00 |
$19,500.00 |
Refurbish rotating beacon with new wiring and electrical motor. Clean lenses and replace glass as necessary. Repaint beacon tower and platform. |
12-009 |
LUX |
$327,656.00 |
$263,999.00 |
$2,460,322.00 |
$0.00 |
$3,051,977.00 |
Rehabilitate RWY 8/26 and apron area with 5" concrete overlay. 152' paved overrun. |
12-008 |
UZA |
$98,579.00 |
$98,584.00 |
$1,807,433.00 |
$0.00 |
$2,004,596.00 |
Rehabilitate Runway 2/20 with a two inch asphalt surface course, over a double surface treatment, including engineering design and construction services |
12-007 |
OGB |
$2,120.00 |
$2,120.00 |
$0.00 |
$0.00 |
$4,240.00 |
Perform surveying services for creating approach surface drawings used in community/airport planning and land use development control. |
12-006 |
CKI |
$37,072.00 |
$37,072.00 |
$1,408,746.00 |
$0.00 |
$1,482,890.00 |
Extend existing partial parallel taxiway to a full parallel for runway 14-32. Remove tree obstructions to meet 34:1 approach criteria per FAA Part 77 regulation |
12-005 |
LUX |
$38,327.00 |
$26,959.00 |
$103,534.00 |
$0.00 |
$168,820.00 |
Engineering design services for rehabilitating runway 8/26, selected areas of parallel taxiway, and apron. |
12-004 |
LUX |
$28,969.00 |
$19,312.00 |
$0.00 |
$0.00 |
$48,281.00 |
Engineering services for a runway 26 paved overrun and corporate hangar site prep project. |
12-003 |
CDN |
$11,283.00 |
$11,283.00 |
$428,760.00 |
$0.00 |
$451,326.00 |
Professional service fees (admin, planning, engineering, legal, environmental, and appraisal services) for acquiring land and aviation easements within runway 6/24 safety area and approach corroders. |
12-002 |
DYB |
$128,579.90 |
$181,955.00 |
$4,886,779.00 |
$0.00 |
$5,197,313.90 |
Pave and light a 1300' runway extension to approach end of Runway 6 including connecting parallel taxiway. |
11-023 |
SMS |
$2,693.00 |
$5,202.00 |
$150,000.00 |
$0.00 |
$157,895.00 |
Facilitate land acquisition assistance and runway safety area cost overruns. |
11-022 |
CDN |
$14,081.00 |
$4,694.00 |
$0.00 |
$0.00 |
$18,775.00 |
Replace rotating beacon and paint beacon tower |
11-021 |
CEU |
$13,158.00 |
$13,158.00 |
$500,000.00 |
$0.00 |
$526,316.00 |
Supplemental erosion control associated with extended runway 25 and connecting parallel taxiway. |
11-020A |
SPA |
$6,396.00 |
$6,396.00 |
$243,048.00 |
$0.00 |
$255,840.00 |
Amendment to 11-020: Rehabilitate terminal apron with 33,000 SY of new concrete and 29,000 SY of new asphalt including associated connecting taxiways. |
11-020 |
SPA |
$86,400.00 |
$86,400.00 |
$3,283,200.00 |
$0.00 |
$3,456,000.00 |
Rehabilitate terminal apron with 33,000 SY of new concrete and 29,000 SY of new asphalt including associated connecting taxiways |
11-019 |
GRD |
$6,750.00 |
$2,250.00 |
$0.00 |
$0.00 |
$9,000.00 |
Replace RWY 27 PAPI |