Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
12-009 LUX $327,656.00 $263,999.00 $2,460,322.00 $0.00 $3,051,977.00 Rehabilitate RWY 8/26 and apron area with 5" concrete overlay. 152' paved overrun.
12-008 UZA $98,579.00 $98,584.00 $1,807,433.00 $0.00 $2,004,596.00 Rehabilitate Runway 2/20 with a two inch asphalt surface course, over a double surface treatment, including engineering design and construction services
12-007 OGB $2,120.00 $2,120.00 $0.00 $0.00 $4,240.00 Perform surveying services for creating approach surface drawings used in community/airport planning and land use development control.
12-006 CKI $37,072.00 $37,072.00 $1,408,746.00 $0.00 $1,482,890.00 Extend existing partial parallel taxiway to a full parallel for runway 14-32. Remove tree obstructions to meet 34:1 approach criteria per FAA Part 77 regulation
12-005 LUX $38,327.00 $26,959.00 $103,534.00 $0.00 $168,820.00 Engineering design services for rehabilitating runway 8/26, selected areas of parallel taxiway, and apron.
12-004 LUX $28,969.00 $19,312.00 $0.00 $0.00 $48,281.00 Engineering services for a runway 26 paved overrun and corporate hangar site prep project.
12-003 CDN $11,283.00 $11,283.00 $428,760.00 $0.00 $451,326.00 Professional service fees (admin, planning, engineering, legal, environmental, and appraisal services) for acquiring land and aviation easements within runway 6/24 safety area and approach corroders.
12-002 DYB $128,579.90 $181,955.00 $4,886,779.00 $0.00 $5,197,313.90 Pave and light a 1300' runway extension to approach end of Runway 6 including connecting parallel taxiway.
11-023 SMS $2,693.00 $5,202.00 $150,000.00 $0.00 $157,895.00 Facilitate land acquisition assistance and runway safety area cost overruns.
11-022 CDN $14,081.00 $4,694.00 $0.00 $0.00 $18,775.00 Replace rotating beacon and paint beacon tower
11-021 CEU $13,158.00 $13,158.00 $500,000.00 $0.00 $526,316.00 Supplemental erosion control associated with extended runway 25 and connecting parallel taxiway.
11-020A SPA $6,396.00 $6,396.00 $243,048.00 $0.00 $255,840.00 Amendment to 11-020: Rehabilitate terminal apron with 33,000 SY of new concrete and 29,000 SY of new asphalt including associated connecting taxiways.
11-020 SPA $86,400.00 $86,400.00 $3,283,200.00 $0.00 $3,456,000.00 Rehabilitate terminal apron with 33,000 SY of new concrete and 29,000 SY of new asphalt including associated connecting taxiways
11-019 GRD $6,750.00 $2,250.00 $0.00 $0.00 $9,000.00 Replace RWY 27 PAPI
11-018A SPA $802.00 $802.00 $19,260.00 $0.00 $20,864.00 Amendment to 11-018: Engineering design, bidding, and construction services; including construction of an auto parking lot for newly constructed terminal building and installation of a new waterline service line.
11-018 SPA $18,458.00 $18,458.00 $701,385.00 $0.00 $738,301.00 Engineering design, bidding, and construction services; including construction of an auto parking lot for newly constructed terminal building and installation of a new waterline service line.
11-017 CUB $8,959.00 $8,959.00 $340,447.00 $0.00 $358,365.00 Tree obstruction removal located in approaches to RWY 13/31 and along the transitional surface of the runway areas.
11-016 35A $4,103.00 $13,732.00 $338,864.00 $0.00 $356,699.00 Facilitate land and easement acquisition to approach end of runway 23.
11-015 HXD $45,372.00 $45,373.00 $1,724,155.00 $0.00 $1,814,900.00 Off airport property tree obstruction removal, tree mitigation, and easement acquisition to the approach end of runway 21. Amendment: Off airport property tree obstruction removal design services in the approach to Runway 3.
11-014 HXD $6,859.00 $6,859.00 $260,652.00 $0.00 $274,370.00 Develop a master plan for Hilton Head Airport