South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
11-018A SPA $802.00 $802.00 $19,260.00 $0.00 $20,864.00 Amendment to 11-018: Engineering design, bidding, and construction services; including construction of an auto parking lot for newly constructed terminal building and installation of a new waterline service line.
11-018 SPA $18,458.00 $18,458.00 $701,385.00 $0.00 $738,301.00 Engineering design, bidding, and construction services; including construction of an auto parking lot for newly constructed terminal building and installation of a new waterline service line.
11-017 CUB $8,959.00 $8,959.00 $340,447.00 $0.00 $358,365.00 Tree obstruction removal located in approaches to RWY 13/31 and along the transitional surface of the runway areas.
11-016 35A $4,103.00 $13,732.00 $338,864.00 $0.00 $356,699.00 Facilitate land and easement acquisition to approach end of runway 23.
11-015 HXD $45,372.00 $45,373.00 $1,724,155.00 $0.00 $1,814,900.00 Off airport property tree obstruction removal, tree mitigation, and easement acquisition to the approach end of runway 21. Amendment: Off airport property tree obstruction removal design services in the approach to Runway 3.
11-014 HXD $6,859.00 $6,859.00 $260,652.00 $0.00 $274,370.00 Develop a master plan for Hilton Head Airport
11-013 HVS $5,678.00 $9,011.00 $279,086.00 $0.00 $293,775.00 Professional service fees to facilitate land and easement acquisition to both approach and departure areas of runway 3 and runway 21.
11-012 LQK $4,010.00 $20,335.00 $136,025.00 $0.00 $160,370.00 Engineering, administration, and legal services for acquiring land along RWY 5/23 including planning services for updating the airport layout plan.
11-011 CQW $1,974.00 $1,974.00 $75,000.00 $0.00 $78,948.00 Engineering design services for completing a full parallel taxiway to RWY 8/26
11-010A GGE $5,118.00 $5,118.00 $92,129.00 $0.00 $102,365.00 Amendment to 11-010 FAA awarded an additional amount of money for the cost of materials for installation of an emergency backup generator for GGE.
11-010 GGE $48,679.00 $41,803.00 $1,065,859.00 $0.00 $1,156,341.00 Install new LED runway and taxiway edge lights including omni-directional approach lighting equipment on approach end of runway 5.
11-008 CDN $12,750.00 $12,750.00 $484,500.00 $0.00 $510,000.00 Engineering and construction services for relocating and rehabilitating TWY "F"
11-007 JZI $133,508.48 $44,502.82 $502,651.00 $0.00 $680,662.30 Airfield maintenance project - Replace selective excessive cracked concrete slabs on runway 4/22 and associated connecting taxiways, joint seal existing concrete pavement and apply runway and taxiway markings.
11-006 FDW $71,135.00 $71,135.00 $2,703,130.00 $0.00 $2,845,400.00 Rehabilitate the asphalt pavements of Runway 4/22, the parallel taxiway, and apron with a three inch bituminous asphalt overlay including reimbursement for tree obstruction removal on both runway ends.
11-005 BBP $8,081.00 $2,694.00 $0.00 $0.00 $10,775.00 Install new rotating beacon
11-004 CEU $61,798.00 $41,197.00 $0.00 $0.00 $102,995.00 Construct t-hangar apron area and taxilanes.
11-003 CDN $45,360.00 $30,240.00 $0.00 $0.00 $75,600.00 Preliminary and final engineering design services including bidding assistance services for Taxiway "F"
11-002 HXD $32,718.00 $32,718.00 $1,243,296.00 $0.00 $1,308,732.00 RWY 21 Approach: a) airport tree obstruction removal and on airport tree mitigation; b) design service for RWY 3/21 lighted sign relocation; c) legal fees for easement acquisition for off-airport tree obstruction removal; and d) develop a disadvantage business enterprise plan
11-001 GGE $8,868.00 $11,936.00 $395,275.00 $0.00 $416,079.00 Runway 23 safety area grading and continuance of environmental mitigation monitoring.
10-023 FDW $12,217.00 $12,217.00 $464,260.00 $0.00 $488,694.00 Land easement acquisition and obstruction clearing