10-003 |
CUB |
$4,354.00 |
$4,354.00 |
$165,444.00 |
$0.00 |
$174,152.00 |
Environmental assessment for taxiway "A" extension and engineering design services for rehabilitating taxiway "A" and west apron area. |
10-002 |
ARW |
$26,644.00 |
$26,644.00 |
$1,012,466.00 |
$0.00 |
$1,065,754.00 |
Asphalt overlay of Runway 7/25 and connecting stud taxiways; airfield electrical improvements; and Runway 7 Phase II tree obstruction removal. |
10-001A |
HXD |
$4,095.00 |
$4,095.00 |
$155,623.00 |
$0.00 |
$163,813.00 |
Construction services for runway safety area drainage improvements; construction of aircraft rescue and fire fighting station; clearing of Runway 3 trees to meet the 34:1 approach slope; tree mitigation design services, avigation easements, and administrative legal fees.
Tasks not previously anticipated:
Detailed Tree Survey - locating trees according to Town of HHI.
Wetland Approximation Survey. |
10-001 |
HXD |
$65,125.00 |
$65,125.00 |
$2,474,766.00 |
$0.00 |
$2,605,016.00 |
Construction services for runway safety area drainage improvements; construction of aircraft rescue and fire fighting station; clearing of Runway 3 trees (design) to meet the 34:1 approach slope; tree mitigation design services, avigation easements, and administrative legal fees |
09-033 |
35A |
$9,750.00 |
$3,250.00 |
$0.00 |
$0.00 |
$13,000.00 |
Replace rotating beacon |
09-032 |
GYH |
$16,355.00 |
$10,904.00 |
$0.00 |
$0.00 |
$27,259.00 |
Purchase ARFF radio equipment, CFR protective clothing, rescue saws, etc. |
09-031 |
HVS |
$12,154.00 |
$12,154.00 |
$461,860.00 |
$0.00 |
$486,168.00 |
Engineering design for runway 21 approach clearing. Terminal building site preparation (hangar removal, apron expansion, and shade hangar; including engineering and construction |
09-030 |
MYR |
$136,008.00 |
$90,672.00 |
$0.00 |
$0.00 |
$226,680.00 |
Rehabilitate taxiway "E" taxilane service area to general aviation hangars |
09-029 |
CEU |
$68,811.00 |
$68,811.00 |
$2,614,822.00 |
$0.00 |
$2,752,444.00 |
Extend Runway 23 an additional 600' including the parallel taxiway |
09-028 |
FDW |
$16,232.00 |
$16,233.00 |
$616,830.00 |
$0.00 |
$649,295.00 |
Runway 4/22 pavement rehabilitation evaluation and engineering design services, obstruction clearing coordination, and airfield perimeter fencing design and installation. |
09-027 |
BBP |
$11,787.00 |
$11,787.00 |
$447,901.00 |
$0.00 |
$471,475.00 |
Construct hangar taxiway and expand hangar apron area. |
09-026 |
GGE |
$22,458.00 |
$22,458.00 |
$853,397.00 |
$0.00 |
$898,313.00 |
Phase II - Construction of access terminal road and apron expansion to include perimeter fencing. |
09-025 |
MKS |
$4,294.00 |
$4,294.00 |
$163,163.00 |
$0.00 |
$171,751.00 |
Stormwater drainage analysis and drainage design, including runway 5/23 pavement evaluation and rehab design |
09-024 |
CKI |
$4,562.00 |
$4,563.00 |
$173,375.00 |
$0.00 |
$182,500.00 |
Engineering design services for parallel taxiway to runway 14/32. |
09-023 |
6J0 |
$11,250.00 |
$3,750.00 |
$0.00 |
$0.00 |
$15,000.00 |
Install new rotating beacon |
09-022 |
6J0 |
$11,158.00 |
$11,159.00 |
$424,020.00 |
$0.00 |
$446,337.00 |
Rehabilitate apron - South area |
09-021 |
6J4 |
$7,525.00 |
$7,525.00 |
$285,950.00 |
$0.00 |
$301,000.00 |
Construct new taxilanes and hangar apron |
09-020 |
CQW |
$4,391.00 |
$4,391.00 |
$166,859.00 |
$0.00 |
$175,641.00 |
Installation of medium intensity runway lights on Runway 8/26. |
09-019 |
CEU |
$2,582.00 |
$2,582.00 |
$98,130.00 |
$0.00 |
$103,294.00 |
Professional Services - Engineering, Construction Administration, Resident Project Representative, and Quality Control Testing. |
09-018 |
LKR |
$82,501.00 |
$82,501.00 |
$3,135,028.00 |
$0.00 |
$3,300,030.00 |
Runway 6/24 rehabilitation |