Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
09-016 AND $155,220.00 $103,480.00 $0.00 $0.00 $258,700.00 Construct t-hangar and shade port taxiways.
09-015 GMU $29,141.00 $29,141.00 $1,107,363.00 $0.00 $1,165,645.00 Rehabilitate south aircraft parking apron (design and construction)
09-014 GMU $21,562.00 $7,188.00 $0.00 $0.00 $28,750.00 Clearing trees penetrating the airspace surrounding the airport.
09-013 CUB $5,624.00 $5,624.00 $213,711.00 $0.00 $224,959.00 Master plan update
09-012 DCM $11,803.00 $11,803.00 $448,519.00 $0.00 $472,125.00 Expand terminal apron
09-011 GSP $170,171.00 $170,171.00 $1,233,494.00 $0.00 $1,573,836.00 Construct a new 4,480 sf general aviation terminal building
09-010 GYH $28,513.00 $28,513.00 $0.00 $0.00 $57,026.00 Develop an airport business plan; consisting of minimum standards, rules and regulations, developmental guidelines, lease guidelines, tenant rates, and charges, and airfield operation procedural guidelines
09-009 GYH $43,750.00 $43,750.00 $0.00 $0.00 $87,500.00 Airport planning services consisting of updating the airport layout plan and developing Phase I of an airport geographic information system program.
09-008 CDN $2,927.00 $2,927.00 $111,241.00 $0.00 $117,095.00 Environmental assessment, surveying, and land appraisals for Runway 6/24 safety improvements.
09-007 SMS $2,927.00 $2,927.00 $111,241.00 $0.00 $117,095.00 Environmental assessment for improving Runway 5/23 safety areas.
09-006 EOE $4,607.00 $4,607.00 $175,000.00 $0.00 $184,214.00 Obstruction removal (trees) and landscaping enhancements on Newberry Country Club property to meet minimum 20:1 FAA TERPS criteria to Runway 4..
09-005 RBW $3,255.00 $3,255.00 $123,694.00 $0.00 $130,204.00 Installation of airport security fencing
09-004 ARW $14,059.00 $14,059.00 $534,252.00 $0.00 $562,370.00 1) Design services: Runway and taxiway overlay, runway end identifier lights, rotating beacon and windsock replacement; 2) Construction services: Tree obstruction removal
09-003 HXD $21,629.00 $21,629.00 $821,912.00 $0.00 $865,170.00 Design services: (1) Replace air carrier apron joint material, (2) Air carrier terminal building improvements, (3) Runway safety area drainage improvements-Administrative Services: Develop a disadvantaged business enterprise program-Construction Services: Tree obstruction removal to approach end of RWY 3.
09-002 HXD $12,898.00 $12,898.00 $490,128.00 $0.00 $515,924.00 Planning services: (1) Environmental Assessment for RWY 21 tree obstruction removal, (2) Update airport layout plan; Design Services: (1) Upgrade aircraft rescue and firefighting station (2) Tree obstruction removal to approach end of RWY 3.
09-001 EOE $47,625.00 $15,875.00 $0.00 $0.00 $63,500.00 Obstruction removal (tree clearing) on private property to achieve a minimum 20:1 approach slope on the approach end of RWY 4.
08-027 35A $621.00 $9,363.00 $190,271.00 $0.00 $200,255.00 Land acquisition assistance services.
08-026 ARW $7,764.00 $7,764.00 $295,022.00 $0.00 $310,550.00 Update airport master plan and design services for obstruction removal
08-025 CKI $27,284.00 $27,284.00 $1,036,782.00 $0.00 $1,091,350.00 Runway 32 safety area improvements-project consists of constructing a concrete box culvert in an existing water drainage canal.
08-024 FLO $8,778.00 $8,778.00 $333,579.00 $0.00 $351,135.00 Construction of a storm water drainage system located inside and near the commercial terminal building.