09-016 |
AND |
$155,220.00 |
$103,480.00 |
$0.00 |
$0.00 |
$258,700.00 |
Construct t-hangar and shade port taxiways. |
09-015 |
GMU |
$29,141.00 |
$29,141.00 |
$1,107,363.00 |
$0.00 |
$1,165,645.00 |
Rehabilitate south aircraft parking apron (design and construction) |
09-014 |
GMU |
$21,562.00 |
$7,188.00 |
$0.00 |
$0.00 |
$28,750.00 |
Clearing trees penetrating the airspace surrounding the airport. |
09-013 |
CUB |
$5,624.00 |
$5,624.00 |
$213,711.00 |
$0.00 |
$224,959.00 |
Master plan update |
09-012 |
DCM |
$11,803.00 |
$11,803.00 |
$448,519.00 |
$0.00 |
$472,125.00 |
Expand terminal apron |
09-011 |
GSP |
$170,171.00 |
$170,171.00 |
$1,233,494.00 |
$0.00 |
$1,573,836.00 |
Construct a new 4,480 sf general aviation terminal building |
09-010 |
GYH |
$28,513.00 |
$28,513.00 |
$0.00 |
$0.00 |
$57,026.00 |
Develop an airport business plan; consisting of minimum standards, rules and regulations, developmental guidelines, lease guidelines, tenant rates, and charges, and airfield operation procedural guidelines |
09-009 |
GYH |
$43,750.00 |
$43,750.00 |
$0.00 |
$0.00 |
$87,500.00 |
Airport planning services consisting of updating the airport layout plan and developing Phase I of an airport geographic information system program. |
09-008 |
CDN |
$2,927.00 |
$2,927.00 |
$111,241.00 |
$0.00 |
$117,095.00 |
Environmental assessment, surveying, and land appraisals for Runway 6/24 safety improvements. |
09-007 |
SMS |
$2,927.00 |
$2,927.00 |
$111,241.00 |
$0.00 |
$117,095.00 |
Environmental assessment for improving Runway 5/23 safety areas. |
09-006 |
EOE |
$4,607.00 |
$4,607.00 |
$175,000.00 |
$0.00 |
$184,214.00 |
Obstruction removal (trees) and landscaping enhancements on Newberry Country Club property to meet minimum 20:1 FAA TERPS criteria to Runway 4.. |
09-005 |
RBW |
$3,255.00 |
$3,255.00 |
$123,694.00 |
$0.00 |
$130,204.00 |
Installation of airport security fencing |
09-004 |
ARW |
$14,059.00 |
$14,059.00 |
$534,252.00 |
$0.00 |
$562,370.00 |
1) Design services: Runway and taxiway overlay, runway end identifier lights, rotating beacon and windsock replacement; 2) Construction services: Tree obstruction removal |
09-003 |
HXD |
$21,629.00 |
$21,629.00 |
$821,912.00 |
$0.00 |
$865,170.00 |
Design services: (1) Replace air carrier apron joint material, (2) Air carrier terminal building improvements, (3) Runway safety area drainage improvements-Administrative Services: Develop a disadvantaged business enterprise program-Construction Services: Tree obstruction removal to approach end of RWY 3. |
09-002 |
HXD |
$12,898.00 |
$12,898.00 |
$490,128.00 |
$0.00 |
$515,924.00 |
Planning services: (1) Environmental Assessment for RWY 21 tree obstruction removal, (2) Update airport layout plan; Design Services: (1) Upgrade aircraft rescue and firefighting station (2) Tree obstruction removal to approach end of RWY 3. |
09-001 |
EOE |
$47,625.00 |
$15,875.00 |
$0.00 |
$0.00 |
$63,500.00 |
Obstruction removal (tree clearing) on private property to achieve a minimum 20:1 approach slope on the approach end of RWY 4. |
08-027 |
35A |
$621.00 |
$9,363.00 |
$190,271.00 |
$0.00 |
$200,255.00 |
Land acquisition assistance services. |
08-026 |
ARW |
$7,764.00 |
$7,764.00 |
$295,022.00 |
$0.00 |
$310,550.00 |
Update airport master plan and design services for obstruction removal |
08-025 |
CKI |
$27,284.00 |
$27,284.00 |
$1,036,782.00 |
$0.00 |
$1,091,350.00 |
Runway 32 safety area improvements-project consists of constructing a concrete box culvert in an existing water drainage canal. |
08-024 |
FLO |
$8,778.00 |
$8,778.00 |
$333,579.00 |
$0.00 |
$351,135.00 |
Construction of a storm water drainage system located inside and near the commercial terminal building. |