10-022 6J0 $13,535.00 $13,535.00 $507,201.00 $0.00 $534,271.00 Realign a portion of parallel taxiway "A"
10-021 FLO $90,266.00 $90,266.00 $3,430,097.00 $0.00 $3,610,629.00 Reconstruct and expand commercial service terminal apron
10-020AA SMS $59,770.00 $39,847.00 $0.00 $0.00 $99,617.00 Contract arbitrator determination awarded payment of an additional 70,000 CY dirt embankment for runway safety area improvement including half of the arbitrator administration fee.
10-020A SMS $5,237.00 $5,237.00 $199,006.00 $0.00 $209,480.00 Grant Amendment - Change Order for DHEC stormwater sediment basin, stream mitigation.
10-020 SMS $34,915.00 $34,916.00 $1,326,797.00 $0.00 $1,396,628.00 Construction of runway 5/23 safety area enhancement including wetland & stream mitigation and monitoring.
10-019 PYG $2,475.00 $825.00 $0.00 $0.00 $3,300.00 Replace rotating beacon motor
10-018 AIK $2,229.00 $2,229.00 $84,682.00 $0.00 $89,140.00 Engineering design services for rehabilitating the airfield lighting system
10-017 LQK $38,795.00 $26,115.00 $0.00 $0.00 $64,910.00 Engineering design services for widening & relocating a corporate hangar taxiway. Design services include project formulation, surveying, and geotechnical investigation and administration services of "Bridges Property" in the runway 5 runway protection area.
10-016 CUB $4,655.00 $4,655.00 $176,899.00 $0.00 $186,209.00 Engineering design for obstruction removal, easement negotiation services, a DBE plan, and reimbursement for security access gate controls.
10-015 SMS $3,502.00 $3,503.00 $133,095.00 $0.00 $140,100.00 Engineering design services for runway safety area improvements.
10-014 DYB $6,848.00 $6,848.00 $260,223.00 $0.00 $273,919.00 Environmental assessment and preliminary engineering for extending the approach end of Runway 6.
10-013 MKS $94,298.00 $94,298.00 $3,583,309.00 $0.00 $3,771,905.00 Rehabilitate RWY 5/23 with a 9" concrete overlay, new medium intensity runway lights incased in underground conduit, construct storm water drainage canals and associated drainage improvements
10-012 AND $110,591.00 $110,592.00 $4,202,502.00 $0.00 $4,423,685.00 Pavement Study on RWY 5/23 and associated taxiways, rehab and strengthen terminal apron and connecting terminal taxiways, rehabilitate airfield lighting (RWY 5/23 HIRLS, Parallel TWY A & Connecting TWY's, New Lighting Vault, Regulators, and PAPI's on RWY 23)
10-011 LQK $10,850.00 $10,850.00 $412,300.00 $0.00 $434,000.00 Construct and widen a corporate hangar taxiway
10-010 MKS $3,255.00 $3,255.00 $123,694.00 $0.00 $130,204.00 Preliminary engineering design for stormwater drainage analysis and stormwater improvements including runway pavement evaluation and design.
10-008 GMU $11,645.00 $11,645.00 $442,510.00 $0.00 $465,800.00 Retrofit EMAS on the approach end of RWY 19.
10-007 UZA $21,343.00 $21,343.00 $811,047.00 $0.00 $853,733.00 Rehabilitate airfield electrical system including the (MALSR's) - medium intensity approach light system with runway alignment indicator lights.
10-006 52J $6,089.00 $6,089.00 $231,382.00 $0.00 $243,560.00 Installation of medium intensity runway lights, two box precision path indictor lights (PAPI's) on Runway 6/24, rotating beacon, wind cone, and segmented circle
10-005 52J $2,301.00 $2,302.00 $87,453.00 $0.00 $92,056.00 Engineering and administrative design services for a medium intensity runway lighting system, precision approach path indicator lighting system on both runway approach ends, rotating beacon, wind cone, and segmented circle.
10-004 OGB $23,977.00 $35,377.00 $911,126.00 $0.00 $970,480.00 Phase II Apron Expansion