10-022 |
6J0 |
$13,535.00 |
$13,535.00 |
$507,201.00 |
$0.00 |
$534,271.00 |
Realign a portion of parallel taxiway "A" |
10-021 |
FLO |
$90,266.00 |
$90,266.00 |
$3,430,097.00 |
$0.00 |
$3,610,629.00 |
Reconstruct and expand commercial service terminal apron |
10-020AA |
SMS |
$59,770.00 |
$39,847.00 |
$0.00 |
$0.00 |
$99,617.00 |
Contract arbitrator determination awarded payment of an additional 70,000 CY dirt embankment for runway safety area improvement including half of the arbitrator administration fee. |
10-020A |
SMS |
$5,237.00 |
$5,237.00 |
$199,006.00 |
$0.00 |
$209,480.00 |
Grant Amendment - Change Order for DHEC stormwater sediment basin, stream mitigation. |
10-020 |
SMS |
$34,915.00 |
$34,916.00 |
$1,326,797.00 |
$0.00 |
$1,396,628.00 |
Construction of runway 5/23 safety area enhancement including wetland & stream mitigation and monitoring. |
10-019 |
PYG |
$2,475.00 |
$825.00 |
$0.00 |
$0.00 |
$3,300.00 |
Replace rotating beacon motor |
10-018 |
AIK |
$2,229.00 |
$2,229.00 |
$84,682.00 |
$0.00 |
$89,140.00 |
Engineering design services for rehabilitating the airfield lighting system |
10-017 |
LQK |
$38,795.00 |
$26,115.00 |
$0.00 |
$0.00 |
$64,910.00 |
Engineering design services for widening & relocating a corporate hangar taxiway. Design services include project formulation, surveying, and geotechnical investigation and administration services of "Bridges Property" in the runway 5 runway protection area. |
10-016 |
CUB |
$4,655.00 |
$4,655.00 |
$176,899.00 |
$0.00 |
$186,209.00 |
Engineering design for obstruction removal, easement negotiation services, a DBE plan, and reimbursement for security access gate controls. |
10-015 |
SMS |
$3,502.00 |
$3,503.00 |
$133,095.00 |
$0.00 |
$140,100.00 |
Engineering design services for runway safety area improvements. |
10-014 |
DYB |
$6,848.00 |
$6,848.00 |
$260,223.00 |
$0.00 |
$273,919.00 |
Environmental assessment and preliminary engineering for extending the approach end of Runway 6. |
10-013 |
MKS |
$94,298.00 |
$94,298.00 |
$3,583,309.00 |
$0.00 |
$3,771,905.00 |
Rehabilitate RWY 5/23 with a 9" concrete overlay, new medium intensity runway lights incased in underground conduit, construct storm water drainage canals and associated drainage improvements |
10-012 |
AND |
$110,591.00 |
$110,592.00 |
$4,202,502.00 |
$0.00 |
$4,423,685.00 |
Pavement Study on RWY 5/23 and associated taxiways, rehab and strengthen terminal apron and connecting terminal taxiways, rehabilitate airfield lighting (RWY 5/23 HIRLS, Parallel TWY A & Connecting TWY's, New Lighting Vault, Regulators, and PAPI's on RWY 23) |
10-011 |
LQK |
$10,850.00 |
$10,850.00 |
$412,300.00 |
$0.00 |
$434,000.00 |
Construct and widen a corporate hangar taxiway |
10-010 |
MKS |
$3,255.00 |
$3,255.00 |
$123,694.00 |
$0.00 |
$130,204.00 |
Preliminary engineering design for stormwater drainage analysis and stormwater improvements including runway pavement evaluation and design. |
10-008 |
GMU |
$11,645.00 |
$11,645.00 |
$442,510.00 |
$0.00 |
$465,800.00 |
Retrofit EMAS on the approach end of RWY 19. |
10-007 |
UZA |
$21,343.00 |
$21,343.00 |
$811,047.00 |
$0.00 |
$853,733.00 |
Rehabilitate airfield electrical system including the (MALSR's) - medium intensity approach light system with runway alignment indicator lights. |
10-006 |
52J |
$6,089.00 |
$6,089.00 |
$231,382.00 |
$0.00 |
$243,560.00 |
Installation of medium intensity runway lights, two box precision path indictor lights (PAPI's) on Runway 6/24, rotating beacon, wind cone, and segmented circle |
10-005 |
52J |
$2,301.00 |
$2,302.00 |
$87,453.00 |
$0.00 |
$92,056.00 |
Engineering and administrative design services for a medium intensity runway lighting system, precision approach path indicator lighting system on both runway approach ends, rotating beacon, wind cone, and segmented circle. |
10-004 |
OGB |
$23,977.00 |
$35,377.00 |
$911,126.00 |
$0.00 |
$970,480.00 |
Phase II Apron Expansion |