13-027 6J0 $37,230.00 $511,768.00 $453,184.00 $0.00 $1,002,182.00 ALP Update (including Business Plan) and T-hangar, Taxilane & Fencing Project
13-026 PYG $8,016.00 $12,140.00 $181,398.00 $0.00 $201,554.00 Construction of Stub Taxiway
13-025 GRD $8,375.00 $8,375.00 $150,752.00 $0.00 $167,502.00 Design, pre-design investigation services and Permitting services for the pavement and lighting rehabilitation for Runway 9-27 at Greenwood County Airport.
13-024 AIK $9,557.00 $9,557.00 $172,021.00 $0.00 $191,135.00 Security Fencing Project The purpose of this project is to finish the remaining part of the airport perimeter fence project that was built in 2008. This project includes the installation of approximately 2,445' of new 8' chain link fence with 3-strand barbed wire and dual-leaf swing gates including wildlife deterrent treatment.
13-023 BNL $7,086.00 $7,087.00 $127,555.00 $0.00 $141,728.00 ALP Update
13-022 LQK $3,250.00 $23,800.00 $243,450.00 $0.00 $270,500.00 Land Acquisition within Approach to Runway 5 (Facilitation) of approximately 17 acres.
13-021 UZA $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 Apron & Taxiway Rehabilitation (Design) Design and subsequent construction will renew the look and condition, and will strengthen both surfaces which were recently given low PCN strength ratings.
13-020 CUB $4,673.00 $4,673.00 $84,114.00 $0.00 $93,460.00 Taxiway Extension Design (Phase II); Land Acquisition Administrative Costs (6 acres) This project eliminates a back taxiing requirement on RWY 31 approach, and assists with the administrative costs of acquiring approximately 6 acres of undeveloped property which will prevent non-compatible uses adjacent to the airport.
13-019 AND $28,821.00 $29,021.00 $520,574.00 $0.00 $578,416.00 Runway 23 Avigation Easements (Phase 1) This phase includes all associated Title work, Surveys/Plats, Appraisals, Review Appraisals, Legal Fees, and Acquisition Costs of Easements on 34 parcels.
13-018 GMU $46,514.00 $46,515.00 $837,261.00 $0.00 $930,290.00 Refurbishing of the airfield signage system and installation of taxiway lights on taxiways "C" and "D".
13-017 PHH $10,372.00 $10,372.00 $186,698.00 $0.00 $207,442.00 Construction of Hangar Taxiway Provides direct access to the runway, and will be 25' wide and include the apron areas in front of the hangars.
13-016 CRE $130,866.00 $130,866.00 $2,355,579.00 $0.00 $2,617,311.00 Ramp Rehabilitation - Schedule I - Construction and Construction Administration
13-013 UDG $2,579.00 $2,579.00 $46,424.00 $0.00 $51,582.00 Apron and Taxilanes Rehabilitation Project - Phase 2 (Re-Design & Bidding - Repackaged).
13-012 SPA $10,408.00 $17,742.00 $180,000.00 $0.00 $208,150.00 Runway/RSA Extension Environmental Assessment Study
13-009 LKR $8,183.00 $8,183.00 $310,956.00 $0.00 $327,322.00 2011 Taxilane Rehabilitation Project.
13-008 3J1 $43,620.45 $29,080.30 $0.00 $0.00 $72,700.75 Property Option Acquisitions Scope includes: 1. Conduct a title search for all properties proposed for fee simple acquisition only, and fee simple acquisition and avigation easement combined (total of 8). 2. Prepare appraisals for all 28 properties. 3. Prepare review appraisals for the 8 properties addressed in 1 above. 4. Prepare options for and negotiate with the 8 property owners addressed in 1 above.
13-007 HVS $10,129.00 $3,376.00 $0.00 $0.00 $13,505.00 Rotating beacon replacement, and painting of beacon tower.
13-006 GGE $7,230.51 $7,230.53 $130,149.36 $0.00 $144,610.40 1. Hangar Taxilane Extension 2. Land Acquisition - Doar Property 3. DBE Plan Update (FY'12-FY'14) and Small Business Participation Plan
13-005 PHH $2,854.75 $2,854.75 $51,385.50 $0.00 $57,095.00 Construct Taxiway to Hangar Area - Design and Bid Only
13-004A 3J1 $7,528.00 $5,018.00 $0.00 $0.00 $12,546.00 Public hearing necessary for the satisfaction of NEPA requirements. This is part of the Environmental Assessment