07-019 6J4 $1,520.00 $1,520.00 $57,776.00 $0.00 $60,816.00 Install a two-box precision approach path indicator light system (PAPI's) on end of runway 1.
07-018 HVS $1,626.00 $1,626.00 $7,588.00 $0.00 $10,840.00 General aviation terminal building study including development of conceptual drawings and a floor plan layout.
07-016 OGB $75,292.00 $219,291.00 $936,184.00 $0.00 $1,230,767.00 Construction and expansion of the terminal apron and t-hangar taxiway; including engineering design fees and for installing a supplemental wind cone.
07-015A CUB $1,857.19 $0.00 $0.00 $0.00 $1,857.19 Grant Amendment - For project cost overruns related to the runway, TWY B, and apron rehabilitation project
07-015 CUB $51,050.00 $51,050.00 $1,939,882.00 $0.00 $2,041,982.00 Rehabilitate runway 13/31, taxiway "B" and a portion of the apron.
07-014 MKS $11,737.00 $11,737.00 $446,000.00 $0.00 $469,474.00 Construct partial parallel taxiway enabling a full parallel taxiway to serve runway 5/23.
07-013 CDN $22,600.00 $22,600.00 $858,800.00 $0.00 $904,000.00 Construct partial taxiway to complete a full parallel taxiway system for RWY 6/24.
07-012 SMS $20,400.00 $20,400.00 $775,200.00 $0.00 $816,000.00 Relocate a partial parallel taxiway to meet FAA design standards.
07-010 MYR $1,000,000.00 $1,000,000.00 $0.00 $2,000,000.00 $4,000,000.00 Construct a new general aviation terminal building
07-009 LRO $500,000.00 $500,000.00 $0.00 $0.00 $1,000,000.00 Construct new terminal building
07-008 MNI $100,166.00 $66,777.00 $0.00 $0.00 $166,943.00 Construct t-hangar taxiways
07-007 RBW $75,122.00 $75,122.00 $2,854,630.00 $0.00 $3,004,874.00 Construct a parallel taxiway to Runway 5/23 including medium intensity LED edge lights.
07-006 BNL $40,149.00 $40,149.00 $1,525,675.00 $0.00 $1,605,973.00 Taxiway and apron rehabilitation and lighting project
07-005 SPA $25,770.00 $25,770.00 $0.00 $0.00 $51,540.00 New terminal building concept plan
07-004 SPA $5,640.00 $5,640.00 $214,301.00 $0.00 $225,581.00 Design services for a new terminal apron.
07-003 FLO $192,600.00 $192,600.00 $0.00 $0.00 $385,200.00 Refurbish existing aircraft storage hangar.
07-002 HXD $7,191.00 $7,192.00 $129,447.00 $0.00 $143,830.00 Grooving of Runway 3/21
07-001 EOE $44,677.00 $44,677.00 $1,697,713.00 $0.00 $1,787,067.00 Site preparation (clearing, grading, drainage, erosion control) for a new runway.
06-037 HXD $7,115.00 $7,115.00 $270,380.00 $0.00 $284,610.00 Conduct a FAA FAR Part 150 noise study.
06-035 LKR $20,544.00 $20,544.00 $780,675.00 $0.00 $821,763.00 Rehabilitate the apron and stub the taxiway