07-019 |
6J4 |
$1,520.00 |
$1,520.00 |
$57,776.00 |
$0.00 |
$60,816.00 |
Install a two-box precision approach path indicator light system (PAPI's) on end of runway 1. |
07-018 |
HVS |
$1,626.00 |
$1,626.00 |
$7,588.00 |
$0.00 |
$10,840.00 |
General aviation terminal building study including development of conceptual drawings and a floor plan layout. |
07-016 |
OGB |
$75,292.00 |
$219,291.00 |
$936,184.00 |
$0.00 |
$1,230,767.00 |
Construction and expansion of the terminal apron and t-hangar taxiway; including engineering design fees and for installing a supplemental wind cone. |
07-015A |
CUB |
$1,857.19 |
$0.00 |
$0.00 |
$0.00 |
$1,857.19 |
Grant Amendment - For project cost overruns related to the runway, TWY B, and apron rehabilitation project |
07-015 |
CUB |
$51,050.00 |
$51,050.00 |
$1,939,882.00 |
$0.00 |
$2,041,982.00 |
Rehabilitate runway 13/31, taxiway "B" and a portion of the apron. |
07-014 |
MKS |
$11,737.00 |
$11,737.00 |
$446,000.00 |
$0.00 |
$469,474.00 |
Construct partial parallel taxiway enabling a full parallel taxiway to serve runway 5/23. |
07-013 |
CDN |
$22,600.00 |
$22,600.00 |
$858,800.00 |
$0.00 |
$904,000.00 |
Construct partial taxiway to complete a full parallel taxiway system for RWY 6/24. |
07-012 |
SMS |
$20,400.00 |
$20,400.00 |
$775,200.00 |
$0.00 |
$816,000.00 |
Relocate a partial parallel taxiway to meet FAA design standards. |
07-010 |
MYR |
$1,000,000.00 |
$1,000,000.00 |
$0.00 |
$2,000,000.00 |
$4,000,000.00 |
Construct a new general aviation terminal building |
07-009 |
LRO |
$500,000.00 |
$500,000.00 |
$0.00 |
$0.00 |
$1,000,000.00 |
Construct new terminal building |
07-008 |
MNI |
$100,166.00 |
$66,777.00 |
$0.00 |
$0.00 |
$166,943.00 |
Construct t-hangar taxiways |
07-007 |
RBW |
$75,122.00 |
$75,122.00 |
$2,854,630.00 |
$0.00 |
$3,004,874.00 |
Construct a parallel taxiway to Runway 5/23 including medium intensity LED edge lights. |
07-006 |
BNL |
$40,149.00 |
$40,149.00 |
$1,525,675.00 |
$0.00 |
$1,605,973.00 |
Taxiway and apron rehabilitation and lighting project |
07-005 |
SPA |
$25,770.00 |
$25,770.00 |
$0.00 |
$0.00 |
$51,540.00 |
New terminal building concept plan |
07-004 |
SPA |
$5,640.00 |
$5,640.00 |
$214,301.00 |
$0.00 |
$225,581.00 |
Design services for a new terminal apron. |
07-003 |
FLO |
$192,600.00 |
$192,600.00 |
$0.00 |
$0.00 |
$385,200.00 |
Refurbish existing aircraft storage hangar. |
07-002 |
HXD |
$7,191.00 |
$7,192.00 |
$129,447.00 |
$0.00 |
$143,830.00 |
Grooving of Runway 3/21 |
07-001 |
EOE |
$44,677.00 |
$44,677.00 |
$1,697,713.00 |
$0.00 |
$1,787,067.00 |
Site preparation (clearing, grading, drainage, erosion control) for a new runway. |
06-037 |
HXD |
$7,115.00 |
$7,115.00 |
$270,380.00 |
$0.00 |
$284,610.00 |
Conduct a FAA FAR Part 150 noise study. |
06-035 |
LKR |
$20,544.00 |
$20,544.00 |
$780,675.00 |
$0.00 |
$821,763.00 |
Rehabilitate the apron and stub the taxiway |