06-019 |
GMU |
$21,072.00 |
$21,072.00 |
$800,738.00 |
$0.00 |
$842,882.00 |
Rehabilitate north apron |
06-018 |
UZA |
$7,755.00 |
$7,755.00 |
$294,709.00 |
$0.00 |
$310,219.00 |
Expand apron and conduct an airport drainage study |
06-017 |
UZA |
$11,460.00 |
$11,460.00 |
$435,498.00 |
$0.00 |
$458,418.00 |
Engineering design services for a 41,000 SY apron expansion, and runway extension feasibility study. |
06-016 |
ARW |
$2,968.00 |
$2,968.00 |
$0.00 |
$0.00 |
$5,936.00 |
Replacement of precision approach path indicator (PAPI) light on end of Runway 25. |
06-015 |
CKI |
$2,165.00 |
$2,165.00 |
$82,270.00 |
$0.00 |
$86,600.00 |
Engineering development and design services for a partial parallel taxiway including taxilanes for a future t-hangar complex. |
06-014 |
LUX |
$16,890.00 |
$16,890.00 |
$603,407.00 |
$0.00 |
$637,187.00 |
Paving and lighting of a partial parallel taxiway, installation of PAPI's, and REILS on the ends of Runways 8 and 26. |
06-013A |
AQX |
$125,000.00 |
$125,000.00 |
$150,000.00 |
$0.00 |
$400,000.00 |
Grant Amendment - terminal building construction. |
06-013 |
AQX |
$167,500.00 |
$167,500.00 |
$0.00 |
$0.00 |
$335,000.00 |
Construct a 2,500 square foot terminal building. |
06-012 |
CKI |
$23,508.00 |
$23,508.00 |
$893,314.00 |
$0.00 |
$940,330.00 |
Construct partial parallel taxiway and hangar taxilanes |
06-011 |
6J0 |
$12,251.00 |
$4,084.00 |
$0.00 |
$0.00 |
$16,335.00 |
Grassing and fertilizing the runway and taxiway safety areas to prevent soil erosion. |
06-010 |
SMS |
$6,150.00 |
$2,050.00 |
$0.00 |
$0.00 |
$8,200.00 |
Rehabilitate rotating beacon |
06-009 |
GGE |
$68,679.00 |
$45,786.00 |
$0.00 |
$0.00 |
$114,465.00 |
Engineering design and bidding services for extending Runway 5 by 500' including the associated parallel taxiway. Topographical survey, geotechnical subsurface investigation, development of a disadvantage business enterprise (DBE) plan, and runway safety area improvement design will be provided for this project. |
06-008 |
6J0 |
$3,499.00 |
$3,499.00 |
$132,946.00 |
$0.00 |
$139,944.00 |
Expand apron and construct vehicle access road |
06-007 |
BNL |
$300,000.00 |
$300,000.00 |
$0.00 |
$0.00 |
$600,000.00 |
Construct new terminal building |
06-005 |
HXD |
$129,073.00 |
$129,073.00 |
$4,904,765.00 |
$0.00 |
$5,162,911.00 |
Purchase an aircraft crash rescue fire fighting (ARFF) vehicle, including the expansion of the ARFF facility; acquire an emergency back-up generator for the airfield lighting system; widen and strengthen Runway 4/22; strengthen and expand the general aviation apron area (excluding pavement sealing); tree mitigation; and installation of security fencing |
06-004 |
GGE |
$42,031.00 |
$42,031.00 |
$1,597,166.00 |
$0.00 |
$1,681,228.00 |
Conduct environmental assessment for extending runway 5 by 500 feet, improve the terminal access road and auto parking area, relocate the airfield lighting vault, remove and relocate the rotating beacon, and expand the aircraft parking apron |
06-003 |
CDN |
$4,473.00 |
$4,473.00 |
$169,992.00 |
$0.00 |
$178,938.00 |
Engineering design services for a full parallel taxiway including rehabilitation of the existing partial parallel taxiway supporting runway 6/24. |
06-002 |
6J2 |
$19,850.00 |
$19,850.00 |
$754,282.00 |
$0.00 |
$793,982.00 |
Rehabilitate the asphalt pavement of runway 5/23, stub taxiway, and apron area. |
06-001 |
BBP |
$1,351.00 |
$1,351.00 |
$51,339.00 |
$0.00 |
$54,041.00 |
Update the airport layout plan and re-mark the runway and taxiway pavement markings |
05-031A |
RBW |
$135,379.00 |
$45,126.00 |
$0.00 |
$0.00 |
$180,505.00 |
Amend grant 05-031 to include corporate hangar taxiways |