06-034 |
DYB |
$21,819.00 |
$21,819.00 |
$829,132.00 |
$0.00 |
$872,770.00 |
Rehabilitate Runway 6/24 and connecting stub taxiway. |
06-033 |
EOE |
$9,026.00 |
$27,450.00 |
$693,043.00 |
$0.00 |
$729,519.00 |
Professional service fees for acquiring two tracts of property totaling 44.74 acres including engineering design fees for a new 4000' x 75' runway and for rehabilitating the existing runway into a parallel taxiway. |
06-032 |
MKS |
$112,330.14 |
$75,000.00 |
$0.00 |
$0.00 |
$187,330.14 |
Install security fencing |
06-031 |
MKS |
$2,195.00 |
$2,195.00 |
$83,410.00 |
$0.00 |
$87,800.00 |
Design services for a full parallel taxiway and wetland mitigation of approximately .6 acres of wetlands including wetland buffers. |
06-030 |
CRE |
$2,500.00 |
$2,500.00 |
$95,000.00 |
$0.00 |
$100,000.00 |
Installation of a precision approach path indicator lighting system (PAPI). |
06-029 |
SMS |
$3,947.00 |
$3,947.00 |
$150,000.00 |
$0.00 |
$157,894.00 |
Design services for a partial parallel taxiway relocation project; including the environmental assessment determination, runway safety area evaluation, and tree obstruction analysis. |
06-028 |
BBP |
$4,709.00 |
$4,709.00 |
$178,954.00 |
$0.00 |
$188,372.00 |
Engineering design and construction services for a taxiway lighting system, and a hangar taxiway. |
06-027 |
GGE |
$28,619.00 |
$19,080.00 |
$0.00 |
$0.00 |
$47,699.00 |
Wetland Delineation and Permitting for a 500' Runway Extension and Connecting Parallel Taxiway. |
06-026 |
HYW |
$35,256.00 |
$23,504.00 |
$45,000.00 |
$0.00 |
$103,760.00 |
Install Perimeter Fencing and Security Gates. |
06-025 |
CRE |
$119,122.00 |
$44,748.00 |
$302,383.00 |
$0.00 |
$466,253.00 |
Obstruction tree removal on airport property and on properties controlled by aviation easements. |
06-024 |
AQX |
$5,700.00 |
$5,700.00 |
$216,600.00 |
$0.00 |
$228,000.00 |
Install medium intensity taxiway lights |
06-023 |
SPA |
$13,066.00 |
$36,140.00 |
$934,926.00 |
$0.00 |
$984,132.00 |
Install 18,000 linear feet of security fencing, and for professional and administrative service fees for acquiring 23.4 acres of land in the approach to Runway 23. |
06-022 |
AIK |
$20,647.00 |
$20,647.00 |
$712,273.00 |
$0.00 |
$753,567.00 |
Apron rehabilitation project and engineering design fees |
06-020 |
HVS |
$3,109.00 |
$3,109.00 |
$118,152.00 |
$0.00 |
$124,370.00 |
Install security fencing |
06-019 |
GMU |
$21,072.00 |
$21,072.00 |
$800,738.00 |
$0.00 |
$842,882.00 |
Rehabilitate north apron |
06-018 |
UZA |
$7,755.00 |
$7,755.00 |
$294,709.00 |
$0.00 |
$310,219.00 |
Expand apron and conduct an airport drainage study |
06-017 |
UZA |
$11,460.00 |
$11,460.00 |
$435,498.00 |
$0.00 |
$458,418.00 |
Engineering design services for a 41,000 SY apron expansion, and runway extension feasibility study. |
06-016 |
ARW |
$2,968.00 |
$2,968.00 |
$0.00 |
$0.00 |
$5,936.00 |
Replacement of precision approach path indicator (PAPI) light on end of Runway 25. |
06-015 |
CKI |
$2,165.00 |
$2,165.00 |
$82,270.00 |
$0.00 |
$86,600.00 |
Engineering development and design services for a partial parallel taxiway including taxilanes for a future t-hangar complex. |
06-014 |
LUX |
$16,890.00 |
$16,890.00 |
$603,407.00 |
$0.00 |
$637,187.00 |
Paving and lighting of a partial parallel taxiway, installation of PAPI's, and REILS on the ends of Runways 8 and 26. |