06-013A |
AQX |
$125,000.00 |
$125,000.00 |
$150,000.00 |
$0.00 |
$400,000.00 |
Grant Amendment - terminal building construction. |
06-013 |
AQX |
$167,500.00 |
$167,500.00 |
$0.00 |
$0.00 |
$335,000.00 |
Construct a 2,500 square foot terminal building. |
06-012 |
CKI |
$23,508.00 |
$23,508.00 |
$893,314.00 |
$0.00 |
$940,330.00 |
Construct partial parallel taxiway and hangar taxilanes |
06-011 |
6J0 |
$12,251.00 |
$4,084.00 |
$0.00 |
$0.00 |
$16,335.00 |
Grassing and fertilizing the runway and taxiway safety areas to prevent soil erosion. |
06-010 |
SMS |
$6,150.00 |
$2,050.00 |
$0.00 |
$0.00 |
$8,200.00 |
Rehabilitate rotating beacon |
06-009 |
GGE |
$68,679.00 |
$45,786.00 |
$0.00 |
$0.00 |
$114,465.00 |
Engineering design and bidding services for extending Runway 5 by 500' including the associated parallel taxiway. Topographical survey, geotechnical subsurface investigation, development of a disadvantage business enterprise (DBE) plan, and runway safety area improvement design will be provided for this project. |
06-008 |
6J0 |
$3,499.00 |
$3,499.00 |
$132,946.00 |
$0.00 |
$139,944.00 |
Expand apron and construct vehicle access road |
06-007 |
BNL |
$300,000.00 |
$300,000.00 |
$0.00 |
$0.00 |
$600,000.00 |
Construct new terminal building |
06-005 |
HXD |
$129,073.00 |
$129,073.00 |
$4,904,765.00 |
$0.00 |
$5,162,911.00 |
Purchase an aircraft crash rescue fire fighting (ARFF) vehicle, including the expansion of the ARFF facility; acquire an emergency back-up generator for the airfield lighting system; widen and strengthen Runway 4/22; strengthen and expand the general aviation apron area (excluding pavement sealing); tree mitigation; and installation of security fencing |
06-004 |
GGE |
$42,031.00 |
$42,031.00 |
$1,597,166.00 |
$0.00 |
$1,681,228.00 |
Conduct environmental assessment for extending runway 5 by 500 feet, improve the terminal access road and auto parking area, relocate the airfield lighting vault, remove and relocate the rotating beacon, and expand the aircraft parking apron |
06-003 |
CDN |
$4,473.00 |
$4,473.00 |
$169,992.00 |
$0.00 |
$178,938.00 |
Engineering design services for a full parallel taxiway including rehabilitation of the existing partial parallel taxiway supporting runway 6/24. |
06-002 |
6J2 |
$19,850.00 |
$19,850.00 |
$754,282.00 |
$0.00 |
$793,982.00 |
Rehabilitate the asphalt pavement of runway 5/23, stub taxiway, and apron area. |
06-001 |
BBP |
$1,351.00 |
$1,351.00 |
$51,339.00 |
$0.00 |
$54,041.00 |
Update the airport layout plan and re-mark the runway and taxiway pavement markings |
05-031A |
RBW |
$135,379.00 |
$45,126.00 |
$0.00 |
$0.00 |
$180,505.00 |
Amend grant 05-031 to include corporate hangar taxiways |
05-031 |
RBW |
$207,278.00 |
$69,092.00 |
$0.00 |
$0.00 |
$276,370.00 |
For design and construction of an access road and taxiway to a corporate hangar area. |
05-030 |
99N |
$6,141.00 |
$6,141.00 |
$233,344.00 |
$0.00 |
$245,626.00 |
Construct a partial parallel taxiway including medium intensity taxiway lights |
05-029 |
HYW |
$3,950.00 |
$3,950.00 |
$150,000.00 |
$0.00 |
$157,900.00 |
Install perimeter fencing and security gates (Phase II) |
05-028 |
CRE |
$5,395.00 |
$5,395.00 |
$205,000.00 |
$0.00 |
$215,790.00 |
Installation of 2-box precision approach path indicator lighting system (PAPI), upgrade all airfield electrical wiring and install lighted airfield signage. |
05-027 |
GRD |
$8,892.00 |
$8,892.00 |
$337,902.00 |
$0.00 |
$355,686.00 |
Rehabilitate taxiway "D" |
05-026 |
52J |
$19,552.00 |
$19,552.00 |
$742,958.00 |
$0.00 |
$782,062.00 |
Construct, pave, and mark Runway 6/24. |