05-031 RBW $207,278.00 $69,092.00 $0.00 $0.00 $276,370.00 For design and construction of an access road and taxiway to a corporate hangar area.
05-030 99N $6,141.00 $6,141.00 $233,344.00 $0.00 $245,626.00 Construct a partial parallel taxiway including medium intensity taxiway lights
05-029 HYW $3,950.00 $3,950.00 $150,000.00 $0.00 $157,900.00 Install perimeter fencing and security gates (Phase II)
05-028 CRE $5,395.00 $5,395.00 $205,000.00 $0.00 $215,790.00 Installation of 2-box precision approach path indicator lighting system (PAPI), upgrade all airfield electrical wiring and install lighted airfield signage.
05-027 GRD $8,892.00 $8,892.00 $337,902.00 $0.00 $355,686.00 Rehabilitate taxiway "D"
05-026 52J $19,552.00 $19,552.00 $742,958.00 $0.00 $782,062.00 Construct, pave, and mark Runway 6/24.
05-025 HVS $1,191.25 $10,789.75 $227,639.00 $0.00 $239,620.00 Update the airport master plan and assist in the acquisition of 41.72 acres of property for obstruction clearing.
05-024 MYR $0.00 $350,000.00 $0.00 $0.00 $350,000.00 Renovate general aviation terminal building
05-023 FLO $65,140.00 $65,764.00 $2,499,019.00 $0.00 $2,629,923.00 Seal pavement cracks on Runway 1/19, parallel taxiway to Runway 1/19 and the aircraft terminal parking apron, and reconstruct the general aviation aircraft parking apron
05-022 6J4 $8,078.00 $8,078.00 $306,971.00 $0.00 $323,127.00 Rehabilitate runway 1/19, stub taxiway and apron area with an asphalt overlay.
05-021 6J0 $17,630.00 $5,877.00 $0.00 $0.00 $23,507.00 Repair airfield lighting system.
05-020 51J $48,750.00 $16,250.00 $0.00 $0.00 $65,000.00 Crack sealing airfield pavements and install light control for runway lights.
05-018 UDG $23,376.00 $23,376.00 $888,296.00 $0.00 $935,048.00 Extend Runway 23 and the parallel taxiway system by 500' and relocate 2,787' of Horse Branch Terrace Road
05-017 MKS $1,973.00 $1,974.00 $75,000.00 $0.00 $78,947.00 Environmental assessment study for the following work elements: Complete parallel taxiway, relocate non-directional beacon, security fencing, runway pavement resurfacing/strengthening, ODALS on Runway 5 approach end, expansion of the aircraft parking apron and construction of T-hangars and box hangars in the terminal area.
05-016 ARW $30,739.00 $30,739.00 $1,168,088.00 $0.00 $1,229,566.00 Construct partial parallel taxiway and rehabilitate asphalt apron.
05-015 AND $80,763.00 $80,763.00 $3,068,980.00 $0.00 $3,230,506.00 Extend RWY 5 (850') and RWY 23 (150') - project consist of paving, marking, lighting, re-installation of the glide slope antenna and the medium intensity approach lighting system with runway alignment indicator lights (MALSR) including the installation of precision approach path indicator lights (PAPI)
05-014 35A $16,737.00 $16,737.00 $636,000.00 $0.00 $669,474.00 Pave runway 5/23 with asphalt, including paving of a 550' runway extension, and installation of medium intensity runway lights.
05-013 LKR $7,956.00 $10,278.00 $300,000.00 $0.00 $318,234.00 Install an automated weather observation system (AWOS III)
05-012 AQX $20,444.00 $20,444.00 $776,887.00 $0.00 $817,775.00 Construct parallel taxiway to Runway 17/35.
05-011 CEU $22,250.00 $22,250.00 $0.00 $0.00 $44,500.00 Engineering services for relocating SR-37 (Shiloh Road). Project task will include project formulation, preliminary road alignment, coordination with South Carolina Department of Transportation for road alignment and applicable design standards.