05-031 |
RBW |
$207,278.00 |
$69,092.00 |
$0.00 |
$0.00 |
$276,370.00 |
For design and construction of an access road and taxiway to a corporate hangar area. |
05-030 |
99N |
$6,141.00 |
$6,141.00 |
$233,344.00 |
$0.00 |
$245,626.00 |
Construct a partial parallel taxiway including medium intensity taxiway lights |
05-029 |
HYW |
$3,950.00 |
$3,950.00 |
$150,000.00 |
$0.00 |
$157,900.00 |
Install perimeter fencing and security gates (Phase II) |
05-028 |
CRE |
$5,395.00 |
$5,395.00 |
$205,000.00 |
$0.00 |
$215,790.00 |
Installation of 2-box precision approach path indicator lighting system (PAPI), upgrade all airfield electrical wiring and install lighted airfield signage. |
05-027 |
GRD |
$8,892.00 |
$8,892.00 |
$337,902.00 |
$0.00 |
$355,686.00 |
Rehabilitate taxiway "D" |
05-026 |
52J |
$19,552.00 |
$19,552.00 |
$742,958.00 |
$0.00 |
$782,062.00 |
Construct, pave, and mark Runway 6/24. |
05-025 |
HVS |
$1,191.25 |
$10,789.75 |
$227,639.00 |
$0.00 |
$239,620.00 |
Update the airport master plan and assist in the acquisition of 41.72 acres of property for obstruction clearing. |
05-024 |
MYR |
$0.00 |
$350,000.00 |
$0.00 |
$0.00 |
$350,000.00 |
Renovate general aviation terminal building |
05-023 |
FLO |
$65,140.00 |
$65,764.00 |
$2,499,019.00 |
$0.00 |
$2,629,923.00 |
Seal pavement cracks on Runway 1/19, parallel taxiway to Runway 1/19 and the aircraft terminal parking apron, and reconstruct the general aviation aircraft parking apron |
05-022 |
6J4 |
$8,078.00 |
$8,078.00 |
$306,971.00 |
$0.00 |
$323,127.00 |
Rehabilitate runway 1/19, stub taxiway and apron area with an asphalt overlay. |
05-021 |
6J0 |
$17,630.00 |
$5,877.00 |
$0.00 |
$0.00 |
$23,507.00 |
Repair airfield lighting system. |
05-020 |
51J |
$48,750.00 |
$16,250.00 |
$0.00 |
$0.00 |
$65,000.00 |
Crack sealing airfield pavements and install light control for runway lights. |
05-018 |
UDG |
$23,376.00 |
$23,376.00 |
$888,296.00 |
$0.00 |
$935,048.00 |
Extend Runway 23 and the parallel taxiway system by 500' and relocate 2,787' of Horse Branch Terrace Road |
05-017 |
MKS |
$1,973.00 |
$1,974.00 |
$75,000.00 |
$0.00 |
$78,947.00 |
Environmental assessment study for the following work elements: Complete parallel taxiway, relocate non-directional beacon, security fencing, runway pavement resurfacing/strengthening, ODALS on Runway 5 approach end, expansion of the aircraft parking apron and construction of T-hangars and box hangars in the terminal area. |
05-016 |
ARW |
$30,739.00 |
$30,739.00 |
$1,168,088.00 |
$0.00 |
$1,229,566.00 |
Construct partial parallel taxiway and rehabilitate asphalt apron. |
05-015 |
AND |
$80,763.00 |
$80,763.00 |
$3,068,980.00 |
$0.00 |
$3,230,506.00 |
Extend RWY 5 (850') and RWY 23 (150') - project consist of paving, marking, lighting, re-installation of the glide slope antenna and the medium intensity approach lighting system with runway alignment indicator lights (MALSR) including the installation of precision approach path indicator lights (PAPI) |
05-014 |
35A |
$16,737.00 |
$16,737.00 |
$636,000.00 |
$0.00 |
$669,474.00 |
Pave runway 5/23 with asphalt, including paving of a 550' runway extension, and installation of medium intensity runway lights. |
05-013 |
LKR |
$7,956.00 |
$10,278.00 |
$300,000.00 |
$0.00 |
$318,234.00 |
Install an automated weather observation system (AWOS III) |
05-012 |
AQX |
$20,444.00 |
$20,444.00 |
$776,887.00 |
$0.00 |
$817,775.00 |
Construct parallel taxiway to Runway 17/35. |
05-011 |
CEU |
$22,250.00 |
$22,250.00 |
$0.00 |
$0.00 |
$44,500.00 |
Engineering services for relocating SR-37 (Shiloh Road). Project task will include project formulation, preliminary road alignment, coordination with South Carolina Department of Transportation for road alignment and applicable design standards. |