South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
05-004 CKI $3,766.00 $3,766.00 $67,788.00 $0.00 $75,320.00 Update the airport layout plan and have engineering design services rehabilitate the stub taxiway and apron areas with a five inch concrete overlay
05-002 CEU $6,000.00 $2,000.00 $0.00 $0.00 $8,000.00 Refurbish rotating beacon
05-001 PHH $41,432.00 $41,432.00 $1,574,426.00 $0.00 $1,657,290.00 Rehabilitate runway 18/36, stub taxiway, and apron pavements, improve the runway safety areas, install a new medium intensity runway lighting system and lighting vault, install precision approach path indicators (PAPI), and a new rotating beacon.
04-028 LKR $4,192.00 $4,192.00 $159,296.00 $0.00 $167,680.00 Runway 6 one hundred foot threshold relocation and automated weather observation system (AWOS) design project.
04-027 GRD $2,211.00 $2,211.00 $84,031.00 $0.00 $88,453.00 Design services for rehabilitating taxiway "D".
04-026 GGE $550,000.00 $1,250,000.00 $0.00 $0.00 $1,800,000.00 Construct new terminal building
04-025 CUB $259,791.00 $2,698,313.00 $1,640,761.00 $0.00 $4,598,865.00 Construct a new general aviation terminal building and t-hangar taxiways
04-024 BBP $2,488.00 $2,488.00 $94,550.00 $0.00 $99,526.00 Apron resealing and marking, including the replacement of runway lighting cables.
04-023 HVS $2,072.00 $2,072.00 $78,746.00 $0.00 $82,890.00 Clearing and grubbing of runway 21 approach
04-022 FDW $30,208.00 $30,208.00 $1,147,885.00 $0.00 $1,208,301.00 Preliminary and final engineering design and construction services for a 500' runway and parallel taxiway extension; including obstruction clearing in the approach to runway 23.
04-021 RBW $1,070.00 $1,070.00 $40,660.00 $0.00 $42,800.00 Update the airport layout plan.
04-020 CQW $3,502.00 $3,503.00 $133,095.00 $0.00 $140,100.00 Installation of an automated weather observation system with precipitation and thunderstorm sensors (AWOS III P/T)
04-019 DYB $63,750.00 $21,250.00 $0.00 $0.00 $85,000.00 Rejuvenate runway 6/24, parallel taxiway, and apron including painting of the airfield markings.
04-018 GMU $11,758.00 $11,758.00 $446,794.00 $0.00 $470,310.00 Install security fencing and gates.
04-017 MKS $17,750.00 $17,750.00 $674,500.00 $0.00 $710,000.00 Extend runway 5 (550' x 75'); construct taxiway turnaround; install medium intensity runway edge lights; and obstruction (tree) clearing.
04-016 CKI $12,833.00 $12,833.00 $487,640.00 $0.00 $513,306.00 A concrete overlay of the existing apron and stub taxiway including storm drainage improvements.
04-015 LQK $26,600.00 $26,600.00 $1,010,800.00 $0.00 $1,064,000.00 Rehabilitate the runway and apron asphalt pavement with a asphalt overlay including pavement markings and continuation of the t-hangar taxiway development project.
04-014 SPA $2,134.00 $2,134.00 $81,100.00 $0.00 $85,368.00 Installation of taxiway "B" medium intensity lighting system.
04-013 CEU $3,250.00 $3,250.00 $58,500.00 $0.00 $65,000.00 Conduct a "Preliminary Engineering Study for runway 7/25 extension". The study will identify runway extension options based on unrestricted and restricted lengths, sitting of a future precision NAVAIDS, re-routing highway SC-37, and the surrounding land use considerations. Detail cost estimates will be prepared for each option.
04-012 DCM $31,975.00 $31,975.00 $1,215,057.00 $0.00 $1,279,007.00 Rehabilitate runway 17/35 - project will include pavement reclamation of the existing runway, asphalt pavement removal, and placement of 3" of bituminous surface course