Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
03-032 BBP $8,946.00 $8,946.00 $161,023.00 $0.00 $178,915.00 Runway 24 approach clearing, vault improvements, wind cone replacement, and automated weather observation system (AWOS) installation.
03-031A SMS $19,444.00 $19,444.00 $350,000.00 $0.00 $388,888.00 Grant Amendment - Rehabilitate runway 5/23.
03-031 SMS $61,111.00 $61,111.00 $1,100,000.00 $0.00 $1,222,222.00 Rehabilitate runway 5/23 with an asphalt overlay.
03-030 6J4 $3,518.00 $3,518.00 $63,317.00 $0.00 $70,353.00 Develop an airport layout plan
03-029 AQX $1,752.00 $1,752.00 $31,526.00 $0.00 $35,030.00 Parallel taxiway design
03-028 LQK $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 T-hangar taxiway paving project
03-027 CDN $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Installation of precision approach path indicator lights (PAPIS) and runway end identify lights (REILS).
03-026 HVS $12,553.00 $12,553.00 $225,959.00 $0.00 $251,065.00 Installation of a new medium intensity runway lighting system, electrical vault, and perimeter fencing.
03-025 CQW $40,688.00 $13,562.00 $0.00 $0.00 $54,250.00 Sealing of airfield pavement cracks.
03-024 FDW $8,803.00 $32,864.00 $375,000.00 $0.00 $416,667.00 Land acquisition, environmental assessment, and related professional fees for acquiring property toward a future runway extension project.
03-023 EOE $5,505.00 $5,505.00 $99,083.00 $0.00 $110,093.00 Runway development alternatives analysis and environmental assessment.
03-022 CRE $262,104.00 $87,368.00 $0.00 $0.00 $349,472.00 Airfield pavement maintenance: Project to include asphalt crack sealing, application of sealer/rejuvenator, and airfield markings.
03-021 CRE $18,002.00 $18,002.00 $324,032.00 $0.00 $360,036.00 Rehabilitate the apron in front of the fixed base operator's terminal/hangar building complex.
03-020 HYW $46,524.00 $46,524.00 $837,433.00 $0.00 $930,481.00 Rehabilitate runway 4/22 and a portion of the parallel taxiway.
03-019 DCM $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Design services for rehabilitating runway 17/35 and for updating the existing airport layout plan including a property survey.
03-018 6J0 $9,995.00 $9,995.00 $179,915.00 $0.00 $199,905.00 Construction of security fencing and installation of three gates.
03-017 RBW $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 (A) Reinstall existing omni-directional approach lighting system (ODALS) on runway 23. (B) Relocate existing precision approach path indicator lighting system (PAPIS) on runway 23. (C) Install security fencing along Thunderbolt and Sidneys Roads.
03-016 GMU $47,195.00 $47,195.00 $849,517.00 $0.00 $943,907.00 Overlay parallel taxiway "A" and reimbursement of legal fees and court cost for the installation of a MALS-F system on runway 1.
03-015 CQW $14,732.00 $14,733.00 $265,185.00 $0.00 $294,650.00 Pave, mark, and light a 600' extension to runway 7/25 including a partial parallel taxiway.
03-014 UDG $10,032.00 $10,033.00 $180,585.00 $0.00 $200,650.00 Phase I - design services, extend runway 23 by 500' including the parallel taxiway; relocate approximately 2,750' of Horse Branch Terrace; and prepare a new airport layout plan.