04-011 |
UZA |
$12,375.00 |
$4,125.00 |
$0.00 |
$0.00 |
$16,500.00 |
Seal asphalt pavement crack with a rubberized sealant. |
04-010 |
MKS |
$200,000.00 |
$300,000.00 |
$0.00 |
$0.00 |
$500,000.00 |
Design and construction of a new general aviation terminal building. |
04-009 |
MKS |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Conduct an environmental assessment and engineering design study for a runway extension project, including the installation of security fencing. |
04-008 |
MKS |
$3,088.00 |
$3,088.00 |
$55,583.00 |
$0.00 |
$61,759.00 |
Rejuvenation, sealing, and marking of runway 5/23. |
04-006 |
PYG |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Install medium intensity runway lighting system, rotating beacon, and runway end identifier lighting system (REILS). |
04-005 |
GRD |
$11,398.00 |
$11,398.00 |
$205,167.00 |
$0.00 |
$227,963.00 |
Install perimeter fencing, gates (drive-thru and pedestrian), and electronic card control access system. |
04-003 |
CEU |
$8,125.00 |
$8,125.00 |
$146,250.00 |
$0.00 |
$162,500.00 |
Conduct a NEPA environmental assessment for Phase I proposed actions as consistent with the Oconee County Regional airport layout plan. |
04-002 |
AQX |
$0.00 |
$80,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Construct terminal building. |
04-001 |
HYW |
$200,000.00 |
$1,016,019.00 |
$0.00 |
$22,279.00 |
$1,238,298.00 |
Construct terminal building. |
03-037 |
LUX |
$16,666.00 |
$16,667.00 |
$300,000.00 |
$0.00 |
$333,333.00 |
Site preparation for completing the parallel taxiway and updating the airport master plan. |
03-036 |
BNL |
$75,701.00 |
$75,702.00 |
$1,362,627.00 |
$0.00 |
$1,514,030.00 |
Rehabilitate runway 16/34, install a new medium intensity runway lighting system, construct an airfield lighting vault, and obstruction clearing. |
03-035 |
MNI |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Construct hangar taxilane |
03-034 |
DYB |
$36,022.00 |
$36,023.00 |
$648,398.00 |
$0.00 |
$720,443.00 |
Apron rehabilitation and fencing project and update the airport layout plan. |
03-033 |
GGE |
$17,680.00 |
$17,680.00 |
$318,240.00 |
$0.00 |
$353,600.00 |
Construct t-hangar taxiways. |
03-032 |
BBP |
$8,946.00 |
$8,946.00 |
$161,023.00 |
$0.00 |
$178,915.00 |
Runway 24 approach clearing, vault improvements, wind cone replacement, and automated weather observation system (AWOS) installation. |
03-031A |
SMS |
$19,444.00 |
$19,444.00 |
$350,000.00 |
$0.00 |
$388,888.00 |
Grant Amendment - Rehabilitate runway 5/23. |
03-031 |
SMS |
$61,111.00 |
$61,111.00 |
$1,100,000.00 |
$0.00 |
$1,222,222.00 |
Rehabilitate runway 5/23 with an asphalt overlay. |
03-030 |
6J4 |
$3,518.00 |
$3,518.00 |
$63,317.00 |
$0.00 |
$70,353.00 |
Develop an airport layout plan |
03-029 |
AQX |
$1,752.00 |
$1,752.00 |
$31,526.00 |
$0.00 |
$35,030.00 |
Parallel taxiway design |
03-028 |
LQK |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
T-hangar taxiway paving project |