03-013 |
99N |
$11,527.00 |
$11,528.00 |
$207,490.00 |
$0.00 |
$230,545.00 |
Seal pavement cracks in runway 5/23 and connecting taxiways; install coal-tar emulsion seal coat on existing apron; install precision approach path indicator lights (PAPIS) on runway 5/23; install rotating beacon; install wind cone and segmented circle; and install new medium intensity runway lights on runway 5/23. |
03-012 |
AND |
$13,778.00 |
$13,778.00 |
$248,000.00 |
$0.00 |
$275,556.00 |
Phase II - runway extension; final design for site preparation for runway and taxiway extension (1000' x 100') and preliminary engineering for glide slope/MALSR relocation. |
03-011 |
BNL |
$11,692.00 |
$11,693.00 |
$210,468.00 |
$0.00 |
$233,853.00 |
Installation of an automated weather observation station (AWOS) and for engineering design services for rehabilitating runway 16/34. |
03-010 |
HXD |
$46,300.00 |
$46,300.00 |
$833,400.00 |
$0.00 |
$926,000.00 |
Installation of an automated weather observation system (AWOS); Engineering design services for a runway, taxiway, and apron asphalt rehabilitation project, including runway widening; Design for a runway blast pad and auto parking lot expansion, disadvantage business enterprise plan (DBE); preliminary feasibility study for extending the existing runway, and for security related projects (fencing and gates). |
03-009 |
HXD |
$183,333.00 |
$439,157.00 |
$985,000.00 |
$0.00 |
$1,607,490.00 |
Construct and equip an air traffic control tower |
03-008 |
ARW |
$20,553.00 |
$20,554.00 |
$369,964.00 |
$0.00 |
$411,071.00 |
Construction of apron and t-hangar taxilanes - Phase I |
03-007 |
ARW |
$10,920.00 |
$10,920.00 |
$0.00 |
$0.00 |
$21,840.00 |
Installation of Electro braid Fencing. |
03-006 |
HVS |
$9,000.00 |
$0.00 |
$0.00 |
$0.00 |
$9,000.00 |
Removal of brush and trees in the northeast end of airport property. Obstruction will be removed by Ashpluhdh Tree Company. |
03-005 |
35A |
$45,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Rejuvenate, crack seal, and paint runway 5/23. |
03-004 |
AIK |
$108,633.00 |
$108,633.00 |
$1,955,397.00 |
$0.00 |
$2,172,663.00 |
Extend RWY 6 by 500', rehabilitate runway 6/24, and the parallel taxiway. |
03-003 |
CDN |
$72,185.00 |
$24,062.00 |
$0.00 |
$0.00 |
$96,247.00 |
Apply coal-tar sealer/rejuvenator to runway 6/24 including painting of the runway markings. |
03-002 |
PYG |
$39,237.50 |
$39,237.50 |
$400,000.00 |
$0.00 |
$478,475.00 |
Rehabilitate runway 5/23, apron, and stud taxiway by reclaiming the existing airfield pavement into a soil-cement base and placing a 2" asphalt surface coarse upon the reclaim base. Develop an airport master plan. |
03-001 |
CEU |
$7,542.00 |
$7,543.00 |
$135,765.00 |
$0.00 |
$150,850.00 |
Installation of perimeter security fencing, runway extension justification study, and update the airport layout plan |
02-035 |
GRD |
$2,563.00 |
$2,564.00 |
$46,145.00 |
$0.00 |
$51,272.00 |
Update the airport layout plan |
02-034 |
LKR |
$26,512.00 |
$26,512.00 |
$0.00 |
$0.00 |
$53,024.00 |
Update the airport layout plan |
02-033 |
AND |
$25,000.00 |
$25,000.00 |
$0.00 |
$0.00 |
$50,000.00 |
Construct an aircraft parking apron in front of a hangar occupied by the Anderson County Sheriff's Aviation Unit |
02-032 |
6J0 |
$8,454.00 |
$8,455.00 |
$152,181.00 |
$0.00 |
$169,090.00 |
Crack seal runway, taxiway, and apron pavements including the removal of shoulder vegetation along runway 17/35. Install perimeter fencing and update the airport layout plan. |
02-031 |
CKI |
$54,297.00 |
$18,099.00 |
$0.00 |
$0.00 |
$72,396.00 |
Rejuvenate and paint runway 14/32. |
02-030 |
GMU |
$155,288.00 |
$155,288.00 |
$2,795,185.00 |
$0.00 |
$3,105,761.00 |
Rehabilitate runway 1/19 with an asphalt overlay, including grooving; improve the departure end of runway 1 safety area by installing an engineering material arresting system (EMAS); and install distance-to-go signs on runway 1/19. |
02-029 |
RBW |
$108,739.00 |
$108,739.00 |
$1,957,296.00 |
$0.00 |
$2,174,774.00 |
Rehabilitate runway 5/23 with an asphalt overlay and extend runway 5/23 to 6,000' X 100' including installation of a new medium intensity runway lighting system. |