Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
03-013 99N $11,527.00 $11,528.00 $207,490.00 $0.00 $230,545.00 Seal pavement cracks in runway 5/23 and connecting taxiways; install coal-tar emulsion seal coat on existing apron; install precision approach path indicator lights (PAPIS) on runway 5/23; install rotating beacon; install wind cone and segmented circle; and install new medium intensity runway lights on runway 5/23.
03-012 AND $13,778.00 $13,778.00 $248,000.00 $0.00 $275,556.00 Phase II - runway extension; final design for site preparation for runway and taxiway extension (1000' x 100') and preliminary engineering for glide slope/MALSR relocation.
03-011 BNL $11,692.00 $11,693.00 $210,468.00 $0.00 $233,853.00 Installation of an automated weather observation station (AWOS) and for engineering design services for rehabilitating runway 16/34.
03-010 HXD $46,300.00 $46,300.00 $833,400.00 $0.00 $926,000.00 Installation of an automated weather observation system (AWOS); Engineering design services for a runway, taxiway, and apron asphalt rehabilitation project, including runway widening; Design for a runway blast pad and auto parking lot expansion, disadvantage business enterprise plan (DBE); preliminary feasibility study for extending the existing runway, and for security related projects (fencing and gates).
03-009 HXD $183,333.00 $439,157.00 $985,000.00 $0.00 $1,607,490.00 Construct and equip an air traffic control tower
03-008 ARW $20,553.00 $20,554.00 $369,964.00 $0.00 $411,071.00 Construction of apron and t-hangar taxilanes - Phase I
03-007 ARW $10,920.00 $10,920.00 $0.00 $0.00 $21,840.00 Installation of Electro braid Fencing.
03-006 HVS $9,000.00 $0.00 $0.00 $0.00 $9,000.00 Removal of brush and trees in the northeast end of airport property. Obstruction will be removed by Ashpluhdh Tree Company.
03-005 35A $45,000.00 $15,000.00 $0.00 $0.00 $60,000.00 Rejuvenate, crack seal, and paint runway 5/23.
03-004 AIK $108,633.00 $108,633.00 $1,955,397.00 $0.00 $2,172,663.00 Extend RWY 6 by 500', rehabilitate runway 6/24, and the parallel taxiway.
03-003 CDN $72,185.00 $24,062.00 $0.00 $0.00 $96,247.00 Apply coal-tar sealer/rejuvenator to runway 6/24 including painting of the runway markings.
03-002 PYG $39,237.50 $39,237.50 $400,000.00 $0.00 $478,475.00 Rehabilitate runway 5/23, apron, and stud taxiway by reclaiming the existing airfield pavement into a soil-cement base and placing a 2" asphalt surface coarse upon the reclaim base. Develop an airport master plan.
03-001 CEU $7,542.00 $7,543.00 $135,765.00 $0.00 $150,850.00 Installation of perimeter security fencing, runway extension justification study, and update the airport layout plan
02-035 GRD $2,563.00 $2,564.00 $46,145.00 $0.00 $51,272.00 Update the airport layout plan
02-034 LKR $26,512.00 $26,512.00 $0.00 $0.00 $53,024.00 Update the airport layout plan
02-033 AND $25,000.00 $25,000.00 $0.00 $0.00 $50,000.00 Construct an aircraft parking apron in front of a hangar occupied by the Anderson County Sheriff's Aviation Unit
02-032 6J0 $8,454.00 $8,455.00 $152,181.00 $0.00 $169,090.00 Crack seal runway, taxiway, and apron pavements including the removal of shoulder vegetation along runway 17/35. Install perimeter fencing and update the airport layout plan.
02-031 CKI $54,297.00 $18,099.00 $0.00 $0.00 $72,396.00 Rejuvenate and paint runway 14/32.
02-030 GMU $155,288.00 $155,288.00 $2,795,185.00 $0.00 $3,105,761.00 Rehabilitate runway 1/19 with an asphalt overlay, including grooving; improve the departure end of runway 1 safety area by installing an engineering material arresting system (EMAS); and install distance-to-go signs on runway 1/19.
02-029 RBW $108,739.00 $108,739.00 $1,957,296.00 $0.00 $2,174,774.00 Rehabilitate runway 5/23 with an asphalt overlay and extend runway 5/23 to 6,000' X 100' including installation of a new medium intensity runway lighting system.