03-027 |
CDN |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Installation of precision approach path indicator lights (PAPIS) and runway end identify lights (REILS). |
03-026 |
HVS |
$12,553.00 |
$12,553.00 |
$225,959.00 |
$0.00 |
$251,065.00 |
Installation of a new medium intensity runway lighting system, electrical vault, and perimeter fencing. |
03-025 |
CQW |
$40,688.00 |
$13,562.00 |
$0.00 |
$0.00 |
$54,250.00 |
Sealing of airfield pavement cracks. |
03-024 |
FDW |
$8,803.00 |
$32,864.00 |
$375,000.00 |
$0.00 |
$416,667.00 |
Land acquisition, environmental assessment, and related professional fees for acquiring property toward a future runway extension project. |
03-023 |
EOE |
$5,505.00 |
$5,505.00 |
$99,083.00 |
$0.00 |
$110,093.00 |
Runway development alternatives analysis and environmental assessment. |
03-022 |
CRE |
$262,104.00 |
$87,368.00 |
$0.00 |
$0.00 |
$349,472.00 |
Airfield pavement maintenance: Project to include asphalt crack sealing, application of sealer/rejuvenator, and airfield markings. |
03-021 |
CRE |
$18,002.00 |
$18,002.00 |
$324,032.00 |
$0.00 |
$360,036.00 |
Rehabilitate the apron in front of the fixed base operator's terminal/hangar building complex. |
03-020 |
HYW |
$46,524.00 |
$46,524.00 |
$837,433.00 |
$0.00 |
$930,481.00 |
Rehabilitate runway 4/22 and a portion of the parallel taxiway. |
03-019 |
DCM |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Design services for rehabilitating runway 17/35 and for updating the existing airport layout plan including a property survey. |
03-018 |
6J0 |
$9,995.00 |
$9,995.00 |
$179,915.00 |
$0.00 |
$199,905.00 |
Construction of security fencing and installation of three gates. |
03-017 |
RBW |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
(A) Reinstall existing omni-directional approach lighting system (ODALS) on runway 23.
(B) Relocate existing precision approach path indicator lighting system (PAPIS) on runway 23.
(C) Install security fencing along Thunderbolt and Sidneys Roads. |
03-016 |
GMU |
$47,195.00 |
$47,195.00 |
$849,517.00 |
$0.00 |
$943,907.00 |
Overlay parallel taxiway "A" and reimbursement of legal fees and court cost for the installation of a MALS-F system on runway 1. |
03-015 |
CQW |
$14,732.00 |
$14,733.00 |
$265,185.00 |
$0.00 |
$294,650.00 |
Pave, mark, and light a 600' extension to runway 7/25 including a partial parallel taxiway. |
03-014 |
UDG |
$10,032.00 |
$10,033.00 |
$180,585.00 |
$0.00 |
$200,650.00 |
Phase I - design services, extend runway 23 by 500' including the parallel taxiway; relocate approximately 2,750' of Horse Branch Terrace; and prepare a new airport layout plan. |
03-013 |
99N |
$11,527.00 |
$11,528.00 |
$207,490.00 |
$0.00 |
$230,545.00 |
Seal pavement cracks in runway 5/23 and connecting taxiways; install coal-tar emulsion seal coat on existing apron; install precision approach path indicator lights (PAPIS) on runway 5/23; install rotating beacon; install wind cone and segmented circle; and install new medium intensity runway lights on runway 5/23. |
03-012 |
AND |
$13,778.00 |
$13,778.00 |
$248,000.00 |
$0.00 |
$275,556.00 |
Phase II - runway extension; final design for site preparation for runway and taxiway extension (1000' x 100') and preliminary engineering for glide slope/MALSR relocation. |
03-011 |
BNL |
$11,692.00 |
$11,693.00 |
$210,468.00 |
$0.00 |
$233,853.00 |
Installation of an automated weather observation station (AWOS) and for engineering design services for rehabilitating runway 16/34. |
03-010 |
HXD |
$46,300.00 |
$46,300.00 |
$833,400.00 |
$0.00 |
$926,000.00 |
Installation of an automated weather observation system (AWOS); Engineering design services for a runway, taxiway, and apron asphalt rehabilitation project, including runway widening; Design for a runway blast pad and auto parking lot expansion, disadvantage business enterprise plan (DBE); preliminary feasibility study for extending the existing runway, and for security related projects (fencing and gates). |
03-009 |
HXD |
$183,333.00 |
$439,157.00 |
$985,000.00 |
$0.00 |
$1,607,490.00 |
Construct and equip an air traffic control tower |
03-008 |
ARW |
$20,553.00 |
$20,554.00 |
$369,964.00 |
$0.00 |
$411,071.00 |
Construction of apron and t-hangar taxilanes - Phase I |