02-007 |
EOE |
$26,650.00 |
$26,650.00 |
$0.00 |
$0.00 |
$53,300.00 |
Runway extension justification study and environmental assessment. |
02-006 |
EOE |
$3,041.50 |
$3,041.50 |
$54,750.00 |
$0.00 |
$60,833.00 |
Runway 4/22 asphalt rehabilitation design and updating the airport layout plan. |
02-005 |
UZA |
$12,251.00 |
$12,252.00 |
$172,500.00 |
$0.00 |
$197,003.00 |
Master plan update including a property plat survey. |
02-004A |
HVS |
$4,389.00 |
$4,389.00 |
$79,000.00 |
$0.00 |
$87,778.00 |
Rehabilitate apron with a 2" asphalt overlay. |
02-004 |
HVS |
$35,750.00 |
$35,750.00 |
$643,500.00 |
$0.00 |
$715,000.00 |
Construction of a partial parallel taxiway "A", and installation of medium intensity taxiway lights (MITL). |
02-003 |
SMS |
$100,000.00 |
$436,863.00 |
$0.00 |
$0.00 |
$536,863.00 |
Construct a 10 unit t-hangar and a 80' X 80' box storage hangar. |
02-002 |
LQK |
$11,040.00 |
$279,245.00 |
$0.00 |
$0.00 |
$290,285.00 |
Construct taxiways to serve a new 12 unit t-hangar. |
02-001 |
GGE |
$26,250.00 |
$8,750.00 |
$0.00 |
$0.00 |
$35,000.00 |
Re-mark runway 5/23. |
01-036 |
GRD |
$54,024.00 |
$54,024.00 |
$972,425.00 |
$0.00 |
$1,080,473.00 |
Rehabilitate asphalt pavement and lighting system for taxiway "A" including the two connecting taxiways to runway 9/27. |
01-033 |
LUX |
$37,500.00 |
$12,500.00 |
$0.00 |
$0.00 |
$50,000.00 |
Crack seal airfield pavement |
01-032 |
SMS |
$38,925.00 |
$12,975.00 |
$0.00 |
$0.00 |
$51,900.00 |
Approach and transitional clearing along runway 5/23. |
01-031 |
DYB |
$16,352.00 |
$16,353.00 |
$294,343.00 |
$0.00 |
$327,048.00 |
Perform planning services for an environmental assessment, including a wetland permitting and mitigation plan. |
01-030A |
LUX |
$7,500.00 |
$2,500.00 |
$0.00 |
$0.00 |
$10,000.00 |
Grant amendment for rejuvenate the airfield pavement |
01-030 |
LUX |
$45,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Rejuvenate airfield pavement |
01-029 |
3J1 |
$14,491.00 |
$14,492.00 |
$260,846.00 |
$0.00 |
$289,829.00 |
Site selection study for a new airport. Professional services will accomplish an environmental assessment, a master plan study, airport layout plans, and a disadvantage business enterprise (DPE) plan. |
01-028 |
OGB |
$5,670.00 |
$5,670.00 |
$0.00 |
$0.00 |
$11,340.00 |
Apply a fuel resistant sealer to the apron. |
01-027 |
OGB |
$50,000.00 |
$50,000.00 |
$900,000.00 |
$0.00 |
$1,000,000.00 |
Remove obstructions (trees) along runway 17/35, install security fencing, and property acquisition. |
01-026 |
CKI |
$5,366.00 |
$5,367.00 |
$96,599.00 |
$0.00 |
$107,332.00 |
Design of runway lighting improvements; install precision approach path indicator lights, rotating beacon, and erect a new beacon tower. |
01-025 |
GMU |
$42,382.00 |
$42,382.00 |
$762,877.00 |
$0.00 |
$847,641.00 |
Relocate and install a new high intensity runway lighting system, rehabilitate medium intensity taxiway lights on taxiways "A" and "B", relocate runway and taxiway signage. Basic engineering design and construction administration services for rehabilitating runway 1/19. |
01-023 |
CDN |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
Install automated weather observation system (AWOS III P-T) with runway surface condition sensors and airfield pavement crack sealing. |