South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
02-022 FLO $65,360.00 $65,360.00 $1,176,473.00 $0.00 $1,307,193.00 Overlay, mark, and light the parallel and connecting taxiway G system to runway 9/27. Rehabilitate, mark, and light taxiway E (Phase II), and repair two storm water drainage inlets on the general aviation apron. Install approximately 5,900' of fencing for wildlife control.
02-021 AND $0.00 $73,857.00 $780,420.00 $0.00 $854,277.00 Runway extension Phase II: Land Acquisition, disadvantage business enterprise (DBE) plan preparation, and a FAA reimbursable agreement for coordinating the relocation of the medium intensity approach lighting system (MALSR).
02-020 SMS $41,287.00 $41,287.00 $743,161.00 $0.00 $825,735.00 Parallel taxiway rehabilitation and apron overlay
02-019 CDN $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 Update the airport layout plan and install taxiway lighting.
02-018 FDW $6,111.00 $6,111.00 $110,000.00 $0.00 $122,222.00 Update the airport layout plan and install security fencing
02-017 GGE $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Prepare a runway justification study for extending runway 5/23 to 6,000'. Clear, grub, and install a 6' security perimeter fence including walk/drive gates.
02-016 AQX $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Rehabilitate airfield lighting system
02-015 CQW $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 Site preparation and drainage for a 600' runway extension of runway 7/25, including a partial parallel taxiway system.
02-014 52J $11,505.00 $11,506.00 $207,100.00 $0.00 $230,111.00 Site preparation, grading, drainage, and approach clearing for a new 3,200' runway.
02-013 PHH $14,000.00 $14,000.00 $0.00 $0.00 $28,000.00 Install non-directional beacon (NDB).
02-011 MNI $16,716.70 $16,716.70 $300,901.00 $0.00 $334,334.40 Installation of medium intensity runway and taxiway lighting system, install precision approach path indicators (PAPI's) and update the airport layout plan
02-010 UZA $21,500.00 $21,500.00 $0.00 $0.00 $43,000.00 Install security fencing and automated security gate.
02-009 HVS $41,000.00 $0.00 $0.00 $0.00 $41,000.00 Install a 100LL aviation fuel facility.
02-008 EOE $15,500.00 $15,500.00 $279,000.00 $0.00 $310,000.00 Rehabilitate runway 4/22 with an asphalt overlay.
02-007 EOE $26,650.00 $26,650.00 $0.00 $0.00 $53,300.00 Runway extension justification study and environmental assessment.
02-006 EOE $3,041.50 $3,041.50 $54,750.00 $0.00 $60,833.00 Runway 4/22 asphalt rehabilitation design and updating the airport layout plan.
02-005 UZA $12,251.00 $12,252.00 $172,500.00 $0.00 $197,003.00 Master plan update including a property plat survey.
02-004A HVS $4,389.00 $4,389.00 $79,000.00 $0.00 $87,778.00 Rehabilitate apron with a 2" asphalt overlay.
02-004 HVS $35,750.00 $35,750.00 $643,500.00 $0.00 $715,000.00 Construction of a partial parallel taxiway "A", and installation of medium intensity taxiway lights (MITL).
02-003 SMS $100,000.00 $436,863.00 $0.00 $0.00 $536,863.00 Construct a 10 unit t-hangar and a 80' X 80' box storage hangar.