South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
02-007 EOE $26,650.00 $26,650.00 $0.00 $0.00 $53,300.00 Runway extension justification study and environmental assessment.
02-006 EOE $3,041.50 $3,041.50 $54,750.00 $0.00 $60,833.00 Runway 4/22 asphalt rehabilitation design and updating the airport layout plan.
02-005 UZA $12,251.00 $12,252.00 $172,500.00 $0.00 $197,003.00 Master plan update including a property plat survey.
02-004A HVS $4,389.00 $4,389.00 $79,000.00 $0.00 $87,778.00 Rehabilitate apron with a 2" asphalt overlay.
02-004 HVS $35,750.00 $35,750.00 $643,500.00 $0.00 $715,000.00 Construction of a partial parallel taxiway "A", and installation of medium intensity taxiway lights (MITL).
02-003 SMS $100,000.00 $436,863.00 $0.00 $0.00 $536,863.00 Construct a 10 unit t-hangar and a 80' X 80' box storage hangar.
02-002 LQK $11,040.00 $279,245.00 $0.00 $0.00 $290,285.00 Construct taxiways to serve a new 12 unit t-hangar.
02-001 GGE $26,250.00 $8,750.00 $0.00 $0.00 $35,000.00 Re-mark runway 5/23.
01-036 GRD $54,024.00 $54,024.00 $972,425.00 $0.00 $1,080,473.00 Rehabilitate asphalt pavement and lighting system for taxiway "A" including the two connecting taxiways to runway 9/27.
01-033 LUX $37,500.00 $12,500.00 $0.00 $0.00 $50,000.00 Crack seal airfield pavement
01-032 SMS $38,925.00 $12,975.00 $0.00 $0.00 $51,900.00 Approach and transitional clearing along runway 5/23.
01-031 DYB $16,352.00 $16,353.00 $294,343.00 $0.00 $327,048.00 Perform planning services for an environmental assessment, including a wetland permitting and mitigation plan.
01-030A LUX $7,500.00 $2,500.00 $0.00 $0.00 $10,000.00 Grant amendment for rejuvenate the airfield pavement
01-030 LUX $45,000.00 $15,000.00 $0.00 $0.00 $60,000.00 Rejuvenate airfield pavement
01-029 3J1 $14,491.00 $14,492.00 $260,846.00 $0.00 $289,829.00 Site selection study for a new airport. Professional services will accomplish an environmental assessment, a master plan study, airport layout plans, and a disadvantage business enterprise (DPE) plan.
01-028 OGB $5,670.00 $5,670.00 $0.00 $0.00 $11,340.00 Apply a fuel resistant sealer to the apron.
01-027 OGB $50,000.00 $50,000.00 $900,000.00 $0.00 $1,000,000.00 Remove obstructions (trees) along runway 17/35, install security fencing, and property acquisition.
01-026 CKI $5,366.00 $5,367.00 $96,599.00 $0.00 $107,332.00 Design of runway lighting improvements; install precision approach path indicator lights, rotating beacon, and erect a new beacon tower.
01-025 GMU $42,382.00 $42,382.00 $762,877.00 $0.00 $847,641.00 Relocate and install a new high intensity runway lighting system, rehabilitate medium intensity taxiway lights on taxiways "A" and "B", relocate runway and taxiway signage. Basic engineering design and construction administration services for rehabilitating runway 1/19.
01-023 CDN $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 Install automated weather observation system (AWOS III P-T) with runway surface condition sensors and airfield pavement crack sealing.