02-022 |
FLO |
$65,360.00 |
$65,360.00 |
$1,176,473.00 |
$0.00 |
$1,307,193.00 |
Overlay, mark, and light the parallel and connecting taxiway G system to runway 9/27. Rehabilitate, mark, and light taxiway E (Phase II), and repair two storm water drainage inlets on the general aviation apron. Install approximately 5,900' of fencing for wildlife control. |
02-021 |
AND |
$0.00 |
$73,857.00 |
$780,420.00 |
$0.00 |
$854,277.00 |
Runway extension Phase II: Land Acquisition, disadvantage business enterprise (DBE) plan preparation, and a FAA reimbursable agreement for coordinating the relocation of the medium intensity approach lighting system (MALSR). |
02-020 |
SMS |
$41,287.00 |
$41,287.00 |
$743,161.00 |
$0.00 |
$825,735.00 |
Parallel taxiway rehabilitation and apron overlay |
02-019 |
CDN |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
Update the airport layout plan and install taxiway lighting. |
02-018 |
FDW |
$6,111.00 |
$6,111.00 |
$110,000.00 |
$0.00 |
$122,222.00 |
Update the airport layout plan and install security fencing |
02-017 |
GGE |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Prepare a runway justification study for extending runway 5/23 to 6,000'. Clear, grub, and install a 6' security perimeter fence including walk/drive gates. |
02-016 |
AQX |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Rehabilitate airfield lighting system |
02-015 |
CQW |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
Site preparation and drainage for a 600' runway extension of runway 7/25, including a partial parallel taxiway system. |
02-014 |
52J |
$11,505.00 |
$11,506.00 |
$207,100.00 |
$0.00 |
$230,111.00 |
Site preparation, grading, drainage, and approach clearing for a new 3,200' runway. |
02-013 |
PHH |
$14,000.00 |
$14,000.00 |
$0.00 |
$0.00 |
$28,000.00 |
Install non-directional beacon (NDB). |
02-011 |
MNI |
$16,716.70 |
$16,716.70 |
$300,901.00 |
$0.00 |
$334,334.40 |
Installation of medium intensity runway and taxiway lighting system, install precision approach path indicators (PAPI's) and update the airport layout plan |
02-010 |
UZA |
$21,500.00 |
$21,500.00 |
$0.00 |
$0.00 |
$43,000.00 |
Install security fencing and automated security gate. |
02-009 |
HVS |
$41,000.00 |
$0.00 |
$0.00 |
$0.00 |
$41,000.00 |
Install a 100LL aviation fuel facility. |
02-008 |
EOE |
$15,500.00 |
$15,500.00 |
$279,000.00 |
$0.00 |
$310,000.00 |
Rehabilitate runway 4/22 with an asphalt overlay. |
02-007 |
EOE |
$26,650.00 |
$26,650.00 |
$0.00 |
$0.00 |
$53,300.00 |
Runway extension justification study and environmental assessment. |
02-006 |
EOE |
$3,041.50 |
$3,041.50 |
$54,750.00 |
$0.00 |
$60,833.00 |
Runway 4/22 asphalt rehabilitation design and updating the airport layout plan. |
02-005 |
UZA |
$12,251.00 |
$12,252.00 |
$172,500.00 |
$0.00 |
$197,003.00 |
Master plan update including a property plat survey. |
02-004A |
HVS |
$4,389.00 |
$4,389.00 |
$79,000.00 |
$0.00 |
$87,778.00 |
Rehabilitate apron with a 2" asphalt overlay. |
02-004 |
HVS |
$35,750.00 |
$35,750.00 |
$643,500.00 |
$0.00 |
$715,000.00 |
Construction of a partial parallel taxiway "A", and installation of medium intensity taxiway lights (MITL). |
02-003 |
SMS |
$100,000.00 |
$436,863.00 |
$0.00 |
$0.00 |
$536,863.00 |
Construct a 10 unit t-hangar and a 80' X 80' box storage hangar. |