Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
03-007 ARW $10,920.00 $10,920.00 $0.00 $0.00 $21,840.00 Installation of Electro braid Fencing.
03-006 HVS $9,000.00 $0.00 $0.00 $0.00 $9,000.00 Removal of brush and trees in the northeast end of airport property. Obstruction will be removed by Ashpluhdh Tree Company.
03-005 35A $45,000.00 $15,000.00 $0.00 $0.00 $60,000.00 Rejuvenate, crack seal, and paint runway 5/23.
03-004 AIK $108,633.00 $108,633.00 $1,955,397.00 $0.00 $2,172,663.00 Extend RWY 6 by 500', rehabilitate runway 6/24, and the parallel taxiway.
03-003 CDN $72,185.00 $24,062.00 $0.00 $0.00 $96,247.00 Apply coal-tar sealer/rejuvenator to runway 6/24 including painting of the runway markings.
03-002 PYG $39,237.50 $39,237.50 $400,000.00 $0.00 $478,475.00 Rehabilitate runway 5/23, apron, and stud taxiway by reclaiming the existing airfield pavement into a soil-cement base and placing a 2" asphalt surface coarse upon the reclaim base. Develop an airport master plan.
03-001 CEU $7,542.00 $7,543.00 $135,765.00 $0.00 $150,850.00 Installation of perimeter security fencing, runway extension justification study, and update the airport layout plan
02-035 GRD $2,563.00 $2,564.00 $46,145.00 $0.00 $51,272.00 Update the airport layout plan
02-034 LKR $26,512.00 $26,512.00 $0.00 $0.00 $53,024.00 Update the airport layout plan
02-033 AND $25,000.00 $25,000.00 $0.00 $0.00 $50,000.00 Construct an aircraft parking apron in front of a hangar occupied by the Anderson County Sheriff's Aviation Unit
02-032 6J0 $8,454.00 $8,455.00 $152,181.00 $0.00 $169,090.00 Crack seal runway, taxiway, and apron pavements including the removal of shoulder vegetation along runway 17/35. Install perimeter fencing and update the airport layout plan.
02-031 CKI $54,297.00 $18,099.00 $0.00 $0.00 $72,396.00 Rejuvenate and paint runway 14/32.
02-030 GMU $155,288.00 $155,288.00 $2,795,185.00 $0.00 $3,105,761.00 Rehabilitate runway 1/19 with an asphalt overlay, including grooving; improve the departure end of runway 1 safety area by installing an engineering material arresting system (EMAS); and install distance-to-go signs on runway 1/19.
02-029 RBW $108,739.00 $108,739.00 $1,957,296.00 $0.00 $2,174,774.00 Rehabilitate runway 5/23 with an asphalt overlay and extend runway 5/23 to 6,000' X 100' including installation of a new medium intensity runway lighting system.
02-028 CKI $6,336.00 $6,336.00 $114,050.00 $0.00 $126,722.00 Rehabilitate the medium intensity runway lighting system.
02-027 HYW $107,186.00 $107,186.00 $896,153.00 $0.00 $1,110,525.00 Reconstruct apron area, installation of a new non-directional beacon, and runway 4/22 pavement condition study and rehabilitation design.
02-026 FLO $27,289.44 $27,289.45 $491,210.00 $0.00 $545,788.89 Relocate McCall Boulevard (S-21-675)
02-025 LQK $8,308.00 $8,308.00 $149,550.00 $0.00 $166,166.00 Site work for constructing a taxiway to serve a hangar development area.
02-024 BBP $15,590.00 $15,591.00 $280,629.00 $0.00 $311,810.00 Runway safety area improvements, runway 24 approach clearing; rehabilitate the precision approach path indicators lights (PAPI's) to runway 24; replace runway end identifier lights (REIL's) and rotating beacon; install automated weather observation system (AWOS) circuits and foundation; prepare a height restriction ordinance and update the disadvantage business enterprise (DBE) plan.
02-023 CUB $2,000.00 $2,000.00 $36,000.00 $0.00 $40,000.00 Construct airfield security fencing around the Curtis Wright hangar.