02-028 |
CKI |
$6,336.00 |
$6,336.00 |
$114,050.00 |
$0.00 |
$126,722.00 |
Rehabilitate the medium intensity runway lighting system. |
02-027 |
HYW |
$107,186.00 |
$107,186.00 |
$896,153.00 |
$0.00 |
$1,110,525.00 |
Reconstruct apron area, installation of a new non-directional beacon, and runway 4/22 pavement condition study and rehabilitation design. |
02-026 |
FLO |
$27,289.44 |
$27,289.45 |
$491,210.00 |
$0.00 |
$545,788.89 |
Relocate McCall Boulevard (S-21-675) |
02-025 |
LQK |
$8,308.00 |
$8,308.00 |
$149,550.00 |
$0.00 |
$166,166.00 |
Site work for constructing a taxiway to serve a hangar development area. |
02-024 |
BBP |
$15,590.00 |
$15,591.00 |
$280,629.00 |
$0.00 |
$311,810.00 |
Runway safety area improvements, runway 24 approach clearing; rehabilitate the precision approach path indicators lights (PAPI's) to runway 24; replace runway end identifier lights (REIL's) and rotating beacon; install automated weather observation system (AWOS) circuits and foundation; prepare a height restriction ordinance and update the disadvantage business enterprise (DBE) plan. |
02-023 |
CUB |
$2,000.00 |
$2,000.00 |
$36,000.00 |
$0.00 |
$40,000.00 |
Construct airfield security fencing around the Curtis Wright hangar. |
02-022 |
FLO |
$65,360.00 |
$65,360.00 |
$1,176,473.00 |
$0.00 |
$1,307,193.00 |
Overlay, mark, and light the parallel and connecting taxiway G system to runway 9/27. Rehabilitate, mark, and light taxiway E (Phase II), and repair two storm water drainage inlets on the general aviation apron. Install approximately 5,900' of fencing for wildlife control. |
02-021 |
AND |
$0.00 |
$73,857.00 |
$780,420.00 |
$0.00 |
$854,277.00 |
Runway extension Phase II: Land Acquisition, disadvantage business enterprise (DBE) plan preparation, and a FAA reimbursable agreement for coordinating the relocation of the medium intensity approach lighting system (MALSR). |
02-020 |
SMS |
$41,287.00 |
$41,287.00 |
$743,161.00 |
$0.00 |
$825,735.00 |
Parallel taxiway rehabilitation and apron overlay |
02-019 |
CDN |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
Update the airport layout plan and install taxiway lighting. |
02-018 |
FDW |
$6,111.00 |
$6,111.00 |
$110,000.00 |
$0.00 |
$122,222.00 |
Update the airport layout plan and install security fencing |
02-017 |
GGE |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Prepare a runway justification study for extending runway 5/23 to 6,000'. Clear, grub, and install a 6' security perimeter fence including walk/drive gates. |
02-016 |
AQX |
$8,333.00 |
$8,333.00 |
$150,000.00 |
$0.00 |
$166,666.00 |
Rehabilitate airfield lighting system |
02-015 |
CQW |
$8,333.00 |
$8,334.00 |
$150,000.00 |
$0.00 |
$166,667.00 |
Site preparation and drainage for a 600' runway extension of runway 7/25, including a partial parallel taxiway system. |
02-014 |
52J |
$11,505.00 |
$11,506.00 |
$207,100.00 |
$0.00 |
$230,111.00 |
Site preparation, grading, drainage, and approach clearing for a new 3,200' runway. |
02-013 |
PHH |
$14,000.00 |
$14,000.00 |
$0.00 |
$0.00 |
$28,000.00 |
Install non-directional beacon (NDB). |
02-011 |
MNI |
$16,716.70 |
$16,716.70 |
$300,901.00 |
$0.00 |
$334,334.40 |
Installation of medium intensity runway and taxiway lighting system, install precision approach path indicators (PAPI's) and update the airport layout plan |
02-010 |
UZA |
$21,500.00 |
$21,500.00 |
$0.00 |
$0.00 |
$43,000.00 |
Install security fencing and automated security gate. |
02-009 |
HVS |
$41,000.00 |
$0.00 |
$0.00 |
$0.00 |
$41,000.00 |
Install a 100LL aviation fuel facility. |
02-008 |
EOE |
$15,500.00 |
$15,500.00 |
$279,000.00 |
$0.00 |
$310,000.00 |
Rehabilitate runway 4/22 with an asphalt overlay. |