Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
02-028 CKI $6,336.00 $6,336.00 $114,050.00 $0.00 $126,722.00 Rehabilitate the medium intensity runway lighting system.
02-027 HYW $107,186.00 $107,186.00 $896,153.00 $0.00 $1,110,525.00 Reconstruct apron area, installation of a new non-directional beacon, and runway 4/22 pavement condition study and rehabilitation design.
02-026 FLO $27,289.44 $27,289.45 $491,210.00 $0.00 $545,788.89 Relocate McCall Boulevard (S-21-675)
02-025 LQK $8,308.00 $8,308.00 $149,550.00 $0.00 $166,166.00 Site work for constructing a taxiway to serve a hangar development area.
02-024 BBP $15,590.00 $15,591.00 $280,629.00 $0.00 $311,810.00 Runway safety area improvements, runway 24 approach clearing; rehabilitate the precision approach path indicators lights (PAPI's) to runway 24; replace runway end identifier lights (REIL's) and rotating beacon; install automated weather observation system (AWOS) circuits and foundation; prepare a height restriction ordinance and update the disadvantage business enterprise (DBE) plan.
02-023 CUB $2,000.00 $2,000.00 $36,000.00 $0.00 $40,000.00 Construct airfield security fencing around the Curtis Wright hangar.
02-022 FLO $65,360.00 $65,360.00 $1,176,473.00 $0.00 $1,307,193.00 Overlay, mark, and light the parallel and connecting taxiway G system to runway 9/27. Rehabilitate, mark, and light taxiway E (Phase II), and repair two storm water drainage inlets on the general aviation apron. Install approximately 5,900' of fencing for wildlife control.
02-021 AND $0.00 $73,857.00 $780,420.00 $0.00 $854,277.00 Runway extension Phase II: Land Acquisition, disadvantage business enterprise (DBE) plan preparation, and a FAA reimbursable agreement for coordinating the relocation of the medium intensity approach lighting system (MALSR).
02-020 SMS $41,287.00 $41,287.00 $743,161.00 $0.00 $825,735.00 Parallel taxiway rehabilitation and apron overlay
02-019 CDN $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 Update the airport layout plan and install taxiway lighting.
02-018 FDW $6,111.00 $6,111.00 $110,000.00 $0.00 $122,222.00 Update the airport layout plan and install security fencing
02-017 GGE $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Prepare a runway justification study for extending runway 5/23 to 6,000'. Clear, grub, and install a 6' security perimeter fence including walk/drive gates.
02-016 AQX $8,333.00 $8,333.00 $150,000.00 $0.00 $166,666.00 Rehabilitate airfield lighting system
02-015 CQW $8,333.00 $8,334.00 $150,000.00 $0.00 $166,667.00 Site preparation and drainage for a 600' runway extension of runway 7/25, including a partial parallel taxiway system.
02-014 52J $11,505.00 $11,506.00 $207,100.00 $0.00 $230,111.00 Site preparation, grading, drainage, and approach clearing for a new 3,200' runway.
02-013 PHH $14,000.00 $14,000.00 $0.00 $0.00 $28,000.00 Install non-directional beacon (NDB).
02-011 MNI $16,716.70 $16,716.70 $300,901.00 $0.00 $334,334.40 Installation of medium intensity runway and taxiway lighting system, install precision approach path indicators (PAPI's) and update the airport layout plan
02-010 UZA $21,500.00 $21,500.00 $0.00 $0.00 $43,000.00 Install security fencing and automated security gate.
02-009 HVS $41,000.00 $0.00 $0.00 $0.00 $41,000.00 Install a 100LL aviation fuel facility.
02-008 EOE $15,500.00 $15,500.00 $279,000.00 $0.00 $310,000.00 Rehabilitate runway 4/22 with an asphalt overlay.