South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
01-001 UZA $26,106.00 $26,106.00 $150,000.00 $0.00 $202,212.00 Rehabilitate taxiway "J' pavement and edge lights, including storm drainage improvements.
00-022 AND $12,450.00 $12,450.00 $224,100.00 $0.00 $249,000.00 Rehabilitate taxiway lighting system.
00-021 AND $12,000.00 $4,000.00 $0.00 $0.00 $16,000.00 Crack seal asphalt pavements of runway 5/23 and the connecting taxiways.
00-019 35A $500,000.00 $0.00 $0.00 $0.00 $500,000.00 Construct two 10-unit t-hangars and connecting taxilanes.
00-018A GMU $1,689.00 $1,689.00 $30,402.00 $0.00 $33,780.00 Grant amendment to cover cost overruns for the installation of MALSF on runway 1 and REILS on runway 19.
00-018 GMU $27,425.00 $27,426.00 $493,655.00 $0.00 $548,506.00 Install a medium intensity approach lighting system with flashers (MALSF) on runway 1 and runway end identifier lights (REILS) on runway 19.
00-017 FLO $33,828.00 $33,828.00 $608,899.00 $0.00 $676,555.00 Runway 9 safety area improvements including design for relocating McCall Blvd., design services for overlaying and marking runway 9/27, Phase I rehabilitate and light taxiway E, relocate runway 19 security fence, and updating the airport layout plan.
00-016 SMS $18,361.00 $18,361.00 $330,489.00 $0.00 $367,211.00 Airfield lighting project (Replace edge lighting on taxiways and runway. Install precision approach path indicator lights (PAPI), runway end identifier lights (REILS), and apron lighting.
00-015 MKS $44,703.00 $44,703.00 $804,661.00 $0.00 $894,067.00 Rehabilitate and expand aircraft parking apron, including an asphalt overlay of the stub taxiway.
00-014 MAO $54,375.00 $18,125.00 $0.00 $0.00 $72,500.00 Rejuvenation of airfield asphalt pavement and painting.
00-013 HVS $5,775.00 $5,775.00 $103,950.00 $0.00 $115,500.00 Prepare plans and specifications for a partial parallel taxiway extension, including rehabilitation of existing apron, and determining property acquisition needs for clearing runway 21 approach per FAA Part 77.
00-012 LUX $0.00 $22,939.00 $0.00 $0.00 $0.00 Collect inventory data, update aviation activity forecast, analysis demand capacity and facility requirements, review alternatives and implementation plan development. Data will be summarized in a brief narrative report.
00-011 RBW $8,062.50 $2,687.50 $0.00 $0.00 $10,750.00 Rewiring electrical power supply to existing ODAL system on runway 23.
00-010 HVS $45,000.00 $45,000.00 $0.00 $0.00 $90,000.00 Purchase and install an automated weather observation station (AWOS III) system.
00-009 AND $46,266.30 $15,422.10 $0.00 $0.00 $61,688.40 Obstruction removal, grade hill off end of runway 5.
00-008 BNL $31,800.00 $10,600.00 $0.00 $0.00 $42,400.00 Clearing of trees, shrubs, and stumps in the runway protection zones (RPZ) including the areas along side of Runway 16/34 to meet FAR Part 77. Also, seeding the cleared areas for erosion control and enable the owner to maintain it with mowing equipment.
00-007 ARW $12,144.00 $12,144.00 $138,200.00 $0.00 $162,488.00 Replace airfield lighting system and install runway end identifier lights (REILS) on end of runway 24.
00-006A GYH $5,175.00 $1,725.00 $0.00 $0.00 $6,900.00 Change Order - Outline taxiway "A" markings with a black 6" border.
00-006 GYH $51,217.50 $17,072.50 $0.00 $0.00 $68,290.00 Re-mark runway 5/23 and partial parallel taxiway A including taxiway A connectors.
00-005 FLO $46,037.62 $15,345.88 $0.00 $0.00 $61,383.50 Re-mark and crack seal runway 1/19, taxiway B, D, F, H, and the terminal apron.