01-001 |
UZA |
$26,106.00 |
$26,106.00 |
$150,000.00 |
$0.00 |
$202,212.00 |
Rehabilitate taxiway "J' pavement and edge lights, including storm drainage improvements. |
00-022 |
AND |
$12,450.00 |
$12,450.00 |
$224,100.00 |
$0.00 |
$249,000.00 |
Rehabilitate taxiway lighting system. |
00-021 |
AND |
$12,000.00 |
$4,000.00 |
$0.00 |
$0.00 |
$16,000.00 |
Crack seal asphalt pavements of runway 5/23 and the connecting taxiways. |
00-019 |
35A |
$500,000.00 |
$0.00 |
$0.00 |
$0.00 |
$500,000.00 |
Construct two 10-unit t-hangars and connecting taxilanes. |
00-018A |
GMU |
$1,689.00 |
$1,689.00 |
$30,402.00 |
$0.00 |
$33,780.00 |
Grant amendment to cover cost overruns for the installation of MALSF on runway 1 and REILS on runway 19. |
00-018 |
GMU |
$27,425.00 |
$27,426.00 |
$493,655.00 |
$0.00 |
$548,506.00 |
Install a medium intensity approach lighting system with flashers (MALSF) on runway 1 and runway end identifier lights (REILS) on runway 19. |
00-017 |
FLO |
$33,828.00 |
$33,828.00 |
$608,899.00 |
$0.00 |
$676,555.00 |
Runway 9 safety area improvements including design for relocating McCall Blvd., design services for overlaying and marking runway 9/27, Phase I rehabilitate and light taxiway E, relocate runway 19 security fence, and updating the airport layout plan. |
00-016 |
SMS |
$18,361.00 |
$18,361.00 |
$330,489.00 |
$0.00 |
$367,211.00 |
Airfield lighting project (Replace edge lighting on taxiways and runway. Install precision approach path indicator lights (PAPI), runway end identifier lights (REILS), and apron lighting. |
00-015 |
MKS |
$44,703.00 |
$44,703.00 |
$804,661.00 |
$0.00 |
$894,067.00 |
Rehabilitate and expand aircraft parking apron, including an asphalt overlay of the stub taxiway. |
00-014 |
MAO |
$54,375.00 |
$18,125.00 |
$0.00 |
$0.00 |
$72,500.00 |
Rejuvenation of airfield asphalt pavement and painting. |
00-013 |
HVS |
$5,775.00 |
$5,775.00 |
$103,950.00 |
$0.00 |
$115,500.00 |
Prepare plans and specifications for a partial parallel taxiway extension, including rehabilitation of existing apron, and determining property acquisition needs for clearing runway 21 approach per FAA Part 77. |
00-012 |
LUX |
$0.00 |
$22,939.00 |
$0.00 |
$0.00 |
$0.00 |
Collect inventory data, update aviation activity forecast, analysis demand capacity and facility requirements, review alternatives and implementation plan development. Data will be summarized in a brief narrative report. |
00-011 |
RBW |
$8,062.50 |
$2,687.50 |
$0.00 |
$0.00 |
$10,750.00 |
Rewiring electrical power supply to existing ODAL system on runway 23. |
00-010 |
HVS |
$45,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
$90,000.00 |
Purchase and install an automated weather observation station (AWOS III) system. |
00-009 |
AND |
$46,266.30 |
$15,422.10 |
$0.00 |
$0.00 |
$61,688.40 |
Obstruction removal, grade hill off end of runway 5. |
00-008 |
BNL |
$31,800.00 |
$10,600.00 |
$0.00 |
$0.00 |
$42,400.00 |
Clearing of trees, shrubs, and stumps in the runway protection zones (RPZ) including the areas along side of Runway 16/34 to meet FAR Part 77. Also, seeding the cleared areas for erosion control and enable the owner to maintain it with mowing equipment. |
00-007 |
ARW |
$12,144.00 |
$12,144.00 |
$138,200.00 |
$0.00 |
$162,488.00 |
Replace airfield lighting system and install runway end identifier lights (REILS) on end of runway 24. |
00-006A |
GYH |
$5,175.00 |
$1,725.00 |
$0.00 |
$0.00 |
$6,900.00 |
Change Order - Outline taxiway "A" markings with a black 6" border. |
00-006 |
GYH |
$51,217.50 |
$17,072.50 |
$0.00 |
$0.00 |
$68,290.00 |
Re-mark runway 5/23 and partial parallel taxiway A including taxiway A connectors. |
00-005 |
FLO |
$46,037.62 |
$15,345.88 |
$0.00 |
$0.00 |
$61,383.50 |
Re-mark and crack seal runway 1/19, taxiway B, D, F, H, and the terminal apron. |