00-017 |
FLO |
$33,828.00 |
$33,828.00 |
$608,899.00 |
$0.00 |
$676,555.00 |
Runway 9 safety area improvements including design for relocating McCall Blvd., design services for overlaying and marking runway 9/27, Phase I rehabilitate and light taxiway E, relocate runway 19 security fence, and updating the airport layout plan. |
00-016 |
SMS |
$18,361.00 |
$18,361.00 |
$330,489.00 |
$0.00 |
$367,211.00 |
Airfield lighting project (Replace edge lighting on taxiways and runway. Install precision approach path indicator lights (PAPI), runway end identifier lights (REILS), and apron lighting. |
00-015 |
MKS |
$44,703.00 |
$44,703.00 |
$804,661.00 |
$0.00 |
$894,067.00 |
Rehabilitate and expand aircraft parking apron, including an asphalt overlay of the stub taxiway. |
00-014 |
MAO |
$54,375.00 |
$18,125.00 |
$0.00 |
$0.00 |
$72,500.00 |
Rejuvenation of airfield asphalt pavement and painting. |
00-013 |
HVS |
$5,775.00 |
$5,775.00 |
$103,950.00 |
$0.00 |
$115,500.00 |
Prepare plans and specifications for a partial parallel taxiway extension, including rehabilitation of existing apron, and determining property acquisition needs for clearing runway 21 approach per FAA Part 77. |
00-012 |
LUX |
$0.00 |
$22,939.00 |
$0.00 |
$0.00 |
$0.00 |
Collect inventory data, update aviation activity forecast, analysis demand capacity and facility requirements, review alternatives and implementation plan development. Data will be summarized in a brief narrative report. |
00-011 |
RBW |
$8,062.50 |
$2,687.50 |
$0.00 |
$0.00 |
$10,750.00 |
Rewiring electrical power supply to existing ODAL system on runway 23. |
00-010 |
HVS |
$45,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
$90,000.00 |
Purchase and install an automated weather observation station (AWOS III) system. |
00-009 |
AND |
$46,266.30 |
$15,422.10 |
$0.00 |
$0.00 |
$61,688.40 |
Obstruction removal, grade hill off end of runway 5. |
00-008 |
BNL |
$31,800.00 |
$10,600.00 |
$0.00 |
$0.00 |
$42,400.00 |
Clearing of trees, shrubs, and stumps in the runway protection zones (RPZ) including the areas along side of Runway 16/34 to meet FAR Part 77. Also, seeding the cleared areas for erosion control and enable the owner to maintain it with mowing equipment. |
00-007 |
ARW |
$12,144.00 |
$12,144.00 |
$138,200.00 |
$0.00 |
$162,488.00 |
Replace airfield lighting system and install runway end identifier lights (REILS) on end of runway 24. |
00-006A |
GYH |
$5,175.00 |
$1,725.00 |
$0.00 |
$0.00 |
$6,900.00 |
Change Order - Outline taxiway "A" markings with a black 6" border. |
00-006 |
GYH |
$51,217.50 |
$17,072.50 |
$0.00 |
$0.00 |
$68,290.00 |
Re-mark runway 5/23 and partial parallel taxiway A including taxiway A connectors. |
00-005 |
FLO |
$46,037.62 |
$15,345.88 |
$0.00 |
$0.00 |
$61,383.50 |
Re-mark and crack seal runway 1/19, taxiway B, D, F, H, and the terminal apron. |
00-004 |
CEU |
$26,347.00 |
$26,347.00 |
$0.00 |
$0.00 |
$52,694.00 |
Construct stone base and asphalt surface coarse, pavement markings, and permanent grassing for hangar taxi lanes including associated engineering and professional cost affiliated with paving of the taxilanes serving 14 hangar units. |
00-003 |
ARW |
$6,250.00 |
$6,250.00 |
$0.00 |
$0.00 |
$12,500.00 |
Update the airport layout plan |
00-002 |
GYH |
$48,843.00 |
$48,842.00 |
$879,165.00 |
$0.00 |
$976,850.00 |
Installation of high intensity runway edge lights (HIRLS) and approach lighting system including rail lights (MALSR). Updating the airport master plan. |
00-001 |
LQK |
$56,000.00 |
$56,000.00 |
$0.00 |
$0.00 |
$112,000.00 |
Installation of an automated weather observation station (AWOS III) and associated equipment, including engineering design. |
99-023 |
CUB |
$18,788.00 |
$18,788.00 |
$338,184.00 |
$0.00 |
$375,760.00 |
Installation of new medium intensity runway and taxiway lighting system, precision approach path indicator lights (PAPI'S), and construct new electrical vault. |
99-022 |
AIK |
$200,000.00 |
$960,000.00 |
$0.00 |
$0.00 |
$1,160,000.00 |
Construct new terminal building addition. |