Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
99-009 DYB $5,936.00 $5,936.00 $25,000.00 $0.00 $36,872.00 To perform planning services consisting of updating the existing master plan and airport layout plan.
99-008AA SPA $1,039.02 $1,039.02 $18,702.36 $0.00 $20,780.40 Grant amendment for project cost increase for the installation of high intensity runway edge lights.
99-008A SPA $2,580.00 $2,580.00 $0.00 $0.00 $5,160.00 Installation of lighted distance-to-go signs.
99-008 SPA $17,202.00 $17,203.00 $309,636.00 $0.00 $344,041.00 Improve runway 5/23 by removing paved shoulders, install high intensity runway lights (HIRLS), segmented circle, and wind cone.
99-006 AND $50,000.00 $50,174.00 $574,200.00 $0.00 $674,374.00 Rehabilitate portions of taxiway B and C including the apron. Construct t-hangar taxilanes and install medium intensity taxiway lights on taxiway C.
99-005 BNL $64,235.00 $64,235.00 $0.00 $0.00 $128,470.00 Install a omni-directional approach lighting system (ODALS) on the end of runway 16 and including the installation of precision approach path indicator lights on both ends of runway 16/34.
99-004 SPA $13,750.00 $13,750.00 $0.00 $0.00 $27,500.00 Update the airport layout plan.
99-003 GGE $27,440.00 $27,441.00 $0.00 $0.00 $54,881.00 Drainage system improvements.
99-002 RBW $22,691.92 $7,563.97 $54,375.11 $0.00 $84,631.00 Clean and reseal the concrete joints with a silicone joint filler of the terminal aircraft parking apron.
99-001A AIK $51,967.00 $51,967.00 $61,560.00 $0.00 $165,494.00 Runway 6/24 paved shoulder removal and drainage rehabilitation project.
99-001 AIK $22,800.00 $22,800.00 $410,400.00 $0.00 $456,000.00 Rehabilitate and upgrade runway 6/24 medium intensity runway lights, precision approach path indicator lights, omni-directional approach lights, new lighting vault, and recabling the existing taxiway lights.
98-020 OGB $126,451.00 $126,451.00 $2,276,120.00 $0.00 $2,529,022.00 Runway 17/35 paving and lighting project
98-019 BBP $291,000.00 $291,000.00 $250,000.00 $0.00 $832,000.00 Design and rehabilitate runway 6/24 and the connecting taxiways.
98-018 UDG $37,721.00 $37,721.00 $0.00 $0.00 $75,442.00 Construct taxiways to t-hangars.
98-017 LKR $103,045.00 $103,045.00 $1,854,813.00 $0.00 $2,060,903.00 Complete the parallel taxiway for runway 6/24. Stage II will consist of constructing a 3700' x 35' taxiway including medium intensity taxiway lights.
98-016A 6J4 $7,125.00 $2,375.00 $0.00 $0.00 $9,500.00 Rout, clean, and seal all asphalt cracks on runway 1/19 with a rubberized sealant. Reseal existing cracks and grade runway shoulders.
98-015 DYB $40,000.00 $40,000.00 $0.00 $0.00 $80,000.00 Installation of an automated weather observation station (AWOS III).
98-014A CQW $33,525.01 $11,175.01 $0.00 $0.00 $44,700.03 Seal coat/rejuvenate 4400' x 75' of runway 7/25 including the taxiway turnaround. Repaint runway and taxiway markings.
98-013A RBW $16,497.00 $16,498.00 $296,953.00 $0.00 $329,948.00 Overlaying the bituminous portion of the terminal aircraft parking apron and two connecting taxiways, including updating the airport layout plan and exhibit "A" property plat.
98-012 MNI $140,000.00 $207,015.50 $0.00 $0.00 $347,015.50 Apron renovations and expansion, including a t-hangar taxiway.