99-009 |
DYB |
$5,936.00 |
$5,936.00 |
$25,000.00 |
$0.00 |
$36,872.00 |
To perform planning services consisting of updating the existing master plan and airport layout plan. |
99-008AA |
SPA |
$1,039.02 |
$1,039.02 |
$18,702.36 |
$0.00 |
$20,780.40 |
Grant amendment for project cost increase for the installation of high intensity runway edge lights. |
99-008A |
SPA |
$2,580.00 |
$2,580.00 |
$0.00 |
$0.00 |
$5,160.00 |
Installation of lighted distance-to-go signs. |
99-008 |
SPA |
$17,202.00 |
$17,203.00 |
$309,636.00 |
$0.00 |
$344,041.00 |
Improve runway 5/23 by removing paved shoulders, install high intensity runway lights (HIRLS), segmented circle, and wind cone. |
99-006 |
AND |
$50,000.00 |
$50,174.00 |
$574,200.00 |
$0.00 |
$674,374.00 |
Rehabilitate portions of taxiway B and C including the apron. Construct t-hangar taxilanes and install medium intensity taxiway lights on taxiway C. |
99-005 |
BNL |
$64,235.00 |
$64,235.00 |
$0.00 |
$0.00 |
$128,470.00 |
Install a omni-directional approach lighting system (ODALS) on the end of runway 16 and including the installation of precision approach path indicator lights on both ends of runway 16/34. |
99-004 |
SPA |
$13,750.00 |
$13,750.00 |
$0.00 |
$0.00 |
$27,500.00 |
Update the airport layout plan. |
99-003 |
GGE |
$27,440.00 |
$27,441.00 |
$0.00 |
$0.00 |
$54,881.00 |
Drainage system improvements. |
99-002 |
RBW |
$22,691.92 |
$7,563.97 |
$54,375.11 |
$0.00 |
$84,631.00 |
Clean and reseal the concrete joints with a silicone joint filler of the terminal aircraft parking apron. |
99-001A |
AIK |
$51,967.00 |
$51,967.00 |
$61,560.00 |
$0.00 |
$165,494.00 |
Runway 6/24 paved shoulder removal and drainage rehabilitation project. |
99-001 |
AIK |
$22,800.00 |
$22,800.00 |
$410,400.00 |
$0.00 |
$456,000.00 |
Rehabilitate and upgrade runway 6/24 medium intensity runway lights, precision approach path indicator lights, omni-directional approach lights, new lighting vault, and recabling the existing taxiway lights. |
98-020 |
OGB |
$126,451.00 |
$126,451.00 |
$2,276,120.00 |
$0.00 |
$2,529,022.00 |
Runway 17/35 paving and lighting project |
98-019 |
BBP |
$291,000.00 |
$291,000.00 |
$250,000.00 |
$0.00 |
$832,000.00 |
Design and rehabilitate runway 6/24 and the connecting taxiways. |
98-018 |
UDG |
$37,721.00 |
$37,721.00 |
$0.00 |
$0.00 |
$75,442.00 |
Construct taxiways to t-hangars. |
98-017 |
LKR |
$103,045.00 |
$103,045.00 |
$1,854,813.00 |
$0.00 |
$2,060,903.00 |
Complete the parallel taxiway for runway 6/24. Stage II will consist of constructing a 3700' x 35' taxiway including medium intensity taxiway lights. |
98-016A |
6J4 |
$7,125.00 |
$2,375.00 |
$0.00 |
$0.00 |
$9,500.00 |
Rout, clean, and seal all asphalt cracks on runway 1/19 with a rubberized sealant. Reseal existing cracks and grade runway shoulders. |
98-015 |
DYB |
$40,000.00 |
$40,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Installation of an automated weather observation station (AWOS III). |
98-014A |
CQW |
$33,525.01 |
$11,175.01 |
$0.00 |
$0.00 |
$44,700.03 |
Seal coat/rejuvenate 4400' x 75' of runway 7/25 including the taxiway turnaround. Repaint runway and taxiway markings. |
98-013A |
RBW |
$16,497.00 |
$16,498.00 |
$296,953.00 |
$0.00 |
$329,948.00 |
Overlaying the bituminous portion of the terminal aircraft parking apron and two connecting taxiways, including updating the airport layout plan and exhibit "A" property plat. |
98-012 |
MNI |
$140,000.00 |
$207,015.50 |
$0.00 |
$0.00 |
$347,015.50 |
Apron renovations and expansion, including a t-hangar taxiway. |