99-021 |
CEU |
$13,356.50 |
$13,356.50 |
$240,417.00 |
$0.00 |
$267,130.00 |
(1) Preparation of plans and specifications through bidding for runway 7/25 overlay, widening, and extension; apron rehabilitation and overlay; and runway safety area improvements. (2) Cemetery analysis and relocation plan (3) Preliminary engineering for |
99-020 |
CEU |
$20,959.09 |
$20,959.09 |
$377,263.80 |
$0.00 |
$419,182.00 |
Relocate Cemetery in Runway 7 Safety Area |
99-019 |
GYH |
$262,500.00 |
$87,500.00 |
$0.00 |
$0.00 |
$350,000.00 |
Runway 5/23 concrete joint sealing and asphalt rehabilitation. |
99-018 |
LQK |
$61,208.00 |
$77,100.00 |
$1,244,759.00 |
$0.00 |
$1,383,067.00 |
Land surveying and appraisal fees; engineering design and construction of the partial parallel taxiway. |
99-017 |
UDG |
$8,431.00 |
$8,431.00 |
$0.00 |
$0.00 |
$16,862.00 |
Install 3,200' of 6' high and 1,000' of 4' high chain link fence. Install three 24' wide 6' high double gates and one 24' wide 4' high double gate. |
99-016 |
AIK |
$27,000.00 |
$9,000.00 |
$0.00 |
$0.00 |
$36,000.00 |
Rout, clean, sterilize, and crack seal runway 6/24 and connecting taxiways. |
99-015A |
LKR |
$1,945.00 |
$1,945.00 |
$0.00 |
$0.00 |
$3,890.00 |
Amend 99-015 grant for replacing the non-directional beacon by adding a SA25 AC Single Transmitter. |
99-015 |
LKR |
$4,800.00 |
$4,800.00 |
$0.00 |
$0.00 |
$9,600.00 |
Replace Non-directional beacon. |
99-014 |
CUB |
$3,835.00 |
$3,835.00 |
$69,024.00 |
$0.00 |
$76,694.00 |
(Phase I) Engineering design services for rehabilitating the airfield lighting system. |
99-013 |
GMU |
$350,000.00 |
$350,000.00 |
$0.00 |
$0.00 |
$700,000.00 |
Overlay runway 10/28 and rehabilitate portions of the south aircraft parking apron. |
99-012 |
35A |
$25,920.00 |
$25,920.00 |
$0.00 |
$0.00 |
$51,840.00 |
Update the airport layout plan, aerial topographic mapping, survey control points, and a boundary property plat. |
99-011 |
CRE |
$7,100.00 |
$7,100.00 |
$127,800.00 |
$0.00 |
$142,000.00 |
Prepare airport layout plan updates for Grand Strand Airport and Conway-Horry County Airport, including updating the Horry County general aviation system plan. |
99-010A |
SPA |
$3,360.00 |
$1,120.00 |
$0.00 |
$0.00 |
$4,480.00 |
Crack seal associated taxiways to runway 5/23. |
99-010 |
SPA |
$18,750.00 |
$6,250.00 |
$0.00 |
$0.00 |
$25,000.00 |
Crack seal runway 5/23 and the associated connecting taxiways |
99-009 |
DYB |
$5,936.00 |
$5,936.00 |
$25,000.00 |
$0.00 |
$36,872.00 |
To perform planning services consisting of updating the existing master plan and airport layout plan. |
99-008AA |
SPA |
$1,039.02 |
$1,039.02 |
$18,702.36 |
$0.00 |
$20,780.40 |
Grant amendment for project cost increase for the installation of high intensity runway edge lights. |
99-008A |
SPA |
$2,580.00 |
$2,580.00 |
$0.00 |
$0.00 |
$5,160.00 |
Installation of lighted distance-to-go signs. |
99-008 |
SPA |
$17,202.00 |
$17,203.00 |
$309,636.00 |
$0.00 |
$344,041.00 |
Improve runway 5/23 by removing paved shoulders, install high intensity runway lights (HIRLS), segmented circle, and wind cone. |
99-006 |
AND |
$50,000.00 |
$50,174.00 |
$574,200.00 |
$0.00 |
$674,374.00 |
Rehabilitate portions of taxiway B and C including the apron. Construct t-hangar taxilanes and install medium intensity taxiway lights on taxiway C. |
99-005 |
BNL |
$64,235.00 |
$64,235.00 |
$0.00 |
$0.00 |
$128,470.00 |
Install a omni-directional approach lighting system (ODALS) on the end of runway 16 and including the installation of precision approach path indicator lights on both ends of runway 16/34. |