Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
99-004 SPA $13,750.00 $13,750.00 $0.00 $0.00 $27,500.00 Update the airport layout plan.
99-003 GGE $27,440.00 $27,441.00 $0.00 $0.00 $54,881.00 Drainage system improvements.
99-002 RBW $22,691.92 $7,563.97 $54,375.11 $0.00 $84,631.00 Clean and reseal the concrete joints with a silicone joint filler of the terminal aircraft parking apron.
99-001A AIK $51,967.00 $51,967.00 $61,560.00 $0.00 $165,494.00 Runway 6/24 paved shoulder removal and drainage rehabilitation project.
99-001 AIK $22,800.00 $22,800.00 $410,400.00 $0.00 $456,000.00 Rehabilitate and upgrade runway 6/24 medium intensity runway lights, precision approach path indicator lights, omni-directional approach lights, new lighting vault, and recabling the existing taxiway lights.
98-020 OGB $126,451.00 $126,451.00 $2,276,120.00 $0.00 $2,529,022.00 Runway 17/35 paving and lighting project
98-019 BBP $291,000.00 $291,000.00 $250,000.00 $0.00 $832,000.00 Design and rehabilitate runway 6/24 and the connecting taxiways.
98-018 UDG $37,721.00 $37,721.00 $0.00 $0.00 $75,442.00 Construct taxiways to t-hangars.
98-017 LKR $103,045.00 $103,045.00 $1,854,813.00 $0.00 $2,060,903.00 Complete the parallel taxiway for runway 6/24. Stage II will consist of constructing a 3700' x 35' taxiway including medium intensity taxiway lights.
98-016A 6J4 $7,125.00 $2,375.00 $0.00 $0.00 $9,500.00 Rout, clean, and seal all asphalt cracks on runway 1/19 with a rubberized sealant. Reseal existing cracks and grade runway shoulders.
98-015 DYB $40,000.00 $40,000.00 $0.00 $0.00 $80,000.00 Installation of an automated weather observation station (AWOS III).
98-014A CQW $33,525.01 $11,175.01 $0.00 $0.00 $44,700.03 Seal coat/rejuvenate 4400' x 75' of runway 7/25 including the taxiway turnaround. Repaint runway and taxiway markings.
98-013A RBW $16,497.00 $16,498.00 $296,953.00 $0.00 $329,948.00 Overlaying the bituminous portion of the terminal aircraft parking apron and two connecting taxiways, including updating the airport layout plan and exhibit "A" property plat.
98-012 MNI $140,000.00 $207,015.50 $0.00 $0.00 $347,015.50 Apron renovations and expansion, including a t-hangar taxiway.
98-011 AND $11,500.00 $11,500.00 $0.00 $0.00 $23,000.00 Update the airport layout plan
98-010 CEU $67,142.39 $73,505.89 $1,265,834.70 $0.00 $1,406,483.00 Design and construction of a parallel taxiway including medium intensity taxiway lights and associated land acquisition cost.
98-009 DCM $14,800.00 $14,800.00 $0.00 $0.00 $29,600.00 GRANT AMENDMENT - CHANGE ORDER - Additional stone base coarse for reconstructing the apron and parallel taxiway.
98-008 AIK $41,000.00 $41,000.00 $0.00 $0.00 $82,000.00 Installation of an automated weather observation system (AWOS III).
98-007 UZA $46,000.00 $46,000.00 $0.00 $0.00 $92,000.00 Install approximately 10,000 feet of perimeter fencing.
98-006A CDN $44,250.00 $14,750.00 $0.00 $0.00 $59,000.00 Resurface existing terminal apron, approximately 10,000 SY.