98-011 |
AND |
$11,500.00 |
$11,500.00 |
$0.00 |
$0.00 |
$23,000.00 |
Update the airport layout plan |
98-010 |
CEU |
$67,142.39 |
$73,505.89 |
$1,265,834.70 |
$0.00 |
$1,406,483.00 |
Design and construction of a parallel taxiway including medium intensity taxiway lights and associated land acquisition cost. |
98-009 |
DCM |
$14,800.00 |
$14,800.00 |
$0.00 |
$0.00 |
$29,600.00 |
GRANT AMENDMENT - CHANGE ORDER - Additional stone base coarse for reconstructing the apron and parallel taxiway. |
98-008 |
AIK |
$41,000.00 |
$41,000.00 |
$0.00 |
$0.00 |
$82,000.00 |
Installation of an automated weather observation system (AWOS III). |
98-007 |
UZA |
$46,000.00 |
$46,000.00 |
$0.00 |
$0.00 |
$92,000.00 |
Install approximately 10,000 feet of perimeter fencing. |
98-006A |
CDN |
$44,250.00 |
$14,750.00 |
$0.00 |
$0.00 |
$59,000.00 |
Resurface existing terminal apron, approximately 10,000 SY. |
98-005 |
UZA |
$43,380.00 |
$43,380.00 |
$780,840.00 |
$0.00 |
$867,600.00 |
Install an instrument landing system (ILS) for runway 02. Project consist of three schedules: Schedule I, Site preparation to prevent electronic destruction. Schedule II, Install additional medium intensity approach lights, lighted threshold bar and relocate PAPIS. Schedule III, - Install glide slope antenna for a full instrument landing system. |
98-004 |
OGB |
$26,496.50 |
$38,913.06 |
$588,687.35 |
$0.00 |
$654,096.91 |
Clearing and stumping of runway 17/35 and parallel taxiway. |
98-003 |
AQX |
$300,000.00 |
$300,000.00 |
$511,906.00 |
$0.00 |
$1,111,906.00 |
Update the airport master plan, rehabilitate runway 17/35, acquire and clear land in the approaches, and improve the runway safety areas. |
98-002 |
AIK |
$52,043.91 |
$71,837.67 |
$0.00 |
$0.00 |
$123,881.58 |
Clearing, grading, and paving of a 400' X 35' stub taxiway including connecting t-hangar taxiways. |
98-001A |
SMS |
$89,561.25 |
$89,561.25 |
$0.00 |
$0.00 |
$179,122.50 |
Installation of an automated weather observation station (AWOS III) system and a omni-directional approach lighting system for runway 23. |
97-009 |
GGE |
$40,622.00 |
$40,623.00 |
$0.00 |
$0.00 |
$81,245.00 |
Install precision approach path indicator lights (PAPIS) for runway 5/23, VHF transmitter for a automated weather observation station (AWOS), and a clearance delivery system to the Myrtle Beach tower. |
97-008 |
UDG |
$48,075.47 |
$52,128.09 |
$901,832.04 |
$0.00 |
$1,002,035.60 |
Runway 5/23 rehabilitation and widening project including omni-directional approach lights (ODALS) for runway 5. |
97-007 |
SPA |
$7,500.00 |
$7,500.00 |
$0.00 |
$0.00 |
$15,000.00 |
Preliminary design development relative to the construction of a general aviation terminal building. |
97-006 |
SPA |
$13,722.50 |
$13,722.50 |
$0.00 |
$0.00 |
$27,445.00 |
Upgrade the automated weather observation system (AWOS) to include thunderstorm and precipitation detection. |
97-005 |
DCM |
$10,418.26 |
$10,418.26 |
$187,528.72 |
$0.00 |
$208,365.24 |
Installation of medium intensity runway and taxiway lighting, taxiway signage, rotating beacon and tower, and precision approach path indicator lights (PAPIS). |
97-004 |
OGB |
$153,925.50 |
$153,925.50 |
$2,770,654.00 |
$0.00 |
$3,078,505.00 |
Site preparation for runway 17/35 and parallel taxiway |
97-002 |
GMU |
$29,661.17 |
$29,661.18 |
$533,901.15 |
$0.00 |
$593,223.50 |
Extend partial parallel taxiway B (35' x 1,000), rehabilitate taxiway H, and update the airport layout plan |
97-001 |
AQX |
$22,825.00 |
$37,793.00 |
$0.00 |
$0.00 |
$60,618.00 |
Construct taxiways to T-hangars. |
96-014 |
MKS |
$10,090.00 |
$10,091.00 |
$181,632.00 |
$0.00 |
$201,813.00 |
Airfield lighting rehabilitation project. |