Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
98-011 AND $11,500.00 $11,500.00 $0.00 $0.00 $23,000.00 Update the airport layout plan
98-010 CEU $67,142.39 $73,505.89 $1,265,834.70 $0.00 $1,406,483.00 Design and construction of a parallel taxiway including medium intensity taxiway lights and associated land acquisition cost.
98-009 DCM $14,800.00 $14,800.00 $0.00 $0.00 $29,600.00 GRANT AMENDMENT - CHANGE ORDER - Additional stone base coarse for reconstructing the apron and parallel taxiway.
98-008 AIK $41,000.00 $41,000.00 $0.00 $0.00 $82,000.00 Installation of an automated weather observation system (AWOS III).
98-007 UZA $46,000.00 $46,000.00 $0.00 $0.00 $92,000.00 Install approximately 10,000 feet of perimeter fencing.
98-006A CDN $44,250.00 $14,750.00 $0.00 $0.00 $59,000.00 Resurface existing terminal apron, approximately 10,000 SY.
98-005 UZA $43,380.00 $43,380.00 $780,840.00 $0.00 $867,600.00 Install an instrument landing system (ILS) for runway 02. Project consist of three schedules: Schedule I, Site preparation to prevent electronic destruction. Schedule II, Install additional medium intensity approach lights, lighted threshold bar and relocate PAPIS. Schedule III, - Install glide slope antenna for a full instrument landing system.
98-004 OGB $26,496.50 $38,913.06 $588,687.35 $0.00 $654,096.91 Clearing and stumping of runway 17/35 and parallel taxiway.
98-003 AQX $300,000.00 $300,000.00 $511,906.00 $0.00 $1,111,906.00 Update the airport master plan, rehabilitate runway 17/35, acquire and clear land in the approaches, and improve the runway safety areas.
98-002 AIK $52,043.91 $71,837.67 $0.00 $0.00 $123,881.58 Clearing, grading, and paving of a 400' X 35' stub taxiway including connecting t-hangar taxiways.
98-001A SMS $89,561.25 $89,561.25 $0.00 $0.00 $179,122.50 Installation of an automated weather observation station (AWOS III) system and a omni-directional approach lighting system for runway 23.
97-009 GGE $40,622.00 $40,623.00 $0.00 $0.00 $81,245.00 Install precision approach path indicator lights (PAPIS) for runway 5/23, VHF transmitter for a automated weather observation station (AWOS), and a clearance delivery system to the Myrtle Beach tower.
97-008 UDG $48,075.47 $52,128.09 $901,832.04 $0.00 $1,002,035.60 Runway 5/23 rehabilitation and widening project including omni-directional approach lights (ODALS) for runway 5.
97-007 SPA $7,500.00 $7,500.00 $0.00 $0.00 $15,000.00 Preliminary design development relative to the construction of a general aviation terminal building.
97-006 SPA $13,722.50 $13,722.50 $0.00 $0.00 $27,445.00 Upgrade the automated weather observation system (AWOS) to include thunderstorm and precipitation detection.
97-005 DCM $10,418.26 $10,418.26 $187,528.72 $0.00 $208,365.24 Installation of medium intensity runway and taxiway lighting, taxiway signage, rotating beacon and tower, and precision approach path indicator lights (PAPIS).
97-004 OGB $153,925.50 $153,925.50 $2,770,654.00 $0.00 $3,078,505.00 Site preparation for runway 17/35 and parallel taxiway
97-002 GMU $29,661.17 $29,661.18 $533,901.15 $0.00 $593,223.50 Extend partial parallel taxiway B (35' x 1,000), rehabilitate taxiway H, and update the airport layout plan
97-001 AQX $22,825.00 $37,793.00 $0.00 $0.00 $60,618.00 Construct taxiways to T-hangars.
96-014 MKS $10,090.00 $10,091.00 $181,632.00 $0.00 $201,813.00 Airfield lighting rehabilitation project.