Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
96-007 GMU $55,901.94 $55,901.94 $0.00 $0.00 $111,803.88 Reconstruction of a portion of taxiway G, including relocation of the medium intensity taxiway lights.
96-006 AQX $5,000.00 $5,000.00 $0.00 $0.00 $10,000.00 Tree obstruction removal on airport property
96-005 RBW $42,400.00 $42,400.00 $0.00 $0.00 $84,800.00 Updating the airport layout plan, including an exhibit " A" property plat.
96-004 GYH $100,000.00 $210,000.00 $990,000.00 $0.00 $1,300,000.00 Rehabilitate 1000'x150' of concrete on the end of runway 5.
96-003 LKR $24,319.00 $24,320.00 $437,753.00 $0.00 $486,392.00 Phase I development for the construction of a partial parallel taxiway. This phase will consist of constructing two temporary sediment ponds and the associated drainage to comply with federal NPDES and state storm water regulations.
96-002 SPA $14,381.50 $14,381.50 $0.00 $0.00 $28,763.00 Construction of a lighted helicopter landing pad.
96-001 HVS $389,727.00 $220,000.00 $0.00 $0.00 $609,727.00 Extend runway 3/21 to 5000' x 75', construct a paved turnaround and install medium intensity edge lights. Installation of precision approach path indicators (PAPIS) and runway end identifier lights (REILS). Obtaining land easements and approach clearing
95-017 OGB $30,495.00 $30,495.00 $548,909.00 $0.00 $609,899.00 Wetland mitigation to offset wetland areas that will be impacted during the construction of runway 17/35.
95-016 DCM $300,000.00 $42,500.00 $0.00 $0.00 $342,500.00 Construct terminal building, rehabilitate the existing apron and portions of the parallel taxiway.
95-015 CKI $856,216.55 $0.00 $400,000.00 $0.00 $1,256,216.55 Reconstructing and overlaying runway 14/32, 4000' x 75' and extending runway 14, 600' x 75'. At completion, runway 14/32 will be 5000' x 75', with medium intensity lighting, serving dual wheel aircraft up to 30,000 lbs.
95-014 UZA $500,000.00 $500,000.00 $0.00 $0.00 $1,000,000.00 Construction of a general aviation terminal building.
95-013 RBW $15,093.59 $15,093.59 $0.00 $0.00 $30,187.18 Removing trees and shrubs in the approach to runway 5.
95-012 OGB $25,770.00 $25,770.00 $463,860.00 $0.00 $515,400.00 Relocate Santee-Cooper electric power transmission line to facilitate the construction of runway 17/35.
95-011 CDN $12,000.00 $15,000.00 $0.00 $0.00 $27,000.00 Crack sealing of airfield pavement areas.
95-010 HYW $35,038.00 $35,039.00 $630,689.00 $0.00 $700,766.00 Rehabilitation and widening of the parallel taxiway to 35', improving the infield drainage by grading and repairing the existing system, and installation of a medium intensity taxiway lighting system.
95-009 DYB $52,333.00 $52,334.00 $942,000.00 $0.00 $1,046,667.00 Construction of a new parallel taxiway to runway 6/24 and installation of a medium intensity lighting system.
95-007 GGE $600,000.00 $157,454.00 $980,386.00 $0.00 $1,737,840.00 Reconstruction of runway 5/23 from station 0+00 to station 50+00 (5000' x 100')
95-006 SC09 $11,210.00 $11,210.00 $0.00 $0.00 $22,420.00 Construction of a hospital helipad.
95-005 OGB $5,993.00 $5,994.00 $107,879.00 $0.00 $119,866.00 Relocate an electrical power transmission line which is owned and operated by the City of Orangeburg Department of Public Utilities. Relocation is required for the construction of runway 17/35.
95-004 SPA $36,700.00 $36,700.00 $0.00 $0.00 $73,400.00 Installation of automated weather observation system (AWOS).