| 96-009 |
DYB |
$20,250.00 |
$20,250.00 |
$0.00 |
$0.00 |
$40,500.00 |
Application of a coal tar sealer/rejuvenator to the aircraft parking apron. |
| 96-008 |
OGB |
$3,966.00 |
$3,967.00 |
$71,393.00 |
$0.00 |
$79,326.00 |
Planting of wetland trees and shrubs as part of the recent construction of Phase I wetland mitigation areas. The creation of this wetland area is due to the construction of runway 17/35. |
| 96-007 |
GMU |
$55,901.94 |
$55,901.94 |
$0.00 |
$0.00 |
$111,803.88 |
Reconstruction of a portion of taxiway G, including relocation of the medium intensity taxiway lights. |
| 96-006 |
AQX |
$5,000.00 |
$5,000.00 |
$0.00 |
$0.00 |
$10,000.00 |
Tree obstruction removal on airport property |
| 96-005 |
RBW |
$42,400.00 |
$42,400.00 |
$0.00 |
$0.00 |
$84,800.00 |
Updating the airport layout plan, including an exhibit " A" property plat. |
| 96-004 |
GYH |
$100,000.00 |
$210,000.00 |
$990,000.00 |
$0.00 |
$1,300,000.00 |
Rehabilitate 1000'x150' of concrete on the end of runway 5. |
| 96-003 |
LKR |
$24,319.00 |
$24,320.00 |
$437,753.00 |
$0.00 |
$486,392.00 |
Phase I development for the construction of a partial parallel taxiway. This phase will consist of constructing two temporary sediment ponds and the associated drainage to comply with federal NPDES and state storm water regulations. |
| 96-002 |
SPA |
$14,381.50 |
$14,381.50 |
$0.00 |
$0.00 |
$28,763.00 |
Construction of a lighted helicopter landing pad. |
| 96-001 |
HVS |
$389,727.00 |
$220,000.00 |
$0.00 |
$0.00 |
$609,727.00 |
Extend runway 3/21 to 5000' x 75', construct a paved turnaround and install medium intensity edge lights. Installation of precision approach path indicators (PAPIS) and runway end identifier lights (REILS). Obtaining land easements and approach clearing |
| 95-017 |
OGB |
$30,495.00 |
$30,495.00 |
$548,909.00 |
$0.00 |
$609,899.00 |
Wetland mitigation to offset wetland areas that will be impacted during the construction of runway 17/35. |
| 95-016 |
DCM |
$300,000.00 |
$42,500.00 |
$0.00 |
$0.00 |
$342,500.00 |
Construct terminal building, rehabilitate the existing apron and portions of the parallel taxiway. |
| 95-015 |
CKI |
$856,216.55 |
$0.00 |
$400,000.00 |
$0.00 |
$1,256,216.55 |
Reconstructing and overlaying runway 14/32, 4000' x 75' and extending runway 14, 600' x 75'. At completion, runway 14/32 will be 5000' x 75', with medium intensity lighting, serving dual wheel aircraft up to 30,000 lbs. |
| 95-014 |
UZA |
$500,000.00 |
$500,000.00 |
$0.00 |
$0.00 |
$1,000,000.00 |
Construction of a general aviation terminal building. |
| 95-013 |
RBW |
$15,093.59 |
$15,093.59 |
$0.00 |
$0.00 |
$30,187.18 |
Removing trees and shrubs in the approach to runway 5. |
| 95-012 |
OGB |
$25,770.00 |
$25,770.00 |
$463,860.00 |
$0.00 |
$515,400.00 |
Relocate Santee-Cooper electric power transmission line to facilitate the construction of runway 17/35. |
| 95-011 |
CDN |
$12,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$27,000.00 |
Crack sealing of airfield pavement areas. |
| 95-010 |
HYW |
$35,038.00 |
$35,039.00 |
$630,689.00 |
$0.00 |
$700,766.00 |
Rehabilitation and widening of the parallel taxiway to 35', improving the infield drainage by grading and repairing the existing system, and installation of a medium intensity taxiway lighting system. |
| 95-009 |
DYB |
$52,333.00 |
$52,334.00 |
$942,000.00 |
$0.00 |
$1,046,667.00 |
Construction of a new parallel taxiway to runway 6/24 and installation of a medium intensity lighting system. |
| 95-007 |
GGE |
$600,000.00 |
$157,454.00 |
$980,386.00 |
$0.00 |
$1,737,840.00 |
Reconstruction of runway 5/23 from station 0+00 to station 50+00 (5000' x 100') |
| 95-006 |
SC09 |
$11,210.00 |
$11,210.00 |
$0.00 |
$0.00 |
$22,420.00 |
Construction of a hospital helipad. |