South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
92-002 6J0 $9,000.00 $35,000.00 $98,864.00 $0.00 $142,864.00 Legal, appraisal, and engineering services associated with fee simple acquisition for future terminal expansion and completed parallel taxiway.
92-001 CDN $9,609.00 $9,609.00 $160,000.00 $0.00 $179,218.00 Rehabilitation of Runway 23, re-stripping runway 5/23 to designate runway 6/24 and remark runway numbers on runway 13/31 to 14/32.
91-029 GMU $141,930.54 $1,199,713.46 $0.00 $0.00 $1,341,644.00 Complete interior and exterior renovation of the terminal building, originally constructed in 1953.
91-028 UZA $65,295.00 $65,295.00 $440,090.00 $0.00 $570,680.00 Obstruction removal and land acquisition fees (legal and engineering) under AIP 3-45-0049-08. Completion of the localizer and non-direction beacon (NDB).
91-027 3J1 $4,443.18 $4,443.18 $0.00 $0.00 $8,886.36 Clearing and grubbing of obstructions located on airfield property. Poisoning of vegetation and fence relocation.
91-026 LUX $83,608.00 $83,608.00 $1,504,949.00 $0.00 $1,672,165.00 Reconstruction and widening of runway 7/25, reconstruction of stub taxiway and apron. Place a 700' embankment for a runway extension and installation of a medium intensity runway lighting system (MIRLS).
91-025 CEU $7,879.00 $29,999.00 $340,902.00 $0.00 $378,780.00 Update the airport master plan. Engineering fees, appraisal fees, and legal services associated with the fee-simple property acquisition of 11 acres on parcels D & F with relocation assistance; and parcels C, D, E, & F also will be required.
91-024 GYH $300,000.00 $300,000.00 $300,000.00 $0.00 $900,000.00 Rehabilitation of the first 1000' of runway 4 concrete pavement.
91-023 CDN $39,038.00 $39,038.00 $702,688.00 $0.00 $780,764.00 Extend runway 5 by 500' to a total runway length of 5000'. Extend the connecting taxiway for a partial parallel taxiway, and rehabilitate a portion of the end of runway 5 end and it's connecting taxiway.
91-022 GRD $200,000.00 $200,000.00 $0.00 $0.00 $400,000.00 Construct new 4000'sf terminal building and demolition of existing building.
91-021 AND $5,072.00 $39,668.00 $402,658.00 $0.00 $447,398.00 Acquire aviation easements to runway 5 approach and obstruction tree removal. Including administration an legal services, and engineering fees associated with the fee simple acquisition.
91-020 GSP $2,116.40 $2,116.40 $38,095.19 $0.00 $42,328.00 The purchase and installation of equipment to meet FAA's PART 107.14 security requirements.
91-019 FLO $17,810.00 $17,810.00 $320,580.00 $0.00 $356,200.00 Overlay the northern portion of taxiway "B", renovate the medium intensity runway lights (MIRL) on runway 18/36, wiring in the electrical vault, and install a new emergency generator.
91-018 LQK $18,760.00 $18,760.00 $187,696.00 $0.00 $225,216.00 Construct taxiway turnaround to runway 22, remark the existing runway and taxiways, and update airport layout plan (ALP).
91-017 CDN $2,800.00 $2,800.00 $0.00 $0.00 $5,600.00 Obstruction (trees) removal at the end of runway 5 and refurbishing the airport beacon tower.
91-016A 35A $4,000.00 $4,000.00 $0.00 $0.00 $8,000.00 Installation of two drain culverts and repair eroded areas along the embankments of the runway.
91-016 35A $10,000.00 $10,000.00 $0.00 $0.00 $20,000.00 Installation of drain culverts and repair eroded areas along the sides of runway 5/23.
91-015 CEU $7,536.00 $7,537.00 $135,652.00 $0.00 $150,725.00 Upgrade the low intensity runway lighting system to a medium intensity lighting system, installation of runway end identifier lights (REILS), recabling the visual approach slope indicator lights (VASI), install a new segmented circle, wind cone.
91-014 FLO $62,190.00 $62,190.00 $0.00 $0.00 $124,380.00 Cleaning, sterilizing, and sealing pavement cracks on runway 9/27
91-013 LQK $12,610.62 $12,610.63 $0.00 $0.00 $25,221.25 Crack seal the runway and taxiways, including cleaning and sterilizing vegetation. Also apply a coal-tar rubberized pitch emulsion seal coat to the existing apron.