90-016 |
GRD |
$8,000.00 |
$8,000.00 |
$0.00 |
$0.00 |
$16,000.00 |
Crack seal the north-south taxiway, and stub taxiway between the storage hangar areas. |
90-015 |
AIK |
$78,757.00 |
$78,757.00 |
$0.00 |
$0.00 |
$157,514.00 |
Slurry seal runway 18/36, access road, and auto parking lot. Coal tar seal coat apron and reconstruct portions of the apron areas. Remark runway 18/36 and associated taxiways. |
90-014 |
LKR |
$2,110.59 |
$2,110.59 |
$37,991.00 |
$0.00 |
$42,212.18 |
Installation of visual approach descent indicators, (PAPI'S). |
90-013 |
AND |
$10,500.00 |
$10,500.00 |
$0.00 |
$0.00 |
$21,000.00 |
Installation of approximately 1,500' of security fencing. |
90-012 |
CEU |
$11,250.00 |
$11,250.00 |
$0.00 |
$0.00 |
$22,500.00 |
Crack seal runway, stub taxiway, and apron areas. |
90-011 |
GMU |
$14,813.00 |
$14,813.00 |
$66,000.00 |
$0.00 |
$95,626.00 |
Construction of two aircraft helipads. |
90-010 |
FDW |
$150,860.00 |
$150,860.00 |
$0.00 |
$0.00 |
$301,720.00 |
Construct terminal building and parking lot |
90-009 |
CQW |
$9,000.00 |
$9,000.00 |
$0.00 |
$0.00 |
$18,000.00 |
Airport security fencing. |
90-008 |
6J4 |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Installation of a medium intensity runway lighting system, high intensity rotating beacon, and a precision approach path indicators (PAPI'S). (Amends original grant) |
90-007 |
CRE |
$18,898.20 |
$18,898.20 |
$0.00 |
$0.00 |
$37,796.40 |
Seal coat existing apron area of Ramp 66. |
90-006 |
CDN |
$11,475.00 |
$11,475.00 |
$0.00 |
$0.00 |
$22,950.00 |
Installation of visual approach aid (PLASI) for runway 5/23. |
90-005 |
AND |
$52,936.00 |
$52,937.00 |
$952,856.00 |
$0.00 |
$1,058,729.00 |
Construction of a parallel taxiway to 5/23. Installation of medium intensity taxiway lights and a visual approach descent indicator lighting system. Update the airport layout plan. |
90-004 |
DLC |
$35,500.00 |
$35,500.00 |
$0.00 |
$0.00 |
$71,000.00 |
Slurry seal existing airfield pavements of the runway, taxiway, and apron areas. |
90-003* |
6J0 |
$1,850.00 |
$1,850.00 |
$0.00 |
$0.00 |
$3,700.00 |
Crack seal and remarking of Runway 17/35 in accordance with SCAC specifications. |
90-002 |
ARW |
$15,400.00 |
$15,400.00 |
$0.00 |
$0.00 |
$30,800.00 |
Grading, drainage, paving, and marking of two stub taxiways for future T-hangars. |
90-001 |
OGB |
$6,000.00 |
$6,000.00 |
$0.00 |
$0.00 |
$12,000.00 |
Construction of an electrical vault building for storage of airfield lighting equipment. |
89-030 |
FDW |
$63,475.00 |
$63,475.00 |
$1,142,548.00 |
$0.00 |
$1,269,498.00 |
Design and construction of the extension and widening of runway 4/22, including a new medium intensity runway lighting system, a multiple projector descent indicator and a apron expansion. |
89-028 |
CRE |
$63,250.00 |
$63,250.00 |
$361,842.00 |
$0.00 |
$488,342.00 |
Rehabilitate apron area and construct "fun ride" apron. |
89-027 |
FLO |
$71,429.50 |
$71,429.50 |
$1,285,727.00 |
$0.00 |
$1,428,586.00 |
Resurface and mark runway 18/36, resurface and light taxiway "D", reconstruct and light taxiway "E", and install an airfield radio control lighting system. |
89-026 |
99N |
$27,500.00 |
$27,500.00 |
$0.00 |
$0.00 |
$55,000.00 |
Develop a airport master plan |