Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
89-018 AIK $18,871.00 $18,871.00 $338,597.00 $0.00 $376,339.00 Reconstruct a portion of Taxiway "A" and apron area. Construct taxiway "B" and the relocation of medium intensity taxiway lights.
89-017 DYB $12,500.00 $12,500.00 $0.00 $0.00 $25,000.00 Installation of an non-directional beacon.
89-016 CUB $45,745.00 $45,745.00 $0.00 $0.00 $91,490.00 Construction of 400' stop way (Overruns) on either end. Using full strength pavement.
89-015 SC09 $17,150.00 $17,150.00 $0.00 $0.00 $34,300.00 Relocate helipad to the center of north side of hospital. Concrete construction with installation of perimeter lights, rotating beacon, wind sock, and fire fighting equipment.
89-013 BBP $43,221.40 $43,221.40 $0.00 $0.00 $86,442.80 Rehabilitate medium intensity runway lights on runway 6/24; also installation of precision instrument approach path indicators (PAPI'S) and runway end identifier lights (REILS).
89-012 CDN $4,777.50 $4,777.50 $0.00 $0.00 $9,555.00 Replace non-directional beacon (NDB) with solid state transmitter by Southern Avionics.
89-011 CQW $3,750.00 $3,750.00 $0.00 $0.00 $7,500.00 Installation of runway end identifier lights (REILS) on the end of runway 7. REILS will be unidirectional and will operate off radio control.
89-010 GYH $34,425.00 $34,425.00 $0.00 $0.00 $68,850.00 Additional ramp area and second stub taxiway for the new general apron.
89-009 SC09 $9,539.58 $9,539.58 $0.00 $0.00 $19,079.16 Construct helicopter landing pad on hospital grounds.
89-008 MKS $38,503.16 $48,503.17 $683,056.98 $0.00 $770,063.31 Extend and widen runway 5/23 by 700' X 75'; expand apron; acquire land in fee simple or easements; construct partial parallel taxiway; install medium intensity runway and taxiway lights; clearing/grubbing runway safety zones.
89-007 FDW $78,372.00 $78,372.00 $1,410,696.00 $0.00 $1,567,440.00 Land and easement acquisition including associated fees. Design and construct site work for an 1800' runway extension including clearing/grubbing, drainage, erosion control, and relocating wind cone.
89-006 CDN $8,032.51 $8,032.51 $144,587.00 $0.00 $160,652.01 Rehabilitate medium intensity runway lights on 5/23; construct stub taxiway, including medium intensity taxiway lights.
89-004 GYH $28,000.00 $28,000.00 $24.00 $0.00 $56,024.00 Install an automated weather observation station (AWOS III)
89-003A GRD $4,288.55 $4,288.55 $0.00 $0.00 $8,577.10 Joint seal concrete apron using a fuel resistant sealant.
89-003 GRD $19,750.00 $19,750.00 $0.00 $0.00 $39,500.00 Rehabilitate concrete apron by removing and cleaning the sealant in the joints and replacing it with an jet fuel resistant sealant.
89-002 MYR $256,563.00 $256,563.00 $4,618,125.00 $0.00 $5,131,251.00 Strengthening of Runway 17/35.
89-001 6J4 $40,000.00 $40,000.00 $0.00 $0.00 $80,000.00 Installation of an medium intensity runway lighting system, rotating beacon, and a precision approach path indicator (PAPI 2).
88-035 GRD $12,893.20 $12,893.20 $0.00 $0.00 $25,786.40 Remarking of runway 9/27, painting of rotating beacon tower, and crack sealing taxiway A.
88-034 6J0 $1,613.34 $1,613.34 $0.00 $0.00 $3,226.68 Grading and hillside removal which was in violation along runway 17/35.
88-033 FLO $14,502.00 $14,502.00 $261,033.00 $0.00 $290,037.00 Develop an exhibit "A" property plat, purchase an aircraft rescue and firefighting vehicle, and constructing a building for the vehicle.