89-003 |
GRD |
$19,750.00 |
$19,750.00 |
$0.00 |
$0.00 |
$39,500.00 |
Rehabilitate concrete apron by removing and cleaning the sealant in the joints and replacing it with an jet fuel resistant sealant. |
89-002 |
MYR |
$256,563.00 |
$256,563.00 |
$4,618,125.00 |
$0.00 |
$5,131,251.00 |
Strengthening of Runway 17/35. |
89-001 |
6J4 |
$40,000.00 |
$40,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Installation of an medium intensity runway lighting system, rotating beacon, and a precision approach path indicator (PAPI 2). |
88-035 |
GRD |
$12,893.20 |
$12,893.20 |
$0.00 |
$0.00 |
$25,786.40 |
Remarking of runway 9/27, painting of rotating beacon tower, and crack sealing taxiway A. |
88-034 |
6J0 |
$1,613.34 |
$1,613.34 |
$0.00 |
$0.00 |
$3,226.68 |
Grading and hillside removal which was in violation along runway 17/35. |
88-033 |
FLO |
$14,502.00 |
$14,502.00 |
$261,033.00 |
$0.00 |
$290,037.00 |
Develop an exhibit "A" property plat, purchase an aircraft rescue and firefighting vehicle, and constructing a building for the vehicle. |
88-032 |
GMU |
$42,637.56 |
$42,637.56 |
$0.00 |
$0.00 |
$85,275.12 |
Replace medium intensity taxiway lights on taxiways "D" and "E", including double edge taxiway stripes; remove existing markings by milling and remarking runway 18/36; and marking north and south aircraft ramps. |
88-031 |
SMS |
$15,100.00 |
$15,100.00 |
$271,800.00 |
$0.00 |
$302,000.00 |
Apron and taxiway pavement rehabilitation |
88-030 |
CUB |
$6,526.50 |
$6,526.50 |
$0.00 |
$0.00 |
$13,053.00 |
Remark runway 13/31 with non-precision instrument markings. |
88-029 |
GSP |
$35,000.00 |
$267,218.00 |
$0.00 |
$0.00 |
$302,218.00 |
Airport planning study, call an Horizon Plan which is a comprehensive planning document addressing the future development needs and opportunities. Also an update to the airport layout plan (ALP). |
88-028 |
GYH |
$161,840.00 |
$161,840.00 |
$0.00 |
$0.00 |
$323,680.00 |
Construct new general aviation apron |
88-027 |
CKI |
$13,935.00 |
$13,936.00 |
$250,839.00 |
$0.00 |
$278,710.00 |
Planning, environmental assessment, construct 700' x 75' extension to runway 14/32, including clearing, drainage, and earthwork. Installation of medium intensity runway lights to the extension and relocation of the VASI system. |
88-026 |
LUX |
$4,672.30 |
$15,589.70 |
$0.00 |
$0.00 |
$20,262.00 |
Installation of security fencing, engineering for a centerline survey, installing a non-directional beacon transmitter and Unicom. |
88-025 |
HXD |
$57,050.00 |
$57,050.00 |
$1,026,900.00 |
$0.00 |
$1,141,000.00 |
Construct extensions to the parallel taxiway ends of runway 3/21, install localizer/distance measurement equipment (DME), acquire aviation easements, and clearing. |
88-024 |
ARW |
$18,667.00 |
$18,667.00 |
$336,000.00 |
$0.00 |
$373,334.00 |
Grading, drainage, paving, and marking for an aircraft parking apron and connecting taxiway. Installation of medium intensity taxiway lights, and precision approach path indicators (PAPI'S). |
88-023 |
UZA |
$8,000.00 |
$8,001.00 |
$144,011.00 |
$0.00 |
$160,012.00 |
Installation of medium intensity taxiway lights, multiple projector descent indicators and mark runway with non-precision instrument markings. |
88-022 |
OGB |
$56,125.00 |
$56,125.00 |
$0.00 |
$0.00 |
$112,250.00 |
Engineering and other professional services for preparing construction documents for site preparation and grading for a new runway. |
88-021 |
UDG |
$28,819.00 |
$28,819.00 |
$0.00 |
$0.00 |
$57,638.00 |
Construct aircraft parking apron and vehicle parking area. |
88-020 |
CAE |
$721,186.00 |
$721,186.00 |
$12,981,350.00 |
$0.00 |
$14,423,722.00 |
Extend and strengthening runway 5/23 and construction of connecting taxiways. Project will include filling, grading, paving, erosion control, grassing, installation of box culverts, high intensity runway lights, medium intensity taxiway lights. |
88-019 |
BBP |
$5,409.34 |
$5,409.34 |
$97,368.04 |
$0.00 |
$108,186.72 |
Rehabilitate a portion of runway 6/24 caused by a wet subgrade, and repair the 36 inch rotating beacon damaged from a tornado. |