89-018 |
AIK |
$18,871.00 |
$18,871.00 |
$338,597.00 |
$0.00 |
$376,339.00 |
Reconstruct a portion of Taxiway "A" and apron area. Construct taxiway "B" and the relocation of medium intensity taxiway lights. |
89-017 |
DYB |
$12,500.00 |
$12,500.00 |
$0.00 |
$0.00 |
$25,000.00 |
Installation of an non-directional beacon. |
89-016 |
CUB |
$45,745.00 |
$45,745.00 |
$0.00 |
$0.00 |
$91,490.00 |
Construction of 400' stop way (Overruns) on either end. Using full strength pavement. |
89-015 |
SC09 |
$17,150.00 |
$17,150.00 |
$0.00 |
$0.00 |
$34,300.00 |
Relocate helipad to the center of north side of hospital. Concrete construction with installation of perimeter lights, rotating beacon, wind sock, and fire fighting equipment. |
89-013 |
BBP |
$43,221.40 |
$43,221.40 |
$0.00 |
$0.00 |
$86,442.80 |
Rehabilitate medium intensity runway lights on runway 6/24; also installation of precision instrument approach path indicators (PAPI'S) and runway end identifier lights (REILS). |
89-012 |
CDN |
$4,777.50 |
$4,777.50 |
$0.00 |
$0.00 |
$9,555.00 |
Replace non-directional beacon (NDB) with solid state transmitter by Southern Avionics. |
89-011 |
CQW |
$3,750.00 |
$3,750.00 |
$0.00 |
$0.00 |
$7,500.00 |
Installation of runway end identifier lights (REILS) on the end of runway 7. REILS will be unidirectional and will operate off radio control. |
89-010 |
GYH |
$34,425.00 |
$34,425.00 |
$0.00 |
$0.00 |
$68,850.00 |
Additional ramp area and second stub taxiway for the new general apron. |
89-009 |
SC09 |
$9,539.58 |
$9,539.58 |
$0.00 |
$0.00 |
$19,079.16 |
Construct helicopter landing pad on hospital grounds. |
89-008 |
MKS |
$38,503.16 |
$48,503.17 |
$683,056.98 |
$0.00 |
$770,063.31 |
Extend and widen runway 5/23 by 700' X 75'; expand apron; acquire land in fee simple or easements; construct partial parallel taxiway; install medium intensity runway and taxiway lights; clearing/grubbing runway safety zones. |
89-007 |
FDW |
$78,372.00 |
$78,372.00 |
$1,410,696.00 |
$0.00 |
$1,567,440.00 |
Land and easement acquisition including associated fees. Design and construct site work for an 1800' runway extension including clearing/grubbing, drainage, erosion control, and relocating wind cone. |
89-006 |
CDN |
$8,032.51 |
$8,032.51 |
$144,587.00 |
$0.00 |
$160,652.01 |
Rehabilitate medium intensity runway lights on 5/23; construct stub taxiway, including medium intensity taxiway lights. |
89-004 |
GYH |
$28,000.00 |
$28,000.00 |
$24.00 |
$0.00 |
$56,024.00 |
Install an automated weather observation station (AWOS III) |
89-003A |
GRD |
$4,288.55 |
$4,288.55 |
$0.00 |
$0.00 |
$8,577.10 |
Joint seal concrete apron using a fuel resistant sealant. |
89-003 |
GRD |
$19,750.00 |
$19,750.00 |
$0.00 |
$0.00 |
$39,500.00 |
Rehabilitate concrete apron by removing and cleaning the sealant in the joints and replacing it with an jet fuel resistant sealant. |
89-002 |
MYR |
$256,563.00 |
$256,563.00 |
$4,618,125.00 |
$0.00 |
$5,131,251.00 |
Strengthening of Runway 17/35. |
89-001 |
6J4 |
$40,000.00 |
$40,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Installation of an medium intensity runway lighting system, rotating beacon, and a precision approach path indicator (PAPI 2). |
88-035 |
GRD |
$12,893.20 |
$12,893.20 |
$0.00 |
$0.00 |
$25,786.40 |
Remarking of runway 9/27, painting of rotating beacon tower, and crack sealing taxiway A. |
88-034 |
6J0 |
$1,613.34 |
$1,613.34 |
$0.00 |
$0.00 |
$3,226.68 |
Grading and hillside removal which was in violation along runway 17/35. |
88-033 |
FLO |
$14,502.00 |
$14,502.00 |
$261,033.00 |
$0.00 |
$290,037.00 |
Develop an exhibit "A" property plat, purchase an aircraft rescue and firefighting vehicle, and constructing a building for the vehicle. |