89-025 |
OGB |
$34,500.00 |
$34,500.00 |
$0.00 |
$0.00 |
$69,000.00 |
Crack seal all airfield pavements with a rubberized sealant material. |
89-024 |
6J0 |
$4,500.00 |
$4,500.00 |
$0.00 |
$0.00 |
$9,000.00 |
Crack seal runway and taxiways using a rubberized sealant. |
89-023 |
SPA |
$27,041.00 |
$27,042.00 |
$343,967.00 |
$0.00 |
$398,050.00 |
Rehabilitate of aircraft parking area and installation of a medium intensity taxiway lighting system. |
89-022 |
UDG |
$14,274.00 |
$14,275.00 |
$156,145.00 |
$0.00 |
$184,694.00 |
Installation of MIRL, 36" rotating beacon and steel tower, REILS, VADI, radio controlled system, and lighting vault. |
89-021 |
OGB |
$5,075.00 |
$5,075.00 |
$91,350.00 |
$0.00 |
$101,500.00 |
Installation of medium intensity taxiway lights (MITL) and taxiway guidance signs. |
89-020 |
52J |
$21,072.50 |
$21,072.50 |
$0.00 |
$0.00 |
$42,145.00 |
Engineering services for an paved 3250' runway, turnaround taxiways, apron area, and lighting system. |
89-018 |
AIK |
$18,871.00 |
$18,871.00 |
$338,597.00 |
$0.00 |
$376,339.00 |
Reconstruct a portion of Taxiway "A" and apron area. Construct taxiway "B" and the relocation of medium intensity taxiway lights. |
89-017 |
DYB |
$12,500.00 |
$12,500.00 |
$0.00 |
$0.00 |
$25,000.00 |
Installation of an non-directional beacon. |
89-016 |
CUB |
$45,745.00 |
$45,745.00 |
$0.00 |
$0.00 |
$91,490.00 |
Construction of 400' stop way (Overruns) on either end. Using full strength pavement. |
89-015 |
SC09 |
$17,150.00 |
$17,150.00 |
$0.00 |
$0.00 |
$34,300.00 |
Relocate helipad to the center of north side of hospital. Concrete construction with installation of perimeter lights, rotating beacon, wind sock, and fire fighting equipment. |
89-013 |
BBP |
$43,221.40 |
$43,221.40 |
$0.00 |
$0.00 |
$86,442.80 |
Rehabilitate medium intensity runway lights on runway 6/24; also installation of precision instrument approach path indicators (PAPI'S) and runway end identifier lights (REILS). |
89-012 |
CDN |
$4,777.50 |
$4,777.50 |
$0.00 |
$0.00 |
$9,555.00 |
Replace non-directional beacon (NDB) with solid state transmitter by Southern Avionics. |
89-011 |
CQW |
$3,750.00 |
$3,750.00 |
$0.00 |
$0.00 |
$7,500.00 |
Installation of runway end identifier lights (REILS) on the end of runway 7. REILS will be unidirectional and will operate off radio control. |
89-010 |
GYH |
$34,425.00 |
$34,425.00 |
$0.00 |
$0.00 |
$68,850.00 |
Additional ramp area and second stub taxiway for the new general apron. |
89-009 |
SC09 |
$9,539.58 |
$9,539.58 |
$0.00 |
$0.00 |
$19,079.16 |
Construct helicopter landing pad on hospital grounds. |
89-008 |
MKS |
$38,503.16 |
$48,503.17 |
$683,056.98 |
$0.00 |
$770,063.31 |
Extend and widen runway 5/23 by 700' X 75'; expand apron; acquire land in fee simple or easements; construct partial parallel taxiway; install medium intensity runway and taxiway lights; clearing/grubbing runway safety zones. |
89-007 |
FDW |
$78,372.00 |
$78,372.00 |
$1,410,696.00 |
$0.00 |
$1,567,440.00 |
Land and easement acquisition including associated fees. Design and construct site work for an 1800' runway extension including clearing/grubbing, drainage, erosion control, and relocating wind cone. |
89-006 |
CDN |
$8,032.51 |
$8,032.51 |
$144,587.00 |
$0.00 |
$160,652.01 |
Rehabilitate medium intensity runway lights on 5/23; construct stub taxiway, including medium intensity taxiway lights. |
89-004 |
GYH |
$28,000.00 |
$28,000.00 |
$24.00 |
$0.00 |
$56,024.00 |
Install an automated weather observation station (AWOS III) |
89-003A |
GRD |
$4,288.55 |
$4,288.55 |
$0.00 |
$0.00 |
$8,577.10 |
Joint seal concrete apron using a fuel resistant sealant. |