91-025 |
CEU |
$7,879.00 |
$29,999.00 |
$340,902.00 |
$0.00 |
$378,780.00 |
Update the airport master plan. Engineering fees, appraisal fees, and legal services associated with the fee-simple property acquisition of 11 acres on parcels D & F with relocation assistance; and parcels C, D, E, & F also will be required. |
91-024 |
GYH |
$300,000.00 |
$300,000.00 |
$300,000.00 |
$0.00 |
$900,000.00 |
Rehabilitation of the first 1000' of runway 4 concrete pavement. |
91-023 |
CDN |
$39,038.00 |
$39,038.00 |
$702,688.00 |
$0.00 |
$780,764.00 |
Extend runway 5 by 500' to a total runway length of 5000'. Extend the connecting taxiway for a partial parallel taxiway, and rehabilitate a portion of the end of runway 5 end and it's connecting taxiway. |
91-022 |
GRD |
$200,000.00 |
$200,000.00 |
$0.00 |
$0.00 |
$400,000.00 |
Construct new 4000'sf terminal building and demolition of existing building. |
91-021 |
AND |
$5,072.00 |
$39,668.00 |
$402,658.00 |
$0.00 |
$447,398.00 |
Acquire aviation easements to runway 5 approach and obstruction tree removal. Including administration an legal services, and engineering fees associated with the fee simple acquisition. |
91-020 |
GSP |
$2,116.40 |
$2,116.40 |
$38,095.19 |
$0.00 |
$42,328.00 |
The purchase and installation of equipment to meet FAA's PART 107.14 security requirements. |
91-019 |
FLO |
$17,810.00 |
$17,810.00 |
$320,580.00 |
$0.00 |
$356,200.00 |
Overlay the northern portion of taxiway "B", renovate the medium intensity runway lights (MIRL) on runway 18/36, wiring in the electrical vault, and install a new emergency generator. |
91-018 |
LQK |
$18,760.00 |
$18,760.00 |
$187,696.00 |
$0.00 |
$225,216.00 |
Construct taxiway turnaround to runway 22, remark the existing runway and taxiways, and update airport layout plan (ALP). |
91-017 |
CDN |
$2,800.00 |
$2,800.00 |
$0.00 |
$0.00 |
$5,600.00 |
Obstruction (trees) removal at the end of runway 5 and refurbishing the airport beacon tower. |
91-016A |
35A |
$4,000.00 |
$4,000.00 |
$0.00 |
$0.00 |
$8,000.00 |
Installation of two drain culverts and repair eroded areas along the embankments of the runway. |
91-016 |
35A |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Installation of drain culverts and repair eroded areas along the sides of runway 5/23. |
91-015 |
CEU |
$7,536.00 |
$7,537.00 |
$135,652.00 |
$0.00 |
$150,725.00 |
Upgrade the low intensity runway lighting system to a medium intensity lighting system, installation of runway end identifier lights (REILS), recabling the visual approach slope indicator lights (VASI), install a new segmented circle, wind cone. |
91-014 |
FLO |
$62,190.00 |
$62,190.00 |
$0.00 |
$0.00 |
$124,380.00 |
Cleaning, sterilizing, and sealing pavement cracks on runway 9/27 |
91-013 |
LQK |
$12,610.62 |
$12,610.63 |
$0.00 |
$0.00 |
$25,221.25 |
Crack seal the runway and taxiways, including cleaning and sterilizing vegetation. Also apply a coal-tar rubberized pitch emulsion seal coat to the existing apron. |
91-012 |
CUB |
$130,833.50 |
$130,833.50 |
$2,355,000.00 |
$0.00 |
$2,616,667.00 |
Construct storm drainage system on west side of Runway 31 to eliminate the existing open ditch which is within the runway safety area. |
91-011 |
FLO |
$45,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
$90,000.00 |
Phase II - Security Fencing. Installation of 10,100 linear feet of 6' chain link fencing with 3 strands of barbed wire. |
91-010 |
CRE |
$18,110.00 |
$18,110.00 |
$325,981.00 |
$0.00 |
$362,201.00 |
Extend partial parallel to a full parallel taxiway. |
91-009 |
FLO |
$51,000.00 |
$51,000.00 |
$0.00 |
$0.00 |
$102,000.00 |
Security fencing - Phase I which consist of 11,100 linear feet of 6' chain link fence with 3 strands of barbed wire. |
91-008 |
EOE |
$26,812.11 |
$26,812.11 |
$0.00 |
$0.00 |
$53,624.22 |
Crack sealing and applying a slurry seal coat type II to runway 4/22, and applying a coal tar emulsion seal coat to the aircraft parking apron. |
91-007 |
LKR |
$40,152.00 |
$40,152.00 |
$722,735.00 |
$0.00 |
$803,039.00 |