South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
91-012 CUB $130,833.50 $130,833.50 $2,355,000.00 $0.00 $2,616,667.00 Construct storm drainage system on west side of Runway 31 to eliminate the existing open ditch which is within the runway safety area.
91-011 FLO $45,000.00 $45,000.00 $0.00 $0.00 $90,000.00 Phase II - Security Fencing. Installation of 10,100 linear feet of 6' chain link fencing with 3 strands of barbed wire.
91-010 CRE $18,110.00 $18,110.00 $325,981.00 $0.00 $362,201.00 Extend partial parallel to a full parallel taxiway.
91-009 FLO $51,000.00 $51,000.00 $0.00 $0.00 $102,000.00 Security fencing - Phase I which consist of 11,100 linear feet of 6' chain link fence with 3 strands of barbed wire.
91-008 EOE $26,812.11 $26,812.11 $0.00 $0.00 $53,624.22 Crack sealing and applying a slurry seal coat type II to runway 4/22, and applying a coal tar emulsion seal coat to the aircraft parking apron.
91-007 LKR $40,152.00 $40,152.00 $722,735.00 $0.00 $803,039.00 Rehabilitate RWY 6/24 by milling and overlaying with an asphalt surface course. Also, refurbishing the medium intensity runway lighting system.
91-006 MNI $21,760.50 $21,760.50 $0.00 $0.00 $43,521.00 Airport Master Plan Study
91-005 LKR $4,265.00 $4,265.00 $0.00 $0.00 $8,530.00 Replace and enlarge concrete pad in front of FBO maintenance facility and the erection of 4' security fence.
91-003 GMU $50,409.00 $50,410.00 $907,367.00 $0.00 $1,008,186.00 Rehabilitate portion of the parallel taxiway to runway 18/36 approximate 1000'; construct partial parallel taxiway to runway 18; expand east apron; modify taxiway guidance signs; install medium intensity taxiway lights; and update the airport layout plan
91-002 UDG $4,712.50 $4,712.50 $0.00 $0.00 $9,425.00 Clear trees in the clear zone at the ends of runways 23 and 28, remove stumps and under growth, grub, disc, and seed. Twenty-nine acres of land owned by the airport are involved.
91-001* CDN $1,768.00 $1,768.00 $0.00 $0.00 $3,536.00 Installation of visual approach aids (PLASI) on runway 5/23.
90-025 S19 $3,163.00 $3,163.00 $0.00 $0.00 $6,326.00 A study to develop the necessary documents to develop a land use zoning plan around the airport. This plan will include height restrictions and incompatible land use.
90-024 EOE $10,000.00 $10,000.00 $0.00 $0.00 $20,000.00 Preparation of a new airport layout plan. This plan includes aerial photography and topographic surveys.
90-023 CUB $9,069.95 $9,069.95 $0.00 $0.00 $18,139.90 Update the Airport Layout Plan (ALP).
90-022 UDG $4,179.52 $4,179.53 $0.00 $0.00 $8,359.04 Seal coat the existing apron using a coal-tar sealant and seal coat and restripe the auto parking lot.
90-021 FDW $46,040.00 $46,040.00 $828,718.00 $0.00 $920,798.00 Construct parallel taxiway and stub connectors, and install medium intensity runway lights.
90-020 FLO $2,252.00 $2,253.00 $40,538.00 $0.00 $45,043.00 Installation of lighted runway identification signs for each connecting taxiway to runways 9/27 and 18/36.
90-019 GYH $11,161.00 $11,161.00 $200,900.00 $0.00 $223,222.00 Update the airport layout plan, install medium intensity taxiway lights on taxiway "A", electrical vault modifications, and install a 4-Box precision approach path indicators (PAPI'S) on runways 4/22.
90-018 SC62 $10,000.00 $10,000.00 $0.00 $0.00 $20,000.00 Construction of a emergency medical service heliport.
90-017 CQW $18,216.00 $18,216.00 $327,881.00 $0.00 $364,313.00 Construct a 1000' runway extension, install medium intensity runway lights and PAPIS, legal fees and appraisals for land acquisition.