91-012 |
CUB |
$130,833.50 |
$130,833.50 |
$2,355,000.00 |
$0.00 |
$2,616,667.00 |
Construct storm drainage system on west side of Runway 31 to eliminate the existing open ditch which is within the runway safety area. |
91-011 |
FLO |
$45,000.00 |
$45,000.00 |
$0.00 |
$0.00 |
$90,000.00 |
Phase II - Security Fencing. Installation of 10,100 linear feet of 6' chain link fencing with 3 strands of barbed wire. |
91-010 |
CRE |
$18,110.00 |
$18,110.00 |
$325,981.00 |
$0.00 |
$362,201.00 |
Extend partial parallel to a full parallel taxiway. |
91-009 |
FLO |
$51,000.00 |
$51,000.00 |
$0.00 |
$0.00 |
$102,000.00 |
Security fencing - Phase I which consist of 11,100 linear feet of 6' chain link fence with 3 strands of barbed wire. |
91-008 |
EOE |
$26,812.11 |
$26,812.11 |
$0.00 |
$0.00 |
$53,624.22 |
Crack sealing and applying a slurry seal coat type II to runway 4/22, and applying a coal tar emulsion seal coat to the aircraft parking apron. |
91-007 |
LKR |
$40,152.00 |
$40,152.00 |
$722,735.00 |
$0.00 |
$803,039.00 |
Rehabilitate RWY 6/24 by milling and overlaying with an asphalt surface course. Also, refurbishing the medium intensity runway lighting system. |
91-006 |
MNI |
$21,760.50 |
$21,760.50 |
$0.00 |
$0.00 |
$43,521.00 |
Airport Master Plan Study |
91-005 |
LKR |
$4,265.00 |
$4,265.00 |
$0.00 |
$0.00 |
$8,530.00 |
Replace and enlarge concrete pad in front of FBO maintenance facility and the erection of 4' security fence. |
91-003 |
GMU |
$50,409.00 |
$50,410.00 |
$907,367.00 |
$0.00 |
$1,008,186.00 |
Rehabilitate portion of the parallel taxiway to runway 18/36 approximate 1000'; construct partial parallel taxiway to runway 18; expand east apron; modify taxiway guidance signs; install medium intensity taxiway lights; and update the airport layout plan |
91-002 |
UDG |
$4,712.50 |
$4,712.50 |
$0.00 |
$0.00 |
$9,425.00 |
Clear trees in the clear zone at the ends of runways 23 and 28, remove stumps and under growth, grub, disc, and seed. Twenty-nine acres of land owned by the airport are involved. |
91-001* |
CDN |
$1,768.00 |
$1,768.00 |
$0.00 |
$0.00 |
$3,536.00 |
Installation of visual approach aids (PLASI) on runway 5/23. |
90-025 |
S19 |
$3,163.00 |
$3,163.00 |
$0.00 |
$0.00 |
$6,326.00 |
A study to develop the necessary documents to develop a land use zoning plan around the airport. This plan will include height restrictions and incompatible land use. |
90-024 |
EOE |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Preparation of a new airport layout plan. This plan includes aerial photography and topographic surveys. |
90-023 |
CUB |
$9,069.95 |
$9,069.95 |
$0.00 |
$0.00 |
$18,139.90 |
Update the Airport Layout Plan (ALP). |
90-022 |
UDG |
$4,179.52 |
$4,179.53 |
$0.00 |
$0.00 |
$8,359.04 |
Seal coat the existing apron using a coal-tar sealant and seal coat and restripe the auto parking lot. |
90-021 |
FDW |
$46,040.00 |
$46,040.00 |
$828,718.00 |
$0.00 |
$920,798.00 |
Construct parallel taxiway and stub connectors, and install medium intensity runway lights. |
90-020 |
FLO |
$2,252.00 |
$2,253.00 |
$40,538.00 |
$0.00 |
$45,043.00 |
Installation of lighted runway identification signs for each connecting taxiway to runways 9/27 and 18/36. |
90-019 |
GYH |
$11,161.00 |
$11,161.00 |
$200,900.00 |
$0.00 |
$223,222.00 |
Update the airport layout plan, install medium intensity taxiway lights on taxiway "A", electrical vault modifications, and install a 4-Box precision approach path indicators (PAPI'S) on runways 4/22. |
90-018 |
SC62 |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Construction of a emergency medical service heliport. |
90-017 |
CQW |
$18,216.00 |
$18,216.00 |
$327,881.00 |
$0.00 |
$364,313.00 |
Construct a 1000' runway extension, install medium intensity runway lights and PAPIS, legal fees and appraisals for land acquisition. |