93-006 |
GGE |
$8,980.00 |
$8,980.00 |
$0.00 |
$0.00 |
$17,960.00 |
Construct taxilane to a ten bay t-hangar and one large storage hangar. |
93-005 |
UZA |
$5,850.00 |
$5,850.00 |
$105,300.00 |
$0.00 |
$117,000.00 |
Building demolition and obstruction removal |
93-004 |
SPA |
$13,900.00 |
$13,900.00 |
$0.00 |
$0.00 |
$27,800.00 |
Update the Airport Layout Plan (ALP) |
93-003A |
HYW |
$8,907.00 |
$8,907.00 |
$160,322.00 |
$0.00 |
$178,136.00 |
Amendment to SCAC No. 93-003 for clearing an additional 42 acres of airport property. |
93-003 |
HYW |
$9,099.00 |
$9,099.00 |
$163,779.00 |
$0.00 |
$181,977.00 |
Clearing of approximately 45.21 acres of airport property of all vegetation to a maximum height of 4 inches above the ground. |
93-002 |
GYH |
$6,000.00 |
$6,000.00 |
$0.00 |
$0.00 |
$12,000.00 |
Replacing the runway end identifier lights (REILS) on the end of runway 4. |
93-001 |
LKR |
$2,580.54 |
$3,364.05 |
$53,501.27 |
$0.00 |
$59,445.86 |
Amend grant #91-007 for additional residential engineering services, quality control testing, and for change orders for additional materials used by the contractor. |
92-030 |
CQW |
$75,000.00 |
$75,000.00 |
$0.00 |
$0.00 |
$150,000.00 |
Construction of a new terminal building, approximately 2,786 S.F. |
92-028 |
MKS |
$7,920.00 |
$23,762.51 |
$0.00 |
$0.00 |
$31,682.51 |
Construction of two taxilanes to provide access to a 10 unit T-hangar. |
92-027 |
3J1 |
$30,958.00 |
$30,958.00 |
$0.00 |
$0.00 |
$61,916.00 |
Reevaluation of the existing environmental assessment (EA-FONSI approved August 13, 1986) and update the airport layout plan. |
92-026 |
LUX |
$42,534.00 |
$42,535.00 |
$765,625.00 |
$0.00 |
$850,694.00 |
Complete the extension to runway 26 by 700'. Construct a taxiway turnaround at the end of runway 26, and a partial parallel taxiway to runway 8, expand the apron, and install medium intensity taxiway and runway lights. |
92-025 |
CRE |
$4,527.00 |
$4,528.00 |
$81,495.00 |
$0.00 |
$90,550.00 |
Construction of a 80' X 160' aircraft holding apron located at the end of the parallel taxiway of runway 23. |
92-024 |
51J |
$20,516.90 |
$20,516.90 |
$0.00 |
$0.00 |
$41,033.80 |
Construct a 6' chain link fence using nine gauge wire with three strands of barbwire, including access gates. Fence is located west of runway 1/19. |
92-023 |
MYR |
$76,232.99 |
$88,456.01 |
$1,482,206.00 |
$0.00 |
$1,646,895.00 |
Develop a Airport Master Plan and Base Re-Utilization Study. Procurement of two (2) 1500 gallon ARFF vehicles and one (1) quick response multi-agent vehicle with a dry chemical system. Installation of a 6-foot chain link security fence with three strands of wire. |
92-022 |
GYH |
$55,267.00 |
$55,268.00 |
$45,000.00 |
$0.00 |
$155,535.00 |
Runway 4 rehabilitation, amendment due to unforeseen site conditions. |
92-021 |
SPA |
$8,447.07 |
$8,447.07 |
$371,534.61 |
$0.00 |
$388,428.75 |
Overlay a portion of taxiway "B" and the expansion of terminal aircraft parking apron |
92-020 |
CUB |
$5,161.99 |
$5,162.00 |
$92,915.91 |
$0.00 |
$103,239.90 |
Acquire land easements for the runway protection zones for runway 13/31 which consist of 13.90 acres. |
92-019 |
UZA |
$5,750.00 |
$5,750.00 |
$103,500.00 |
$0.00 |
$115,000.00 |
Airport Master Plan - AIP 3-45-0049-10 |
92-018 |
FLO |
$20,324.08 |
$20,324.09 |
$365,833.58 |
$0.00 |
$406,481.75 |
Refurbish the drainage system in the north general aviation parking apron and construct a concrete aircraft parking tarmac, used by commuter aircraft at the terminal building. |
92-017 |
AIK |
$12,470.00 |
$12,470.00 |
$0.00 |
$0.00 |
$24,940.00 |
Construction of a 40' X 40' concrete helipad with perimeter lighting. |