Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
92-022 GYH $55,267.00 $55,268.00 $45,000.00 $0.00 $155,535.00 Runway 4 rehabilitation, amendment due to unforeseen site conditions.
92-021 SPA $8,447.07 $8,447.07 $371,534.61 $0.00 $388,428.75 Overlay a portion of taxiway "B" and the expansion of terminal aircraft parking apron
92-020 CUB $5,161.99 $5,162.00 $92,915.91 $0.00 $103,239.90 Acquire land easements for the runway protection zones for runway 13/31 which consist of 13.90 acres.
92-019 UZA $5,750.00 $5,750.00 $103,500.00 $0.00 $115,000.00 Airport Master Plan - AIP 3-45-0049-10
92-018 FLO $20,324.08 $20,324.09 $365,833.58 $0.00 $406,481.75 Refurbish the drainage system in the north general aviation parking apron and construct a concrete aircraft parking tarmac, used by commuter aircraft at the terminal building.
92-017 AIK $12,470.00 $12,470.00 $0.00 $0.00 $24,940.00 Construction of a 40' X 40' concrete helipad with perimeter lighting.
92-016 UZA $192,499.89 $428,859.11 $3,434,443.00 $0.00 $4,055,802.00 Extend runway and taxiway by 500', reconstruct and resurface runway, reconstruct parallel taxiway, reconstruct and expand apron, install medium approach lighting system (MALS); medium intensity runway and taxiway lights; relocate Celanese road,
92-015A UDG $531.15 $538.13 $9,190.00 $0.00 $10,259.28 Amendment to SCAC #92-015 for the reconstruction of the parallel taxiway to runway 5/23, including the medium intensity taxiway lighting system and replacement of the wind cone.
92-015 UDG $28,759.00 $28,761.40 $517,677.00 $0.00 $575,197.40 Reconstruction of the parallel taxiway to runway 5/23 consisting of 8.5" of crushed aggregate base course and 2" of surface course. Installation a medium intensity taxiway lighting system and replacing wind cone. Overlaying a portion of the parallel taxiway.
92-014 GSP $22,358.00 $22,359.00 $280,447.00 $0.00 $325,164.00 Acquire an aircraft rescue and fire fighting vehicle, with a capacity of 1,500 gallons, for a index c airport.
92-012 SC09 $4,000.00 $4,000.00 $0.00 $0.00 $8,000.00 Construction of an emergency services helipad.
92-010 RBW $2,600.00 $2,600.00 $0.00 $0.00 $5,200.00 Emergency repairs to the storm drainage system underneath the concrete ramp.
92-009 LQK $30,662.00 $30,662.00 $388,888.00 $0.00 $450,212.00 Expand apron by approximate 9,500 S.Y., and relocate and install new non-directional radio beacon.
92-008 GMU $35,854.30 $35,854.30 $0.00 $0.00 $71,708.60 Installation of medium intensity runway lights (MIRL) on runway 9/27 and installation of retro reflective taxiway markers on the parallel taxiway and connecting taxiways serving runway 9/27.
92-007 SPA $14,000.00 $14,000.00 $0.00 $0.00 $28,000.00 Engineering design services for rehabilitating Taxiway B and expanding the terminal aircraft parking apron.
92-006 GGE $25,000.00 $25,000.00 $0.00 $0.00 $50,000.00 Geo-technical testing using soil borings and radar penetration testing for preliminary design on runway 5/23 for a future runway reconstruction project.
92-005 CDN $6,956.00 $6,957.00 $125,210.00 $0.00 $139,123.00 Apron Drainage Improvement Project. Replacing deteriorated drainage pipe located in the apron area and installing additional catch basins.
92-004 MKS $23,315.80 $23,315.81 $419,684.60 $0.00 $466,316.21 Runway 5/23 rehabilitation and updating the airport layout plan.
92-003 SMS $175,000.00 $175,000.00 $0.00 $0.00 $350,000.00 Renovations and expansion to the existing terminal building.
92-002A 6J0 $3,400.00 $3,400.00 $0.00 $0.00 $6,800.00 Engineering and legal services for land acquisition in the terminal area.