92-022 |
GYH |
$55,267.00 |
$55,268.00 |
$45,000.00 |
$0.00 |
$155,535.00 |
Runway 4 rehabilitation, amendment due to unforeseen site conditions. |
92-021 |
SPA |
$8,447.07 |
$8,447.07 |
$371,534.61 |
$0.00 |
$388,428.75 |
Overlay a portion of taxiway "B" and the expansion of terminal aircraft parking apron |
92-020 |
CUB |
$5,161.99 |
$5,162.00 |
$92,915.91 |
$0.00 |
$103,239.90 |
Acquire land easements for the runway protection zones for runway 13/31 which consist of 13.90 acres. |
92-019 |
UZA |
$5,750.00 |
$5,750.00 |
$103,500.00 |
$0.00 |
$115,000.00 |
Airport Master Plan - AIP 3-45-0049-10 |
92-018 |
FLO |
$20,324.08 |
$20,324.09 |
$365,833.58 |
$0.00 |
$406,481.75 |
Refurbish the drainage system in the north general aviation parking apron and construct a concrete aircraft parking tarmac, used by commuter aircraft at the terminal building. |
92-017 |
AIK |
$12,470.00 |
$12,470.00 |
$0.00 |
$0.00 |
$24,940.00 |
Construction of a 40' X 40' concrete helipad with perimeter lighting. |
92-016 |
UZA |
$192,499.89 |
$428,859.11 |
$3,434,443.00 |
$0.00 |
$4,055,802.00 |
Extend runway and taxiway by 500', reconstruct and resurface runway, reconstruct parallel taxiway, reconstruct and expand apron, install medium approach lighting system (MALS); medium intensity runway and taxiway lights; relocate Celanese road, |
92-015A |
UDG |
$531.15 |
$538.13 |
$9,190.00 |
$0.00 |
$10,259.28 |
Amendment to SCAC #92-015 for the reconstruction of the parallel taxiway to runway 5/23, including the medium intensity taxiway lighting system and replacement of the wind cone. |
92-015 |
UDG |
$28,759.00 |
$28,761.40 |
$517,677.00 |
$0.00 |
$575,197.40 |
Reconstruction of the parallel taxiway to runway 5/23 consisting of 8.5" of crushed aggregate base course and 2" of surface course. Installation a medium intensity taxiway lighting system and replacing wind cone. Overlaying a portion of the parallel taxiway. |
92-014 |
GSP |
$22,358.00 |
$22,359.00 |
$280,447.00 |
$0.00 |
$325,164.00 |
Acquire an aircraft rescue and fire fighting vehicle, with a capacity of 1,500 gallons, for a index c airport. |
92-012 |
SC09 |
$4,000.00 |
$4,000.00 |
$0.00 |
$0.00 |
$8,000.00 |
Construction of an emergency services helipad. |
92-010 |
RBW |
$2,600.00 |
$2,600.00 |
$0.00 |
$0.00 |
$5,200.00 |
Emergency repairs to the storm drainage system underneath the concrete ramp. |
92-009 |
LQK |
$30,662.00 |
$30,662.00 |
$388,888.00 |
$0.00 |
$450,212.00 |
Expand apron by approximate 9,500 S.Y., and relocate and install new non-directional radio beacon. |
92-008 |
GMU |
$35,854.30 |
$35,854.30 |
$0.00 |
$0.00 |
$71,708.60 |
Installation of medium intensity runway lights (MIRL) on runway 9/27 and installation of retro reflective taxiway markers on the parallel taxiway and connecting taxiways serving runway 9/27. |
92-007 |
SPA |
$14,000.00 |
$14,000.00 |
$0.00 |
$0.00 |
$28,000.00 |
Engineering design services for rehabilitating Taxiway B and expanding the terminal aircraft parking apron. |
92-006 |
GGE |
$25,000.00 |
$25,000.00 |
$0.00 |
$0.00 |
$50,000.00 |
Geo-technical testing using soil borings and radar penetration testing for preliminary design on runway 5/23 for a future runway reconstruction project. |
92-005 |
CDN |
$6,956.00 |
$6,957.00 |
$125,210.00 |
$0.00 |
$139,123.00 |
Apron Drainage Improvement Project. Replacing deteriorated drainage pipe located in the apron area and installing additional catch basins. |
92-004 |
MKS |
$23,315.80 |
$23,315.81 |
$419,684.60 |
$0.00 |
$466,316.21 |
Runway 5/23 rehabilitation and updating the airport layout plan. |
92-003 |
SMS |
$175,000.00 |
$175,000.00 |
$0.00 |
$0.00 |
$350,000.00 |
Renovations and expansion to the existing terminal building. |
92-002A |
6J0 |
$3,400.00 |
$3,400.00 |
$0.00 |
$0.00 |
$6,800.00 |
Engineering and legal services for land acquisition in the terminal area. |