88-018 |
GYH |
$5,881.91 |
$5,881.91 |
$0.00 |
$0.00 |
$11,763.82 |
Joint and crack sealing on runway 4/22. |
88-016 |
FLO |
$11,625.00 |
$11,625.00 |
$0.00 |
$0.00 |
$23,250.00 |
Expand passenger and screening/holding area in terminal building. |
88-015 |
HYW |
$6,607.50 |
$6,607.50 |
$118,937.00 |
$0.00 |
$132,152.00 |
Southwest aircraft parking apron rehabilitation. |
88-014 |
HYW |
$62,590.50 |
$62,590.50 |
$1,113,550.00 |
$0.00 |
$1,238,731.00 |
Extend and widen runway 4/22 to 4400' x 75', extend taxiway to a full parallel, expansion to the aircraft parking apron, installation of a medium intensity runway and taxiway lighting system, and the installation of PAPI II visual approach system. |
88-013 |
MYR |
$26,738.90 |
$26,738.91 |
$481,300.00 |
$0.00 |
$534,777.81 |
Construction of an expanded aircraft parking apron. |
88-012 |
GRD |
$13,000.00 |
$13,000.00 |
$0.00 |
$0.00 |
$26,000.00 |
Crack sealing of runway 9/27 |
88-011 |
CKI |
$25,000.00 |
$25,000.00 |
$0.00 |
$0.00 |
$50,000.00 |
Emergency repair to runway 14/32. Removal and replacement of existing damaged pavement and sealing of cracks in asphalt runway. |
88-010 |
MYR |
$9,682.00 |
$9,682.00 |
$174,273.00 |
$0.00 |
$193,637.00 |
Comprehensive Master Plan of Aviation Facilities in Horry County |
88-009 |
MYR |
$5,257.00 |
$5,257.00 |
$94,617.00 |
$0.00 |
$105,131.00 |
Airport master plan terminal area study |
88-008 |
AND |
$138,000.00 |
$138,000.00 |
$0.00 |
$0.00 |
$276,000.00 |
Reconstruction and strengthen apron near cargo hangar, and strengthen connecting taxiway. |
88-006 |
CRE |
$9,168.56 |
$9,168.56 |
$165,034.06 |
$0.00 |
$183,371.18 |
Installation of high intensity runway lights for runway 5/23. |
88-005 |
CRE |
$12,714.96 |
$12,714.95 |
$228,869.22 |
$0.00 |
$254,299.13 |
Rehabilitation of taxiways |
88-004 |
CRE |
$62,943.26 |
$62,943.26 |
$1,132,978.74 |
$0.00 |
$1,258,865.26 |
Construct a connector taxiway for a full parallel taxiway, rehabilitation of runway 5/23 and medium intensity taxiway lights. |
88-003 |
GYH |
$19,181.29 |
$19,181.29 |
$0.00 |
$0.00 |
$38,362.58 |
Asphalt overlay of badly cracked concrete ramp near Lockheed maintenance hangar. |
88-002 |
GMU |
$32,056.00 |
$32,056.00 |
$577,008.00 |
$0.00 |
$641,120.00 |
Construct taxiways to general aviation apron; construct general apron (225' x 250'); construct T-Hangar taxiways; and install medium intensity taxiway lights |
88-001A |
6J4 |
$2,881.13 |
$2,881.13 |
$0.00 |
$0.00 |
$5,762.26 |
Crack and slurry seal existing apron and construct a taxiway to a three bay T-hangar. |
88-001 |
6J4 |
$7,800.00 |
$7,800.00 |
$0.00 |
$0.00 |
$15,600.00 |
Slurry seal existing apron and construct a taxiway three bay T-hangar. |
87-035 |
OGB |
$39,900.00 |
$89,600.00 |
$0.00 |
$0.00 |
$129,500.00 |
Rebuild airport administration building which was destroyed by fire on August 28, 1986. |
87-034 |
3J1 |
$3,650.00 |
$3,650.00 |
$0.00 |
$0.00 |
$7,300.00 |
Repairs and a asphalt overlay to the taxiway and ramp. |
87-033 |
CDN |
$150,196.50 |
$150,196.50 |
$0.00 |
$0.00 |
$300,393.00 |
Construct terminal building and auto parking lot |