Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
88-032 GMU $42,637.56 $42,637.56 $0.00 $0.00 $85,275.12 Replace medium intensity taxiway lights on taxiways "D" and "E", including double edge taxiway stripes; remove existing markings by milling and remarking runway 18/36; and marking north and south aircraft ramps.
88-031 SMS $15,100.00 $15,100.00 $271,800.00 $0.00 $302,000.00 Apron and taxiway pavement rehabilitation
88-030 CUB $6,526.50 $6,526.50 $0.00 $0.00 $13,053.00 Remark runway 13/31 with non-precision instrument markings.
88-029 GSP $35,000.00 $267,218.00 $0.00 $0.00 $302,218.00 Airport planning study, call an Horizon Plan which is a comprehensive planning document addressing the future development needs and opportunities. Also an update to the airport layout plan (ALP).
88-028 GYH $161,840.00 $161,840.00 $0.00 $0.00 $323,680.00 Construct new general aviation apron
88-027 CKI $13,935.00 $13,936.00 $250,839.00 $0.00 $278,710.00 Planning, environmental assessment, construct 700' x 75' extension to runway 14/32, including clearing, drainage, and earthwork. Installation of medium intensity runway lights to the extension and relocation of the VASI system.
88-026 LUX $4,672.30 $15,589.70 $0.00 $0.00 $20,262.00 Installation of security fencing, engineering for a centerline survey, installing a non-directional beacon transmitter and Unicom.
88-025 HXD $57,050.00 $57,050.00 $1,026,900.00 $0.00 $1,141,000.00 Construct extensions to the parallel taxiway ends of runway 3/21, install localizer/distance measurement equipment (DME), acquire aviation easements, and clearing.
88-024 ARW $18,667.00 $18,667.00 $336,000.00 $0.00 $373,334.00 Grading, drainage, paving, and marking for an aircraft parking apron and connecting taxiway. Installation of medium intensity taxiway lights, and precision approach path indicators (PAPI'S).
88-023 UZA $8,000.00 $8,001.00 $144,011.00 $0.00 $160,012.00 Installation of medium intensity taxiway lights, multiple projector descent indicators and mark runway with non-precision instrument markings.
88-022 OGB $56,125.00 $56,125.00 $0.00 $0.00 $112,250.00 Engineering and other professional services for preparing construction documents for site preparation and grading for a new runway.
88-021 UDG $28,819.00 $28,819.00 $0.00 $0.00 $57,638.00 Construct aircraft parking apron and vehicle parking area.
88-020 CAE $721,186.00 $721,186.00 $12,981,350.00 $0.00 $14,423,722.00 Extend and strengthening runway 5/23 and construction of connecting taxiways. Project will include filling, grading, paving, erosion control, grassing, installation of box culverts, high intensity runway lights, medium intensity taxiway lights.
88-019 BBP $5,409.34 $5,409.34 $97,368.04 $0.00 $108,186.72 Rehabilitate a portion of runway 6/24 caused by a wet subgrade, and repair the 36 inch rotating beacon damaged from a tornado.
88-018 GYH $5,881.91 $5,881.91 $0.00 $0.00 $11,763.82 Joint and crack sealing on runway 4/22.
88-016 FLO $11,625.00 $11,625.00 $0.00 $0.00 $23,250.00 Expand passenger and screening/holding area in terminal building.
88-015 HYW $6,607.50 $6,607.50 $118,937.00 $0.00 $132,152.00 Southwest aircraft parking apron rehabilitation.
88-014 HYW $62,590.50 $62,590.50 $1,113,550.00 $0.00 $1,238,731.00 Extend and widen runway 4/22 to 4400' x 75', extend taxiway to a full parallel, expansion to the aircraft parking apron, installation of a medium intensity runway and taxiway lighting system, and the installation of PAPI II visual approach system.
88-013 MYR $26,738.90 $26,738.91 $481,300.00 $0.00 $534,777.81 Construction of an expanded aircraft parking apron.
88-012 GRD $13,000.00 $13,000.00 $0.00 $0.00 $26,000.00 Crack sealing of runway 9/27