Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
88-018 GYH $5,881.91 $5,881.91 $0.00 $0.00 $11,763.82 Joint and crack sealing on runway 4/22.
88-016 FLO $11,625.00 $11,625.00 $0.00 $0.00 $23,250.00 Expand passenger and screening/holding area in terminal building.
88-015 HYW $6,607.50 $6,607.50 $118,937.00 $0.00 $132,152.00 Southwest aircraft parking apron rehabilitation.
88-014 HYW $62,590.50 $62,590.50 $1,113,550.00 $0.00 $1,238,731.00 Extend and widen runway 4/22 to 4400' x 75', extend taxiway to a full parallel, expansion to the aircraft parking apron, installation of a medium intensity runway and taxiway lighting system, and the installation of PAPI II visual approach system.
88-013 MYR $26,738.90 $26,738.91 $481,300.00 $0.00 $534,777.81 Construction of an expanded aircraft parking apron.
88-012 GRD $13,000.00 $13,000.00 $0.00 $0.00 $26,000.00 Crack sealing of runway 9/27
88-011 CKI $25,000.00 $25,000.00 $0.00 $0.00 $50,000.00 Emergency repair to runway 14/32. Removal and replacement of existing damaged pavement and sealing of cracks in asphalt runway.
88-010 MYR $9,682.00 $9,682.00 $174,273.00 $0.00 $193,637.00 Comprehensive Master Plan of Aviation Facilities in Horry County
88-009 MYR $5,257.00 $5,257.00 $94,617.00 $0.00 $105,131.00 Airport master plan terminal area study
88-008 AND $138,000.00 $138,000.00 $0.00 $0.00 $276,000.00 Reconstruction and strengthen apron near cargo hangar, and strengthen connecting taxiway.
88-006 CRE $9,168.56 $9,168.56 $165,034.06 $0.00 $183,371.18 Installation of high intensity runway lights for runway 5/23.
88-005 CRE $12,714.96 $12,714.95 $228,869.22 $0.00 $254,299.13 Rehabilitation of taxiways
88-004 CRE $62,943.26 $62,943.26 $1,132,978.74 $0.00 $1,258,865.26 Construct a connector taxiway for a full parallel taxiway, rehabilitation of runway 5/23 and medium intensity taxiway lights.
88-003 GYH $19,181.29 $19,181.29 $0.00 $0.00 $38,362.58 Asphalt overlay of badly cracked concrete ramp near Lockheed maintenance hangar.
88-002 GMU $32,056.00 $32,056.00 $577,008.00 $0.00 $641,120.00 Construct taxiways to general aviation apron; construct general apron (225' x 250'); construct T-Hangar taxiways; and install medium intensity taxiway lights
88-001A 6J4 $2,881.13 $2,881.13 $0.00 $0.00 $5,762.26 Crack and slurry seal existing apron and construct a taxiway to a three bay T-hangar.
88-001 6J4 $7,800.00 $7,800.00 $0.00 $0.00 $15,600.00 Slurry seal existing apron and construct a taxiway three bay T-hangar.
87-035 OGB $39,900.00 $89,600.00 $0.00 $0.00 $129,500.00 Rebuild airport administration building which was destroyed by fire on August 28, 1986.
87-034 3J1 $3,650.00 $3,650.00 $0.00 $0.00 $7,300.00 Repairs and a asphalt overlay to the taxiway and ramp.
87-033 CDN $150,196.50 $150,196.50 $0.00 $0.00 $300,393.00 Construct terminal building and auto parking lot