Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
87-011 HXD $0.00 $13,600.00 $244,800.00 $0.00 $258,400.00 Crash/Fire/Rescue Station, Rapid Intervention Fire Truck and 36" Rotating Beacon with Tower. AIP Project 3-45=0030-02
87-010A SMS $47,690.00 $48,000.00 $42,310.00 $0.00 $138,000.00 Construction of a 700' runway extension to runway 4/22 including medium intensity runway lights and connecting parallel taxiway with lights. Master Plan Update.
87-010 SMS $23,506.00 $23,506.00 $423,103.00 $0.00 $470,115.00 (1) Construct 700' Runway Extension & parallel Taxiway with medium intensity runway and taxiway lights. (2) Master Plan Update
87-009 SMS $11,650.00 $11,650.00 $209,700.00 $0.00 $233,000.00 (1) Acquire Clear Zone Land for Runway 4-22 Extension. (2)Environmental Assessment of Runway Extension.
87-004 DYB $31,292.59 $35,638.44 $641,492.04 $0.00 $708,423.08 Site Preparation for General Utility Runway, Stub taxiway, and Apron Area.
87-003 DYB $5,870.96 $5,870.96 $105,677.30 $0.00 $117,419.22 Install MIRL, MITL, PAPI-2, Beacon, Wind Cone & Segmented Circle.
87-002 DYB $15,156.60 $117,424.26 $411,864.88 $0.00 $544,445.74 Land Acquisition and associated cost
87-001 DYB $49,077.95 $49,077.96 $836,973.95 $0.00 $935,129.86 Paving of Runway 5/23, Stub Taxiway and Apron Area.
86-xx4 CKI $60,000.00 $0.00 $0.00 $0.00 $0.00 Preliminary engineering design and environmental assessment for a 700'runway extension, including the construction of a 4400' parallel taxiway, and 150'x300' apron expansion; widen & strengthen of runway and safety areas.
86-xx3 UDG $45,000.00 $0.00 $0.00 $0.00 $45,000.00 Construction Of Airport Terminal Building
86-xx2 MNI $60,000.00 $0.00 $0.00 $0.00 $60,000.00 Preliminary engineering for runway extension
86-xx1 99N $25,000.00 $0.00 $0.00 $0.00 $25,000.00 Installation of Airfield Lighting
86-041 6J0 $1,955.00 $1,956.00 $35,193.00 $0.00 $39,104.00 Preparation of an Airport Master Plan Study. Phase I-Airport Requirements, Phase II-Site Evaluation, Phase III-Airport Plans, Phase IV-Scheduling and Cost, and Phase V-Miscellaneous Items.
86-038 BBP $7,500.00 $7,500.00 $0.00 $0.00 $15,000.00 Repair of runway surface deterioration occurring in joints or seams resulting from the elements during seventeen years of exposure.
86-037 BBP $3,000.00 $3,000.00 $0.00 $0.00 $6,000.00 Marking of Runway And Taxiway
86-036 AND $3,312.50 $3,312.50 $0.00 $0.00 $6,625.00 Pave Auto Parking Area
86-034 UZA $81,000.00 $81,000.00 $0.00 $0.00 $162,000.00 Installation of Localizer, Equipment needed for a future instrument landing system.
86-032 UZA $30,929.92 $30,929.92 $556,732.00 $0.00 $618,591.84 Site Preparation (clearing & drainage) for Runway 19 Safety Area, and Expand Apron (19,987 SY). (AIP 3-45-0049-02)
86-031 6J0 $19,737.90 $19,737.90 $0.00 $0.00 $39,475.80 Terminal Building - Phase I.
86-030 AND $30,000.00 $30,000.00 $0.00 $0.00 $60,000.00 Expand FBO Apron