87-011 |
HXD |
$0.00 |
$13,600.00 |
$244,800.00 |
$0.00 |
$258,400.00 |
Crash/Fire/Rescue Station, Rapid Intervention Fire Truck and 36" Rotating Beacon with Tower. AIP Project 3-45=0030-02 |
87-010A |
SMS |
$47,690.00 |
$48,000.00 |
$42,310.00 |
$0.00 |
$138,000.00 |
Construction of a 700' runway extension to runway 4/22 including medium intensity runway lights and connecting parallel taxiway with lights. Master Plan Update. |
87-010 |
SMS |
$23,506.00 |
$23,506.00 |
$423,103.00 |
$0.00 |
$470,115.00 |
(1) Construct 700' Runway Extension & parallel Taxiway with medium intensity runway and taxiway lights. (2) Master Plan Update |
87-009 |
SMS |
$11,650.00 |
$11,650.00 |
$209,700.00 |
$0.00 |
$233,000.00 |
(1) Acquire Clear Zone Land for Runway 4-22 Extension. (2)Environmental Assessment of Runway Extension. |
87-004 |
DYB |
$31,292.59 |
$35,638.44 |
$641,492.04 |
$0.00 |
$708,423.08 |
Site Preparation for General Utility Runway, Stub taxiway, and Apron Area. |
87-003 |
DYB |
$5,870.96 |
$5,870.96 |
$105,677.30 |
$0.00 |
$117,419.22 |
Install MIRL, MITL, PAPI-2, Beacon, Wind Cone & Segmented Circle. |
87-002 |
DYB |
$15,156.60 |
$117,424.26 |
$411,864.88 |
$0.00 |
$544,445.74 |
Land Acquisition and associated cost |
87-001 |
DYB |
$49,077.95 |
$49,077.96 |
$836,973.95 |
$0.00 |
$935,129.86 |
Paving of Runway 5/23, Stub Taxiway and Apron Area. |
86-xx4 |
CKI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
Preliminary engineering design and environmental assessment for a 700'runway extension, including the construction of a 4400' parallel taxiway, and 150'x300' apron expansion; widen & strengthen of runway and safety areas. |
86-xx3 |
UDG |
$45,000.00 |
$0.00 |
$0.00 |
$0.00 |
$45,000.00 |
Construction Of Airport Terminal Building |
86-xx2 |
MNI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$60,000.00 |
Preliminary engineering for runway extension |
86-xx1 |
99N |
$25,000.00 |
$0.00 |
$0.00 |
$0.00 |
$25,000.00 |
Installation of Airfield Lighting |
86-041 |
6J0 |
$1,955.00 |
$1,956.00 |
$35,193.00 |
$0.00 |
$39,104.00 |
Preparation of an Airport Master Plan Study. Phase I-Airport Requirements, Phase II-Site Evaluation, Phase III-Airport Plans, Phase IV-Scheduling and Cost, and Phase V-Miscellaneous Items. |
86-038 |
BBP |
$7,500.00 |
$7,500.00 |
$0.00 |
$0.00 |
$15,000.00 |
Repair of runway surface deterioration occurring in joints or seams resulting from the elements during seventeen years of exposure. |
86-037 |
BBP |
$3,000.00 |
$3,000.00 |
$0.00 |
$0.00 |
$6,000.00 |
Marking of Runway And Taxiway |
86-036 |
AND |
$3,312.50 |
$3,312.50 |
$0.00 |
$0.00 |
$6,625.00 |
Pave Auto Parking Area |
86-034 |
UZA |
$81,000.00 |
$81,000.00 |
$0.00 |
$0.00 |
$162,000.00 |
Installation of Localizer, Equipment needed for a future instrument landing system. |
86-032 |
UZA |
$30,929.92 |
$30,929.92 |
$556,732.00 |
$0.00 |
$618,591.84 |
Site Preparation (clearing & drainage) for Runway 19 Safety Area, and Expand Apron (19,987 SY). (AIP 3-45-0049-02) |
86-031 |
6J0 |
$19,737.90 |
$19,737.90 |
$0.00 |
$0.00 |
$39,475.80 |
Terminal Building - Phase I. |
86-030 |
AND |
$30,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Expand FBO Apron |