Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
87-026 DYB $1,650.00 $1,650.00 $29,704.00 $0.00 $33,004.00 Preparation of Master Plan Study. Phase I - Airport Requirements Phase II - Airport Plans; Phase III - Scheduling and Cost; Phase IV - Miscellaneous Items.
87-025B SPA $1,738.00 $1,738.00 $31,272.00 $0.00 $34,748.00 Update the Airport Layout Plan (ALP).
87-025A SPA $42,645.00 $42,645.00 $767,610.00 $0.00 $852,900.00 Rehabilitation of Runway 4/22 and Obstruction Clearing.
87-024 FLO $6,443.00 $6,443.00 $115,979.00 $0.00 $128,865.00 Part 77 surface clearing on runway 9/27
87-023 OGB $7,515.00 $7,515.00 $135,270.00 $0.00 $150,300.00 Clear obstructions in runway 4 approach, refurbish runway 4/22 medium intensity lights and 36" rotating beacon, and install radio controls for airport lighting system.
87-022 CUB $14,000.00 $14,000.00 $0.00 $0.00 $28,000.00 Updating the Airport Layout Plan (ALP) and other planning documents.
87-021 UZA $30,929.00 $30,834.00 $555,005.00 $0.00 $616,768.00 Construction of a parallel taxiway, repair runway 01/19, and rehabilitation of the medium intensity runway lighting system.
87-019 GMU $7,750.00 $7,750.00 $139,506.00 $0.00 $155,006.00 Replace high intensity lights on Runway 18/36; replace medium intensity taxiway lights on parallel taxiway. Replace omni-directional approach indicator lights, and runway end identifier lights on runway 18/36 replace wind cone and segmented circle.
87-018 0A2 $14,600.00 $14,600.00 $0.00 $0.00 $29,200.00 Approach clearing and obstruction removal in the primary surface areas of runway 10/28, marking power lines, and preliminary engineering design for possible future overlay.
87-016A PYG $2,390.00 $2,390.00 $0.00 $0.00 $4,780.00 Installation of an Non-directional radio beacon (NDB).
87-016 PYG $8,000.00 $8,000.00 $0.00 $0.00 $16,000.00 Installing NDB.
87-015 35A $1,500.00 $1,500.00 $0.00 $0.00 $3,000.00 Purchase six (6) OSHA approved fire fighting suits for the Southside Fire Department as they are responsible for providing fire protection.
87-013A ARW $15,000.00 $15,000.00 $0.00 $0.00 $30,000.00 Terminal Building Construction
87-013 ARW $80,000.00 $80,000.00 $0.00 $0.00 $160,000.00 Design, develop and construct a terminal building.
87-011 HXD $0.00 $13,600.00 $244,800.00 $0.00 $258,400.00 Crash/Fire/Rescue Station, Rapid Intervention Fire Truck and 36" Rotating Beacon with Tower. AIP Project 3-45=0030-02
87-010A SMS $47,690.00 $48,000.00 $42,310.00 $0.00 $138,000.00 Construction of a 700' runway extension to runway 4/22 including medium intensity runway lights and connecting parallel taxiway with lights. Master Plan Update.
87-010 SMS $23,506.00 $23,506.00 $423,103.00 $0.00 $470,115.00 (1) Construct 700' Runway Extension & parallel Taxiway with medium intensity runway and taxiway lights. (2) Master Plan Update
87-009 SMS $11,650.00 $11,650.00 $209,700.00 $0.00 $233,000.00 (1) Acquire Clear Zone Land for Runway 4-22 Extension. (2)Environmental Assessment of Runway Extension.
87-004 DYB $31,292.59 $35,638.44 $641,492.04 $0.00 $708,423.08 Site Preparation for General Utility Runway, Stub taxiway, and Apron Area.
87-003 DYB $5,870.96 $5,870.96 $105,677.30 $0.00 $117,419.22 Install MIRL, MITL, PAPI-2, Beacon, Wind Cone & Segmented Circle.