South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
86-027 AND $20,333.34 $20,333.34 $366,029.00 $0.00 $406,695.70 1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp
86-023 RBW $52,500.00 $52,500.00 $0.00 $0.00 $105,000.00 Repair and Sealing of Cracks in Runway 9/27, soil sterilization of pavement edges on Runway 17/35, and resealing of joints in concrete apron.
86-013 6J0 $33,812.00 $33,814.00 $281,055.00 $0.00 $348,681.00 Construct apron, connect taxiway turn around, edge lighting installation of runway and taxiway and installation of lighted wind cone and rotating beacon.
86-012 GMU $15,000.00 $15,000.00 $0.00 $0.00 $30,000.00 Routing and sealing of cracks in asphalt on Runway 18-36 and Runway 9-27, and the associated parallel taxiways
86-011 HXD $4,350.00 $4,350.00 $0.00 $0.00 $8,700.00 1. Resealing of runway overruns (300'x75') x 2 (600'x75') 2. Remarking of runway overruns from relocated to displaced
86-008 AIK $28,068.00 $28,069.00 $505,240.00 $0.00 $561,377.00 Update the airport layout plan, construct 4,600 x 35' parallel taxiway, and a connecting taxiway.
86-007 HYW $4,505.00 $4,505.00 $0.00 $0.00 $9,010.00 Apron Lighting & Taxiway Marking
86-006 UDG $5,145.00 $5,145.00 $0.00 $0.00 $10,290.00 Purchase and installation of a non-directional beacon
86-004 LKR $54,000.00 $54,000.00 $0.00 $0.00 $108,000.00 Construct apron and drainage improvements around T-Hangars, crack seal RWY 6/24 and apron. Paint rotating beacon, remark runway numerals. Reconstruct concrete apron in front of FBO hangar.
86-003 OGB $6,725.00 $6,725.00 $0.00 $0.00 $13,450.00 Relocate NDB
86-001 GMU $15,000.00 $15,000.00 $244,150.00 $0.00 $274,150.00 Strengthen and seal terminal apron; strengthen FBO apron; strengthen connecting taxiway; install 4' wooden boundary fence in ILS approach area.
85-XX2 HVS $25,000.00 $0.00 $0.00 $0.00 $25,000.00 Miscellaneous airport improvements- clearing and grubbing, fencing, terminal repair, and roofing T-hangars.
85-XX1 AQX $75,000.00 $150,000.00 $0.00 $0.00 $225,000.00 1800' Rwy extension
85-035 5J9 $15,145.40 $15,145.40 $0.00 $0.00 $30,290.80 Rehabilitation of runway by routing and sealing the cracks. Then applying two coats of a sand slurry sealant.
85-032A HVS $2,096.91 $2,096.91 $0.00 $0.00 $4,193.82 Installation of a PAPI II System on Runway 2 (Amendment)
85-032 HVS $7,423.95 $7,423.95 $71,000.00 $0.00 $85,847.90 Medium Intensity Lighting System, Rotating Beacon, PAPI, Rehabilitation of miscellaneous electrical needs.
85-031 AIK $23,992.00 $23,992.00 $0.00 $0.00 $47,984.00 Clean and seal cracks in runway 18/36.
85-029 DCM $18,250.00 $18,250.00 $272,700.00 $0.00 $309,200.00 Building a portion of parallel taxiway to replace old taxiway and associated stub taxiway.
85-025 SPA $31,534.55 $31,534.55 $429,000.00 $0.00 $492,069.10 Twy. "B" reconstruct Twys. "E" & "A" (Sta. 0+75 to Sta. 12+00) and strengthen Twy. "F" (Sta. 0+75 to Sta. 3+50), Twy. "A" (Sta. 12+00 to Sta. 23+60) and the intersection of Rwy. 11-29 & Twy. "C" including misc. grading & drainage-North of Twy. "B".
85-021 AND $3,200.00 $3,200.00 $55,800.00 $0.00 $62,200.00 Installation of a medium intensity runway edge lighting system on runway 5-23, installation of vault equipment and misc. airfield lighting cable and rehabilitation of existing airport rotating beacon.