86-027 |
AND |
$20,333.34 |
$20,333.34 |
$366,029.00 |
$0.00 |
$406,695.70 |
1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp |
86-023 |
RBW |
$52,500.00 |
$52,500.00 |
$0.00 |
$0.00 |
$105,000.00 |
Repair and Sealing of Cracks in Runway 9/27, soil sterilization of pavement edges on Runway 17/35, and resealing of joints in concrete apron. |
86-013 |
6J0 |
$33,812.00 |
$33,814.00 |
$281,055.00 |
$0.00 |
$348,681.00 |
Construct apron, connect taxiway turn around, edge lighting installation of runway and taxiway and installation of lighted wind cone and rotating beacon. |
86-012 |
GMU |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Routing and sealing of cracks in asphalt on Runway 18-36 and Runway 9-27, and the associated parallel taxiways |
86-011 |
HXD |
$4,350.00 |
$4,350.00 |
$0.00 |
$0.00 |
$8,700.00 |
1. Resealing of runway overruns (300'x75') x 2 (600'x75') 2. Remarking of runway overruns from relocated to displaced |
86-008 |
AIK |
$28,068.00 |
$28,069.00 |
$505,240.00 |
$0.00 |
$561,377.00 |
Update the airport layout plan, construct 4,600 x 35' parallel taxiway, and a connecting taxiway. |
86-007 |
HYW |
$4,505.00 |
$4,505.00 |
$0.00 |
$0.00 |
$9,010.00 |
Apron Lighting & Taxiway Marking |
86-006 |
UDG |
$5,145.00 |
$5,145.00 |
$0.00 |
$0.00 |
$10,290.00 |
Purchase and installation of a non-directional beacon |
86-004 |
LKR |
$54,000.00 |
$54,000.00 |
$0.00 |
$0.00 |
$108,000.00 |
Construct apron and drainage improvements around T-Hangars, crack seal RWY 6/24 and apron. Paint rotating beacon, remark runway numerals. Reconstruct concrete apron in front of FBO hangar. |
86-003 |
OGB |
$6,725.00 |
$6,725.00 |
$0.00 |
$0.00 |
$13,450.00 |
Relocate NDB |
86-001 |
GMU |
$15,000.00 |
$15,000.00 |
$244,150.00 |
$0.00 |
$274,150.00 |
Strengthen and seal terminal apron; strengthen FBO apron; strengthen connecting taxiway; install 4' wooden boundary fence in ILS approach area. |
85-XX2 |
HVS |
$25,000.00 |
$0.00 |
$0.00 |
$0.00 |
$25,000.00 |
Miscellaneous airport improvements- clearing and grubbing, fencing, terminal repair, and roofing T-hangars. |
85-XX1 |
AQX |
$75,000.00 |
$150,000.00 |
$0.00 |
$0.00 |
$225,000.00 |
1800' Rwy extension |
85-035 |
5J9 |
$15,145.40 |
$15,145.40 |
$0.00 |
$0.00 |
$30,290.80 |
Rehabilitation of runway by routing and sealing the cracks. Then applying two coats of a sand slurry sealant. |
85-032A |
HVS |
$2,096.91 |
$2,096.91 |
$0.00 |
$0.00 |
$4,193.82 |
Installation of a PAPI II System on Runway 2 (Amendment) |
85-032 |
HVS |
$7,423.95 |
$7,423.95 |
$71,000.00 |
$0.00 |
$85,847.90 |
Medium Intensity Lighting System, Rotating Beacon, PAPI, Rehabilitation of miscellaneous electrical needs. |
85-031 |
AIK |
$23,992.00 |
$23,992.00 |
$0.00 |
$0.00 |
$47,984.00 |
Clean and seal cracks in runway 18/36. |
85-029 |
DCM |
$18,250.00 |
$18,250.00 |
$272,700.00 |
$0.00 |
$309,200.00 |
Building a portion of parallel taxiway to replace old taxiway and associated stub taxiway. |
85-025 |
SPA |
$31,534.55 |
$31,534.55 |
$429,000.00 |
$0.00 |
$492,069.10 |
Twy. "B" reconstruct Twys. "E" & "A" (Sta. 0+75 to Sta. 12+00) and strengthen Twy. "F" (Sta. 0+75 to Sta. 3+50), Twy. "A" (Sta. 12+00 to Sta. 23+60) and the intersection of Rwy. 11-29 & Twy. "C" including misc. grading & drainage-North of Twy. "B". |
85-021 |
AND |
$3,200.00 |
$3,200.00 |
$55,800.00 |
$0.00 |
$62,200.00 |
Installation of a medium intensity runway edge lighting system on runway 5-23, installation of vault equipment and misc. airfield lighting cable and rehabilitation of existing airport rotating beacon. |