87-002 |
DYB |
$15,156.60 |
$117,424.26 |
$411,864.88 |
$0.00 |
$544,445.74 |
Land Acquisition and associated cost |
87-001 |
DYB |
$49,077.95 |
$49,077.96 |
$836,973.95 |
$0.00 |
$935,129.86 |
Paving of Runway 5/23, Stub Taxiway and Apron Area. |
86-xx4 |
CKI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
Preliminary engineering design and environmental assessment for a 700'runway extension, including the construction of a 4400' parallel taxiway, and 150'x300' apron expansion; widen & strengthen of runway and safety areas. |
86-xx3 |
UDG |
$45,000.00 |
$0.00 |
$0.00 |
$0.00 |
$45,000.00 |
Construction Of Airport Terminal Building |
86-xx2 |
MNI |
$60,000.00 |
$0.00 |
$0.00 |
$0.00 |
$60,000.00 |
Preliminary engineering for runway extension |
86-xx1 |
99N |
$25,000.00 |
$0.00 |
$0.00 |
$0.00 |
$25,000.00 |
Installation of Airfield Lighting |
86-041 |
6J0 |
$1,955.00 |
$1,956.00 |
$35,193.00 |
$0.00 |
$39,104.00 |
Preparation of an Airport Master Plan Study. Phase I-Airport Requirements, Phase II-Site Evaluation, Phase III-Airport Plans, Phase IV-Scheduling and Cost, and Phase V-Miscellaneous Items. |
86-038 |
BBP |
$7,500.00 |
$7,500.00 |
$0.00 |
$0.00 |
$15,000.00 |
Repair of runway surface deterioration occurring in joints or seams resulting from the elements during seventeen years of exposure. |
86-037 |
BBP |
$3,000.00 |
$3,000.00 |
$0.00 |
$0.00 |
$6,000.00 |
Marking of Runway And Taxiway |
86-036 |
AND |
$3,312.50 |
$3,312.50 |
$0.00 |
$0.00 |
$6,625.00 |
Pave Auto Parking Area |
86-034 |
UZA |
$81,000.00 |
$81,000.00 |
$0.00 |
$0.00 |
$162,000.00 |
Installation of Localizer, Equipment needed for a future instrument landing system. |
86-032 |
UZA |
$30,929.92 |
$30,929.92 |
$556,732.00 |
$0.00 |
$618,591.84 |
Site Preparation (clearing & drainage) for Runway 19 Safety Area, and Expand Apron (19,987 SY). (AIP 3-45-0049-02) |
86-031 |
6J0 |
$19,737.90 |
$19,737.90 |
$0.00 |
$0.00 |
$39,475.80 |
Terminal Building - Phase I. |
86-030 |
AND |
$30,000.00 |
$30,000.00 |
$0.00 |
$0.00 |
$60,000.00 |
Expand FBO Apron |
86-027 |
AND |
$20,333.34 |
$20,333.34 |
$366,029.00 |
$0.00 |
$406,695.70 |
1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp |
86-023 |
RBW |
$52,500.00 |
$52,500.00 |
$0.00 |
$0.00 |
$105,000.00 |
Repair and Sealing of Cracks in Runway 9/27, soil sterilization of pavement edges on Runway 17/35, and resealing of joints in concrete apron. |
86-013 |
6J0 |
$33,812.00 |
$33,814.00 |
$281,055.00 |
$0.00 |
$348,681.00 |
Construct apron, connect taxiway turn around, edge lighting installation of runway and taxiway and installation of lighted wind cone and rotating beacon. |
86-012 |
GMU |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Routing and sealing of cracks in asphalt on Runway 18-36 and Runway 9-27, and the associated parallel taxiways |
86-011 |
HXD |
$4,350.00 |
$4,350.00 |
$0.00 |
$0.00 |
$8,700.00 |
1. Resealing of runway overruns (300'x75') x 2 (600'x75') 2. Remarking of runway overruns from relocated to displaced |
86-008 |
AIK |
$28,068.00 |
$28,069.00 |
$505,240.00 |
$0.00 |
$561,377.00 |
Update the airport layout plan, construct 4,600 x 35' parallel taxiway, and a connecting taxiway. |