Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
83-009 S19 $30,000.00 $30,000.00 $0.00 $0.00 $60,000.00 Medium intensity airport lighting system including 10" rotating beacon, and lighted wind cone.
83-007 5J9 $21,232.03 $21,232.03 $0.00 $0.00 $42,464.06 700' Runway Extension.
83-005 SMS $3,764.02 $3,764.02 $67,752.36 $0.00 $75,280.39 Rehabilitation of the medium intensity runway and taxiway lighting system to bring the system up to current FAA standards.
83-002 MAO $17,175.00 $17,175.00 $309,150.00 $0.00 $343,500.00 A. Repair & overlay runways, taxiway, turnarounds & apron. B. Remark all pavements. C. Relocate wind cone & segmented circle. D. Extend runway safety overruns.
83-001 LQK $3,298.25 $3,298.25 $59,368.50 $0.00 $65,965.00 Rehabilitation of the Runway and Taxiway Lighting System.
82-009 AIK $40,169.65 $40,169.65 $525,586.00 $0.00 $605,925.30 Rehabilitation of runway 6-24, relocate medium intensity runway lights, and markings.
82-007 JZI $19,388.90 $19,388.90 $349,000.20 $0.00 $387,778.00 Construct a new partial parallel taxiway to runway 9/27 and storm drainage system repairs. Installation of new medium intensity runway lighting system for runway 9/27
82-006 GSP $26,405.00 $26,405.00 $475,290.00 $0.00 $528,100.00 New General Aviation ramp and taxiway
82-001 LKR $35,000.00 $35,000.00 $0.00 $0.00 $70,000.00 Erosion repair and earth moving.
81-017 BBP $100,000.00 $100,000.00 $0.00 $0.00 $200,000.00 Construction of terminal building.
81-016 S19 $32,770.00 $32,770.00 $0.00 $0.00 $65,540.00 Airport Terminal Building
81-015 99N $125,000.00 $125,000.00 $0.00 $0.00 $250,000.00 Construction of 3600' x 60' paved runway, stub taxiway, and apron.
81-013 LUX $35,702.83 $35,702.83 $0.00 $0.00 $71,405.66 Construction of Terminal Building
81-009 CUB $2,000,000.00 $2,000,000.00 $0.00 $0.00 $4,000,000.00 Construction of new runway, taxiways, terminal building, fuel farm, and related site improvements.
81-005 GSP $15,880.00 $15,881.00 $285,847.00 $0.00 $317,608.00 Preliminary engineering/project formulation, final design and construction inspection and construction of runway and taxiway edge lighting systems.
81-004 38J $12,000.00 $12,000.00 $0.00 $0.00 $24,000.00 Fencing - 8200 linear feet with number 9 gauge chain link with four (4) walk-thru and one (1) drive-thru gate.
81-003A S19 $3,965.50 $3,965.00 $0.00 $0.00 $7,930.50 Construction inspection and testing
81-003 S19 $96,670.00 $96,670.00 $0.00 $0.00 $193,340.00 Paving 3600 feet of runway, stub taxiway and parking apron.
81-002 SPA $1,900.00 $1,900.00 $0.00 $0.00 $3,800.00 Numerous trees...Rwy 11...Rwy threshold temporarily displaced 1,003'. ...In addition, eight new threshold lights (MIRL) in-stalled and coloration of 16 other lights changed. (partial description)
81-001 UDG $125,000.00 $125,000.00 $0.00 $0.00 $250,000.00 Asphalt overlay of Runway 5/23, Stub taxiway and apron.