80-014 |
LKR |
$42,455.00 |
$42,455.00 |
$0.00 |
$0.00 |
$84,910.00 |
Acquire aviation easements over non-owned property and on county property; clearing of acquired property, engineering and appraisal costs related to this project. |
80-013 |
FLO |
$2,425.00 |
$2,425.00 |
$43,650.00 |
$0.00 |
$48,500.00 |
VASI-4 for Rwy 9; Supplemental wind cones (Runways 9/27 & 18/36); Security gate controls; Taxiway guidance signs & 24" rotating beacon. |
80-012 |
SPA |
$39,768.00 |
$39,768.00 |
$0.00 |
$0.00 |
$79,536.00 |
Airport development, clear zones Runway 4/22, install REILS, runway 22, relocate wind cone and segmented circle, install radio controller for MALS/RAILS system. |
80-011 |
SPA |
$5,150.00 |
$5,150.00 |
$0.00 |
$0.00 |
$10,300.00 |
Erosion control and beautification of approximate nine acres. |
80-010 |
FLO |
$33,100.00 |
$33,100.00 |
$595,800.00 |
$0.00 |
$662,000.00 |
Rehabilitate, overlay runway 9/27. |
80-009 |
ARW |
$55,141.00 |
$47,789.03 |
$410,766.17 |
$0.00 |
$513,696.20 |
Final grading, paving and marking, and lighting for a realigned runway, (3000' ADAP eligible and 430' Non-ADAP eligible) turn-around, and stub taxiway; installation of rotating beacon, lighted wind cone, segmented circle & utilities relocation. |
80-008 |
GSP |
$25,000.00 |
$25,000.00 |
$0.00 |
$0.00 |
$50,000.00 |
Security Fencing |
80-007 |
CDN |
$24,969.00 |
$24,969.00 |
$449,448.00 |
$0.00 |
$499,386.00 |
Overlay a section of RWY 5/23, apron and security fencing |
80-006A |
CQW |
$3,132.87 |
$2,860.54 |
$51,489.72 |
$0.00 |
$57,483.13 |
Easement Acquisition and Obstruction Clearing in Clear Zone and Transitional surfaces to Runway 7-25. (Amendment) |
80-0060 |
CQW |
$3,225.00 |
$3,225.00 |
$58,050.00 |
$0.00 |
$64,500.00 |
Land clearing for clear zones and transitional surfaces. |
80-006 |
RBW |
$6,595.65 |
$5,853.50 |
$105,363.00 |
$0.00 |
$117,812.15 |
Runway approach clearing (5/23 & 9/27) ADAP 5-45-0057-02; runway approach clearing - non-ADAP. |
80-004 |
GSP |
$75,075.74 |
$75,074.74 |
$0.00 |
$0.00 |
$150,150.48 |
Hillside removal for CAT II operations, runway grooving |
80-002 |
CEU |
$145,709.00 |
$145,709.00 |
$0.00 |
$0.00 |
$291,418.00 |
Grade and pave 1000' runway extension, apron expansion, grade and pave parallel taxiway, install MIRL, MITL and VASI-4. |
79-050 |
SPA |
$2,800.00 |
$2,800.00 |
$0.00 |
$0.00 |
$5,600.00 |
To establish vegetation in the area cleared for the FAA MALS/RAIL system which is associated with the partial instrument landing system. |