80-029 |
BNL |
$7,538.00 |
$17,494.00 |
$60,306.00 |
$0.00 |
$85,338.00 |
Relocation of Medium Intensity Runway lights on Runway 16/34 and Installation of Safety Fencing. |
80-028 |
BNL |
$19,855.00 |
$19,855.00 |
$303,604.00 |
$0.00 |
$343,314.00 |
Resurface runway 16/34 |
80-027 |
JZI |
$34,000.00 |
$34,000.00 |
$0.00 |
$0.00 |
$68,000.00 |
Emergency repairs to taxiway pavement surfaces and deteriorated areas of drainage systems around and beneath these taxiways. |
80-026 |
CAE |
$5,682.43 |
$5,682.43 |
$102,283.74 |
$0.00 |
$113,648.60 |
Grooving Runway 11/29 and reconstruction and strengthening of runway 5/23. |
80-025 |
CAE |
$40,828.98 |
$40,828.98 |
$81,657.96 |
$0.00 |
$163,315.92 |
Installation of concourse elevators for the handicapped. |
80-024 |
DCM |
$51,181.80 |
$51,181.80 |
$409,454.40 |
$0.00 |
$511,818.00 |
Reconstruct and mark runway 17/35, install MIRL, relocate and install new beacon, install segmented circle, wind cone and install non-directional beacon. |
80-023 |
CKI |
$63,000.00 |
$33,000.00 |
$0.00 |
$0.00 |
$96,000.00 |
Construction of Terminal Building |
80-022 |
AND |
$16,500.00 |
$16,500.00 |
$0.00 |
$0.00 |
$0.00 |
Install taxiway marker and identifier lights. |
80-020 |
GYH |
$195,000.00 |
$195,000.00 |
$0.00 |
$0.00 |
$0.00 |
Purchase and installation of an instrument landing system for runway 4. |
80-019 |
FLO |
$15,038.00 |
$0.00 |
$0.00 |
$0.00 |
$15,038.00 |
Strengthen taxiways "G", "J", "K" and a portion of Twy "B". |
80-018 |
52J |
$13,115.00 |
$13,115.00 |
$0.00 |
$0.00 |
$26,230.00 |
Clearing of approaches and transitional surfaces. |
80-017 |
SMS |
$16,560.00 |
$20,460.00 |
$333,180.00 |
$0.00 |
$370,200.00 |
A. Easement acquisition for clear zones & transitional surfaces to runway 4-22; B. Clearing in clear zones and transitional surfaces; C. Rehabilitation of drainage systems; D. Extend runway safety areas. |
80-016 |
GSP |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Clearing and grubbing for installation of MALS/RAILS on runway 21, to include approximately 300' of security fencing for the light lane. |
80-015 |
51J |
$150,000.00 |
$150,000.00 |
$0.00 |
$0.00 |
$300,000.00 |
Strip, repair and resurface runway and turnaround areas, widen runway by 15', extend runway 700'x75'; seal existing apron, construct stub taxiway, lighting system and install NDB. |
80-014 |
LKR |
$42,455.00 |
$42,455.00 |
$0.00 |
$0.00 |
$84,910.00 |
Acquire aviation easements over non-owned property and on county property; clearing of acquired property, engineering and appraisal costs related to this project. |
80-013 |
FLO |
$2,425.00 |
$2,425.00 |
$43,650.00 |
$0.00 |
$48,500.00 |
VASI-4 for Rwy 9; Supplemental wind cones (Runways 9/27 & 18/36); Security gate controls; Taxiway guidance signs & 24" rotating beacon. |
80-012 |
SPA |
$39,768.00 |
$39,768.00 |
$0.00 |
$0.00 |
$79,536.00 |
Airport development, clear zones Runway 4/22, install REILS, runway 22, relocate wind cone and segmented circle, install radio controller for MALS/RAILS system. |
80-011 |
SPA |
$5,150.00 |
$5,150.00 |
$0.00 |
$0.00 |
$10,300.00 |
Erosion control and beautification of approximate nine acres. |
80-010 |
FLO |
$33,100.00 |
$33,100.00 |
$595,800.00 |
$0.00 |
$662,000.00 |
Rehabilitate, overlay runway 9/27. |
80-009 |
ARW |
$55,141.00 |
$47,789.03 |
$410,766.17 |
$0.00 |
$513,696.20 |
Final grading, paving and marking, and lighting for a realigned runway, (3000' ADAP eligible and 430' Non-ADAP eligible) turn-around, and stub taxiway; installation of rotating beacon, lighted wind cone, segmented circle & utilities relocation. |