Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
80-029 BNL $7,538.00 $17,494.00 $60,306.00 $0.00 $85,338.00 Relocation of Medium Intensity Runway lights on Runway 16/34 and Installation of Safety Fencing.
80-028 BNL $19,855.00 $19,855.00 $303,604.00 $0.00 $343,314.00 Resurface runway 16/34
80-027 JZI $34,000.00 $34,000.00 $0.00 $0.00 $68,000.00 Emergency repairs to taxiway pavement surfaces and deteriorated areas of drainage systems around and beneath these taxiways.
80-026 CAE $5,682.43 $5,682.43 $102,283.74 $0.00 $113,648.60 Grooving Runway 11/29 and reconstruction and strengthening of runway 5/23.
80-025 CAE $40,828.98 $40,828.98 $81,657.96 $0.00 $163,315.92 Installation of concourse elevators for the handicapped.
80-024 DCM $51,181.80 $51,181.80 $409,454.40 $0.00 $511,818.00 Reconstruct and mark runway 17/35, install MIRL, relocate and install new beacon, install segmented circle, wind cone and install non-directional beacon.
80-023 CKI $63,000.00 $33,000.00 $0.00 $0.00 $96,000.00 Construction of Terminal Building
80-022 AND $16,500.00 $16,500.00 $0.00 $0.00 $0.00 Install taxiway marker and identifier lights.
80-020 GYH $195,000.00 $195,000.00 $0.00 $0.00 $0.00 Purchase and installation of an instrument landing system for runway 4.
80-019 FLO $15,038.00 $0.00 $0.00 $0.00 $15,038.00 Strengthen taxiways "G", "J", "K" and a portion of Twy "B".
80-018 52J $13,115.00 $13,115.00 $0.00 $0.00 $26,230.00 Clearing of approaches and transitional surfaces.
80-017 SMS $16,560.00 $20,460.00 $333,180.00 $0.00 $370,200.00 A. Easement acquisition for clear zones & transitional surfaces to runway 4-22; B. Clearing in clear zones and transitional surfaces; C. Rehabilitation of drainage systems; D. Extend runway safety areas.
80-016 GSP $10,000.00 $10,000.00 $0.00 $0.00 $20,000.00 Clearing and grubbing for installation of MALS/RAILS on runway 21, to include approximately 300' of security fencing for the light lane.
80-015 51J $150,000.00 $150,000.00 $0.00 $0.00 $300,000.00 Strip, repair and resurface runway and turnaround areas, widen runway by 15', extend runway 700'x75'; seal existing apron, construct stub taxiway, lighting system and install NDB.
80-014 LKR $42,455.00 $42,455.00 $0.00 $0.00 $84,910.00 Acquire aviation easements over non-owned property and on county property; clearing of acquired property, engineering and appraisal costs related to this project.
80-013 FLO $2,425.00 $2,425.00 $43,650.00 $0.00 $48,500.00 VASI-4 for Rwy 9; Supplemental wind cones (Runways 9/27 & 18/36); Security gate controls; Taxiway guidance signs & 24" rotating beacon.
80-012 SPA $39,768.00 $39,768.00 $0.00 $0.00 $79,536.00 Airport development, clear zones Runway 4/22, install REILS, runway 22, relocate wind cone and segmented circle, install radio controller for MALS/RAILS system.
80-011 SPA $5,150.00 $5,150.00 $0.00 $0.00 $10,300.00 Erosion control and beautification of approximate nine acres.
80-010 FLO $33,100.00 $33,100.00 $595,800.00 $0.00 $662,000.00 Rehabilitate, overlay runway 9/27.
80-009 ARW $55,141.00 $47,789.03 $410,766.17 $0.00 $513,696.20 Final grading, paving and marking, and lighting for a realigned runway, (3000' ADAP eligible and 430' Non-ADAP eligible) turn-around, and stub taxiway; installation of rotating beacon, lighted wind cone, segmented circle & utilities relocation.