82-007 |
JZI |
$19,388.90 |
$19,388.90 |
$349,000.20 |
$0.00 |
$387,778.00 |
Construct a new partial parallel taxiway to runway 9/27 and storm drainage system repairs. Installation of new medium intensity runway lighting system for runway 9/27 |
82-006 |
GSP |
$26,405.00 |
$26,405.00 |
$475,290.00 |
$0.00 |
$528,100.00 |
New General Aviation ramp and taxiway |
82-001 |
LKR |
$35,000.00 |
$35,000.00 |
$0.00 |
$0.00 |
$70,000.00 |
Erosion repair and earth moving. |
81-017 |
BBP |
$100,000.00 |
$100,000.00 |
$0.00 |
$0.00 |
$200,000.00 |
Construction of terminal building. |
81-016 |
S19 |
$32,770.00 |
$32,770.00 |
$0.00 |
$0.00 |
$65,540.00 |
Airport Terminal Building |
81-015 |
99N |
$125,000.00 |
$125,000.00 |
$0.00 |
$0.00 |
$250,000.00 |
Construction of 3600' x 60' paved runway, stub taxiway, and apron. |
81-013 |
LUX |
$35,702.83 |
$35,702.83 |
$0.00 |
$0.00 |
$71,405.66 |
Construction of Terminal Building |
81-009 |
CUB |
$2,000,000.00 |
$2,000,000.00 |
$0.00 |
$0.00 |
$4,000,000.00 |
Construction of new runway, taxiways, terminal building, fuel farm, and related site improvements. |
81-005 |
GSP |
$15,880.00 |
$15,881.00 |
$285,847.00 |
$0.00 |
$317,608.00 |
Preliminary engineering/project formulation, final design and construction inspection and construction of runway and taxiway edge lighting systems. |
81-004 |
38J |
$12,000.00 |
$12,000.00 |
$0.00 |
$0.00 |
$24,000.00 |
Fencing - 8200 linear feet with number 9 gauge chain link with four (4) walk-thru and one (1) drive-thru gate. |
81-003A |
S19 |
$3,965.50 |
$3,965.00 |
$0.00 |
$0.00 |
$7,930.50 |
Construction inspection and testing |
81-003 |
S19 |
$96,670.00 |
$96,670.00 |
$0.00 |
$0.00 |
$193,340.00 |
Paving 3600 feet of runway, stub taxiway and parking apron. |
81-002 |
SPA |
$1,900.00 |
$1,900.00 |
$0.00 |
$0.00 |
$3,800.00 |
Numerous trees...Rwy 11...Rwy threshold temporarily displaced 1,003'. ...In addition, eight new threshold lights (MIRL) in-stalled and coloration of 16 other lights changed. (partial description) |
81-001 |
UDG |
$125,000.00 |
$125,000.00 |
$0.00 |
$0.00 |
$250,000.00 |
Asphalt overlay of Runway 5/23, Stub taxiway and apron. |
80-036 |
SMS |
$20,750.00 |
$20,750.00 |
$373,500.00 |
$0.00 |
$415,000.00 |
Strengthen Runway 4/22, Partial parallel and connecting taxiways and apron. |
80-034 |
SPA |
$9,957.11 |
$9,957.11 |
$179,228.00 |
$0.00 |
$199,142.22 |
Strengthen apron and taxiways C and D, install safety fencing approximate 15,830', install four additional threshold lights on runway 4/22. |
80-033 |
GMU |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Construct By-pass Taxiway Runway 36 |
80-032 |
MYR |
$26,287.00 |
$26,288.00 |
$210,301.00 |
$0.00 |
$262,876.00 |
Expansion of the Myrtle Beach Jetport aircraft parking apron. |
80-031 |
MYR |
$46,933.50 |
$46,933.50 |
$0.00 |
$0.00 |
$93,867.00 |
Expansion of baggage claim area. |
80-030 |
HYW |
$12,500.00 |
$12,500.00 |
$0.00 |
$0.00 |
$25,000.00 |
Paving of 2000' access road. |