80-036 |
SMS |
$20,750.00 |
$20,750.00 |
$373,500.00 |
$0.00 |
$415,000.00 |
Strengthen Runway 4/22, Partial parallel and connecting taxiways and apron. |
80-034 |
SPA |
$9,957.11 |
$9,957.11 |
$179,228.00 |
$0.00 |
$199,142.22 |
Strengthen apron and taxiways C and D, install safety fencing approximate 15,830', install four additional threshold lights on runway 4/22. |
80-033 |
GMU |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Construct By-pass Taxiway Runway 36 |
80-032 |
MYR |
$26,287.00 |
$26,288.00 |
$210,301.00 |
$0.00 |
$262,876.00 |
Expansion of the Myrtle Beach Jetport aircraft parking apron. |
80-031 |
MYR |
$46,933.50 |
$46,933.50 |
$0.00 |
$0.00 |
$93,867.00 |
Expansion of baggage claim area. |
80-030 |
HYW |
$12,500.00 |
$12,500.00 |
$0.00 |
$0.00 |
$25,000.00 |
Paving of 2000' access road. |
80-029 |
BNL |
$7,538.00 |
$17,494.00 |
$60,306.00 |
$0.00 |
$85,338.00 |
Relocation of Medium Intensity Runway lights on Runway 16/34 and Installation of Safety Fencing. |
80-028 |
BNL |
$19,855.00 |
$19,855.00 |
$303,604.00 |
$0.00 |
$343,314.00 |
Resurface runway 16/34 |
80-027 |
JZI |
$34,000.00 |
$34,000.00 |
$0.00 |
$0.00 |
$68,000.00 |
Emergency repairs to taxiway pavement surfaces and deteriorated areas of drainage systems around and beneath these taxiways. |
80-026 |
CAE |
$5,682.43 |
$5,682.43 |
$102,283.74 |
$0.00 |
$113,648.60 |
Grooving Runway 11/29 and reconstruction and strengthening of runway 5/23. |
80-025 |
CAE |
$40,828.98 |
$40,828.98 |
$81,657.96 |
$0.00 |
$163,315.92 |
Installation of concourse elevators for the handicapped. |
80-024 |
DCM |
$51,181.80 |
$51,181.80 |
$409,454.40 |
$0.00 |
$511,818.00 |
Reconstruct and mark runway 17/35, install MIRL, relocate and install new beacon, install segmented circle, wind cone and install non-directional beacon. |
80-023 |
CKI |
$63,000.00 |
$33,000.00 |
$0.00 |
$0.00 |
$96,000.00 |
Construction of Terminal Building |
80-022 |
AND |
$16,500.00 |
$16,500.00 |
$0.00 |
$0.00 |
$0.00 |
Install taxiway marker and identifier lights. |
80-020 |
GYH |
$195,000.00 |
$195,000.00 |
$0.00 |
$0.00 |
$0.00 |
Purchase and installation of an instrument landing system for runway 4. |
80-019 |
FLO |
$15,038.00 |
$0.00 |
$0.00 |
$0.00 |
$15,038.00 |
Strengthen taxiways "G", "J", "K" and a portion of Twy "B". |
80-018 |
52J |
$13,115.00 |
$13,115.00 |
$0.00 |
$0.00 |
$26,230.00 |
Clearing of approaches and transitional surfaces. |
80-017 |
SMS |
$16,560.00 |
$20,460.00 |
$333,180.00 |
$0.00 |
$370,200.00 |
A. Easement acquisition for clear zones & transitional surfaces to runway 4-22; B. Clearing in clear zones and transitional surfaces; C. Rehabilitation of drainage systems; D. Extend runway safety areas. |
80-016 |
GSP |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Clearing and grubbing for installation of MALS/RAILS on runway 21, to include approximately 300' of security fencing for the light lane. |
80-015 |
51J |
$150,000.00 |
$150,000.00 |
$0.00 |
$0.00 |
$300,000.00 |
Strip, repair and resurface runway and turnaround areas, widen runway by 15', extend runway 700'x75'; seal existing apron, construct stub taxiway, lighting system and install NDB. |