Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
85-019 UZA $27,667.00 $27,667.00 $498,000.00 $0.00 $553,334.00 Construction of Safety Area, Relocation of Road, Electrical Vault. (AIP NO. 3-45-0049-03)
85-018 CDN $8,522.82 $8,522.83 $124,824.15 $0.00 $141,869.79 Reconstruct a portion of the airport drainage; update airport layout plans, airport boundary survey with corner monuments.
85-013 GRD $21,000.00 $29,500.00 $53,325.00 $0.00 $103,825.00 Installation of taxiway lighting.
85-010 3J1 $4,769.00 $4,769.00 $0.00 $0.00 $9,538.00 Environmental Assessment for New Runway
85-009 UZA $18,762.00 $18,762.00 $253,543.00 $0.00 $291,067.00 Airfield Drainage Improvements & Stub Taxiway. (portion of AIP 3-45-0049-01).
85-005 GMU $22,900.00 $22,900.00 $412,200.00 $0.00 $458,000.00 Extend Runway 36 Safety Area (100'x500'): Install taxiway guidance signs; remove excess pavement, realign taxiway lights, and associated items.
85-003A FLO $5,427.61 $0.00 $0.00 $0.00 $0.00 Emergency rehab of HIRL on R/W 9-27 and MITL on Taxiways "B","G","D" and "E". Repairs to Taxiway "E", G.A. Apron and Airfield drainage and associated obstruction clearing. AMENDMENT
85-003 FLO $23,147.00 $34,001.12 $514,333.17 $0.00 $571,481.29 Emergency rehab of HIRL on R/W 9-27 and MITL on Taxiways "B","G","D" and "E". Repairs to Taxiway "E", G.A. Apron and Airfield drainage and associated obstruction clearing.
85-002 RBW $26,263.00 $52,431.00 $472,734.00 $0.00 $551,428.00 Rehabilitation of Runway 5/23.
85-001 BNL $24,405.00 $25,596.00 $0.00 $0.00 $50,001.00 Repair of Aircraft Apron, Line-of-sight clearance, Terminal Building Expansion and Relocate Fuel Pump.
84-023 AND $5,000.00 $5,000.00 $33,000.00 $0.00 $43,000.00 Pave Apron (150'x300') and stub taxiway (275'x40'), install tie downs and taxiway reflectors
84-020 3J0 $40,000.00 $40,000.00 $0.00 $0.00 $80,000.00 Purchase of land for clearance of approach zones.
84-011 5J5 $975.00 $975.00 $0.00 $0.00 $1,950.00 Relocate existing power line from the approach to Runway 22 to the extreme eastern edge of airport property, clear and grub for entrance road right-of-way.
84-010 CAE $53,488.58 $922,522.42 $3,323,989.00 $0.00 $4,300,000.00 Extension of Runway 11/29, Reconstruction of Runway 5/23 and associated taxiways and lighting.
84-009 HVS $18,475.00 $18,475.00 $332,550.00 $0.00 $369,500.00 Rehabilitate airfield pavement, perimeter fencing, medium intensity lighting, apron expansion, relocate SAVASI, ALP update.
84-008 SPA $7,760.00 $7,760.00 $139,680.00 $0.00 $155,200.00 1. Security Fencing; 2. Rehab. Aircraft Apron; 3. Rehab. Auto Parking; 4. Non-destructive testing-Rwy 4-22; 5. Obstruction survey Twy 4-22 & 11-29
84-007 ARW $61,138.00 $61,468.00 $313,007.00 $0.00 $435,613.00 Construct aircraft apron, stub taxiway, and associated lighting, utility relocation, auto parking, and security fencing.
84-006 HXD $3,909.76 $3,909.77 $70,375.77 $0.00 $78,195.30 Installation of Medium Intensity Taxiway Lighting System and associated work, and a Master Plan Study update.
84-003 LKR $26,485.65 $26,485.65 $476,741.70 $0.00 $529,713.00 Construct and light partial parallel taxiway "A"(2400'x40'), Construct & light Stub Taxiway "B" (170'x40'); Expand general aviation apron (4590 sy); Clear transitional surfaces & clear zones.
84-001 RBW $5,934.75 $5,934.75 $71,992.00 $0.00 $83,861.50 Replacement of approximately 1,400 linear feet of deteriorated storm sewer pipe.