85-019 |
UZA |
$27,667.00 |
$27,667.00 |
$498,000.00 |
$0.00 |
$553,334.00 |
Construction of Safety Area, Relocation of Road, Electrical Vault. (AIP NO. 3-45-0049-03) |
85-018 |
CDN |
$8,522.82 |
$8,522.83 |
$124,824.15 |
$0.00 |
$141,869.79 |
Reconstruct a portion of the airport drainage; update airport layout plans, airport boundary survey with corner monuments. |
85-013 |
GRD |
$21,000.00 |
$29,500.00 |
$53,325.00 |
$0.00 |
$103,825.00 |
Installation of taxiway lighting. |
85-010 |
3J1 |
$4,769.00 |
$4,769.00 |
$0.00 |
$0.00 |
$9,538.00 |
Environmental Assessment for New Runway |
85-009 |
UZA |
$18,762.00 |
$18,762.00 |
$253,543.00 |
$0.00 |
$291,067.00 |
Airfield Drainage Improvements & Stub Taxiway. (portion of AIP 3-45-0049-01). |
85-005 |
GMU |
$22,900.00 |
$22,900.00 |
$412,200.00 |
$0.00 |
$458,000.00 |
Extend Runway 36 Safety Area (100'x500'): Install taxiway guidance signs; remove excess pavement, realign taxiway lights, and associated items. |
85-003A |
FLO |
$5,427.61 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
Emergency rehab of HIRL on R/W 9-27 and MITL on Taxiways "B","G","D" and "E". Repairs to Taxiway "E", G.A. Apron and Airfield drainage and associated obstruction clearing. AMENDMENT |
85-003 |
FLO |
$23,147.00 |
$34,001.12 |
$514,333.17 |
$0.00 |
$571,481.29 |
Emergency rehab of HIRL on R/W 9-27 and MITL on Taxiways "B","G","D" and "E". Repairs to Taxiway "E", G.A. Apron and Airfield drainage and associated obstruction clearing. |
85-002 |
RBW |
$26,263.00 |
$52,431.00 |
$472,734.00 |
$0.00 |
$551,428.00 |
Rehabilitation of Runway 5/23. |
85-001 |
BNL |
$24,405.00 |
$25,596.00 |
$0.00 |
$0.00 |
$50,001.00 |
Repair of Aircraft Apron, Line-of-sight clearance, Terminal Building Expansion and Relocate Fuel Pump. |
84-023 |
AND |
$5,000.00 |
$5,000.00 |
$33,000.00 |
$0.00 |
$43,000.00 |
Pave Apron (150'x300') and stub taxiway (275'x40'), install tie downs and taxiway reflectors |
84-020 |
3J0 |
$40,000.00 |
$40,000.00 |
$0.00 |
$0.00 |
$80,000.00 |
Purchase of land for clearance of approach zones. |
84-011 |
5J5 |
$975.00 |
$975.00 |
$0.00 |
$0.00 |
$1,950.00 |
Relocate existing power line from the approach to Runway 22 to the extreme eastern edge of airport property, clear and grub for entrance road right-of-way. |
84-010 |
CAE |
$53,488.58 |
$922,522.42 |
$3,323,989.00 |
$0.00 |
$4,300,000.00 |
Extension of Runway 11/29, Reconstruction of Runway 5/23 and associated taxiways and lighting. |
84-009 |
HVS |
$18,475.00 |
$18,475.00 |
$332,550.00 |
$0.00 |
$369,500.00 |
Rehabilitate airfield pavement, perimeter fencing, medium intensity lighting, apron expansion, relocate SAVASI, ALP update. |
84-008 |
SPA |
$7,760.00 |
$7,760.00 |
$139,680.00 |
$0.00 |
$155,200.00 |
1. Security Fencing; 2. Rehab. Aircraft Apron; 3. Rehab. Auto Parking; 4. Non-destructive testing-Rwy 4-22; 5. Obstruction survey Twy 4-22 & 11-29 |
84-007 |
ARW |
$61,138.00 |
$61,468.00 |
$313,007.00 |
$0.00 |
$435,613.00 |
Construct aircraft apron, stub taxiway, and associated lighting, utility relocation, auto parking, and security fencing. |
84-006 |
HXD |
$3,909.76 |
$3,909.77 |
$70,375.77 |
$0.00 |
$78,195.30 |
Installation of Medium Intensity Taxiway Lighting System and associated work, and a Master Plan Study update. |
84-003 |
LKR |
$26,485.65 |
$26,485.65 |
$476,741.70 |
$0.00 |
$529,713.00 |
Construct and light partial parallel taxiway "A"(2400'x40'), Construct & light Stub Taxiway "B" (170'x40'); Expand general aviation apron (4590 sy); Clear transitional surfaces & clear zones. |
84-001 |
RBW |
$5,934.75 |
$5,934.75 |
$71,992.00 |
$0.00 |
$83,861.50 |
Replacement of approximately 1,400 linear feet of deteriorated storm sewer pipe. |