South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
87-004 DYB $31,292.59 $35,638.44 $641,492.04 $0.00 $708,423.08 Site Preparation for General Utility Runway, Stub taxiway, and Apron Area.
87-003 DYB $5,870.96 $5,870.96 $105,677.30 $0.00 $117,419.22 Install MIRL, MITL, PAPI-2, Beacon, Wind Cone & Segmented Circle.
87-002 DYB $15,156.60 $117,424.26 $411,864.88 $0.00 $544,445.74 Land Acquisition and associated cost
87-001 DYB $49,077.95 $49,077.96 $836,973.95 $0.00 $935,129.86 Paving of Runway 5/23, Stub Taxiway and Apron Area.
86-xx4 CKI $60,000.00 $0.00 $0.00 $0.00 $0.00 Preliminary engineering design and environmental assessment for a 700'runway extension, including the construction of a 4400' parallel taxiway, and 150'x300' apron expansion; widen & strengthen of runway and safety areas.
86-xx3 UDG $45,000.00 $0.00 $0.00 $0.00 $45,000.00 Construction Of Airport Terminal Building
86-xx2 MNI $60,000.00 $0.00 $0.00 $0.00 $60,000.00 Preliminary engineering for runway extension
86-xx1 99N $25,000.00 $0.00 $0.00 $0.00 $25,000.00 Installation of Airfield Lighting
86-041 6J0 $1,955.00 $1,956.00 $35,193.00 $0.00 $39,104.00 Preparation of an Airport Master Plan Study. Phase I-Airport Requirements, Phase II-Site Evaluation, Phase III-Airport Plans, Phase IV-Scheduling and Cost, and Phase V-Miscellaneous Items.
86-038 BBP $7,500.00 $7,500.00 $0.00 $0.00 $15,000.00 Repair of runway surface deterioration occurring in joints or seams resulting from the elements during seventeen years of exposure.
86-037 BBP $3,000.00 $3,000.00 $0.00 $0.00 $6,000.00 Marking of Runway And Taxiway
86-036 AND $3,312.50 $3,312.50 $0.00 $0.00 $6,625.00 Pave Auto Parking Area
86-034 UZA $81,000.00 $81,000.00 $0.00 $0.00 $162,000.00 Installation of Localizer, Equipment needed for a future instrument landing system.
86-032 UZA $30,929.92 $30,929.92 $556,732.00 $0.00 $618,591.84 Site Preparation (clearing & drainage) for Runway 19 Safety Area, and Expand Apron (19,987 SY). (AIP 3-45-0049-02)
86-031 6J0 $19,737.90 $19,737.90 $0.00 $0.00 $39,475.80 Terminal Building - Phase I.
86-030 AND $30,000.00 $30,000.00 $0.00 $0.00 $60,000.00 Expand FBO Apron
86-027 AND $20,333.34 $20,333.34 $366,029.00 $0.00 $406,695.70 1. Itinerant Ramp and Taxiway Strengthening 2. Helipads 3. Seal coat FBO Ramp
86-023 RBW $52,500.00 $52,500.00 $0.00 $0.00 $105,000.00 Repair and Sealing of Cracks in Runway 9/27, soil sterilization of pavement edges on Runway 17/35, and resealing of joints in concrete apron.
86-013 6J0 $33,812.00 $33,814.00 $281,055.00 $0.00 $348,681.00 Construct apron, connect taxiway turn around, edge lighting installation of runway and taxiway and installation of lighted wind cone and rotating beacon.
86-012 GMU $15,000.00 $15,000.00 $0.00 $0.00 $30,000.00 Routing and sealing of cracks in asphalt on Runway 18-36 and Runway 9-27, and the associated parallel taxiways