Skip to main content

South Carolina Grant History

Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
87-032 AQX $5,810.57 $5,810.59 $104,590.48 $0.00 $116,211.64 Medium Intensity Runway and Taxiway Lighting System, Rotating Bacon, and PAPI'S
87-031 GGE $3,400.00 $3,400.00 $53,100.00 $0.00 $59,900.00 Airport Master Plan
87-030 FLO $4,222.00 $4,222.00 $75,985.00 $0.00 $84,429.00 Airport Master Plan
87-029 GYH $1,650.00 $1,650.00 $0.00 $0.00 $3,300.00 Repair of broken concrete on runway 4.
87-028 GYH $7,123.50 $7,123.50 $0.00 $0.00 $14,247.00 Joint & crack sealing on runway 4/22.
87-027 BNL $15,500.00 $15,500.00 $0.00 $0.00 $31,000.00 Recycling Runway 4/22 by using a rejuvenating agent preformed by the Yates Corporation.
87-026 DYB $1,650.00 $1,650.00 $29,704.00 $0.00 $33,004.00 Preparation of Master Plan Study. Phase I - Airport Requirements Phase II - Airport Plans; Phase III - Scheduling and Cost; Phase IV - Miscellaneous Items.
87-025B SPA $1,738.00 $1,738.00 $31,272.00 $0.00 $34,748.00 Update the Airport Layout Plan (ALP).
87-025A SPA $42,645.00 $42,645.00 $767,610.00 $0.00 $852,900.00 Rehabilitation of Runway 4/22 and Obstruction Clearing.
87-024 FLO $6,443.00 $6,443.00 $115,979.00 $0.00 $128,865.00 Part 77 surface clearing on runway 9/27
87-023 OGB $7,515.00 $7,515.00 $135,270.00 $0.00 $150,300.00 Clear obstructions in runway 4 approach, refurbish runway 4/22 medium intensity lights and 36" rotating beacon, and install radio controls for airport lighting system.
87-022 CUB $14,000.00 $14,000.00 $0.00 $0.00 $28,000.00 Updating the Airport Layout Plan (ALP) and other planning documents.
87-021 UZA $30,929.00 $30,834.00 $555,005.00 $0.00 $616,768.00 Construction of a parallel taxiway, repair runway 01/19, and rehabilitation of the medium intensity runway lighting system.
87-019 GMU $7,750.00 $7,750.00 $139,506.00 $0.00 $155,006.00 Replace high intensity lights on Runway 18/36; replace medium intensity taxiway lights on parallel taxiway. Replace omni-directional approach indicator lights, and runway end identifier lights on runway 18/36 replace wind cone and segmented circle.
87-018 0A2 $14,600.00 $14,600.00 $0.00 $0.00 $29,200.00 Approach clearing and obstruction removal in the primary surface areas of runway 10/28, marking power lines, and preliminary engineering design for possible future overlay.
87-016A PYG $2,390.00 $2,390.00 $0.00 $0.00 $4,780.00 Installation of an Non-directional radio beacon (NDB).
87-016 PYG $8,000.00 $8,000.00 $0.00 $0.00 $16,000.00 Installing NDB.
87-015 35A $1,500.00 $1,500.00 $0.00 $0.00 $3,000.00 Purchase six (6) OSHA approved fire fighting suits for the Southside Fire Department as they are responsible for providing fire protection.
87-013A ARW $15,000.00 $15,000.00 $0.00 $0.00 $30,000.00 Terminal Building Construction
87-013 ARW $80,000.00 $80,000.00 $0.00 $0.00 $160,000.00 Design, develop and construct a terminal building.