87-032 |
AQX |
$5,810.57 |
$5,810.59 |
$104,590.48 |
$0.00 |
$116,211.64 |
Medium Intensity Runway and Taxiway Lighting System, Rotating Bacon, and PAPI'S |
87-031 |
GGE |
$3,400.00 |
$3,400.00 |
$53,100.00 |
$0.00 |
$59,900.00 |
Airport Master Plan |
87-030 |
FLO |
$4,222.00 |
$4,222.00 |
$75,985.00 |
$0.00 |
$84,429.00 |
Airport Master Plan |
87-029 |
GYH |
$1,650.00 |
$1,650.00 |
$0.00 |
$0.00 |
$3,300.00 |
Repair of broken concrete on runway 4. |
87-028 |
GYH |
$7,123.50 |
$7,123.50 |
$0.00 |
$0.00 |
$14,247.00 |
Joint & crack sealing on runway 4/22. |
87-027 |
BNL |
$15,500.00 |
$15,500.00 |
$0.00 |
$0.00 |
$31,000.00 |
Recycling Runway 4/22 by using a rejuvenating agent preformed by the Yates Corporation. |
87-026 |
DYB |
$1,650.00 |
$1,650.00 |
$29,704.00 |
$0.00 |
$33,004.00 |
Preparation of Master Plan Study. Phase I - Airport Requirements Phase II - Airport Plans; Phase III - Scheduling and Cost; Phase IV - Miscellaneous Items. |
87-025B |
SPA |
$1,738.00 |
$1,738.00 |
$31,272.00 |
$0.00 |
$34,748.00 |
Update the Airport Layout Plan (ALP). |
87-025A |
SPA |
$42,645.00 |
$42,645.00 |
$767,610.00 |
$0.00 |
$852,900.00 |
Rehabilitation of Runway 4/22 and Obstruction Clearing. |
87-024 |
FLO |
$6,443.00 |
$6,443.00 |
$115,979.00 |
$0.00 |
$128,865.00 |
Part 77 surface clearing on runway 9/27 |
87-023 |
OGB |
$7,515.00 |
$7,515.00 |
$135,270.00 |
$0.00 |
$150,300.00 |
Clear obstructions in runway 4 approach, refurbish runway 4/22 medium intensity lights and 36" rotating beacon, and install radio controls for airport lighting system. |
87-022 |
CUB |
$14,000.00 |
$14,000.00 |
$0.00 |
$0.00 |
$28,000.00 |
Updating the Airport Layout Plan (ALP) and other planning documents. |
87-021 |
UZA |
$30,929.00 |
$30,834.00 |
$555,005.00 |
$0.00 |
$616,768.00 |
Construction of a parallel taxiway, repair runway 01/19, and rehabilitation of the medium intensity runway lighting system. |
87-019 |
GMU |
$7,750.00 |
$7,750.00 |
$139,506.00 |
$0.00 |
$155,006.00 |
Replace high intensity lights on Runway 18/36; replace medium intensity taxiway lights on parallel taxiway. Replace omni-directional approach indicator lights, and runway end identifier lights on runway 18/36 replace wind cone and segmented circle. |
87-018 |
0A2 |
$14,600.00 |
$14,600.00 |
$0.00 |
$0.00 |
$29,200.00 |
Approach clearing and obstruction removal in the primary surface areas of runway 10/28, marking power lines, and preliminary engineering design for possible future overlay. |
87-016A |
PYG |
$2,390.00 |
$2,390.00 |
$0.00 |
$0.00 |
$4,780.00 |
Installation of an Non-directional radio beacon (NDB). |
87-016 |
PYG |
$8,000.00 |
$8,000.00 |
$0.00 |
$0.00 |
$16,000.00 |
Installing NDB. |
87-015 |
35A |
$1,500.00 |
$1,500.00 |
$0.00 |
$0.00 |
$3,000.00 |
Purchase six (6) OSHA approved fire fighting suits for the Southside Fire Department as they are responsible for providing fire protection. |
87-013A |
ARW |
$15,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$30,000.00 |
Terminal Building Construction |
87-013 |
ARW |
$80,000.00 |
$80,000.00 |
$0.00 |
$0.00 |
$160,000.00 |
Design, develop and construct a terminal building. |