88-011 |
CKI |
$25,000.00 |
$25,000.00 |
$0.00 |
$0.00 |
$50,000.00 |
Emergency repair to runway 14/32. Removal and replacement of existing damaged pavement and sealing of cracks in asphalt runway. |
88-010 |
MYR |
$9,682.00 |
$9,682.00 |
$174,273.00 |
$0.00 |
$193,637.00 |
Comprehensive Master Plan of Aviation Facilities in Horry County |
88-009 |
MYR |
$5,257.00 |
$5,257.00 |
$94,617.00 |
$0.00 |
$105,131.00 |
Airport master plan terminal area study |
88-008 |
AND |
$138,000.00 |
$138,000.00 |
$0.00 |
$0.00 |
$276,000.00 |
Reconstruction and strengthen apron near cargo hangar, and strengthen connecting taxiway. |
88-006 |
CRE |
$9,168.56 |
$9,168.56 |
$165,034.06 |
$0.00 |
$183,371.18 |
Installation of high intensity runway lights for runway 5/23. |
88-005 |
CRE |
$12,714.96 |
$12,714.95 |
$228,869.22 |
$0.00 |
$254,299.13 |
Rehabilitation of taxiways |
88-004 |
CRE |
$62,943.26 |
$62,943.26 |
$1,132,978.74 |
$0.00 |
$1,258,865.26 |
Construct a connector taxiway for a full parallel taxiway, rehabilitation of runway 5/23 and medium intensity taxiway lights. |
88-003 |
GYH |
$19,181.29 |
$19,181.29 |
$0.00 |
$0.00 |
$38,362.58 |
Asphalt overlay of badly cracked concrete ramp near Lockheed maintenance hangar. |
88-002 |
GMU |
$32,056.00 |
$32,056.00 |
$577,008.00 |
$0.00 |
$641,120.00 |
Construct taxiways to general aviation apron; construct general apron (225' x 250'); construct T-Hangar taxiways; and install medium intensity taxiway lights |
88-001A |
6J4 |
$2,881.13 |
$2,881.13 |
$0.00 |
$0.00 |
$5,762.26 |
Crack and slurry seal existing apron and construct a taxiway to a three bay T-hangar. |
88-001 |
6J4 |
$7,800.00 |
$7,800.00 |
$0.00 |
$0.00 |
$15,600.00 |
Slurry seal existing apron and construct a taxiway three bay T-hangar. |
87-035 |
OGB |
$39,900.00 |
$89,600.00 |
$0.00 |
$0.00 |
$129,500.00 |
Rebuild airport administration building which was destroyed by fire on August 28, 1986. |
87-034 |
3J1 |
$3,650.00 |
$3,650.00 |
$0.00 |
$0.00 |
$7,300.00 |
Repairs and a asphalt overlay to the taxiway and ramp. |
87-033 |
CDN |
$150,196.50 |
$150,196.50 |
$0.00 |
$0.00 |
$300,393.00 |
Construct terminal building and auto parking lot |
87-032 |
AQX |
$5,810.57 |
$5,810.59 |
$104,590.48 |
$0.00 |
$116,211.64 |
Medium Intensity Runway and Taxiway Lighting System, Rotating Bacon, and PAPI'S |
87-031 |
GGE |
$3,400.00 |
$3,400.00 |
$53,100.00 |
$0.00 |
$59,900.00 |
Airport Master Plan |
87-030 |
FLO |
$4,222.00 |
$4,222.00 |
$75,985.00 |
$0.00 |
$84,429.00 |
Airport Master Plan |
87-029 |
GYH |
$1,650.00 |
$1,650.00 |
$0.00 |
$0.00 |
$3,300.00 |
Repair of broken concrete on runway 4. |
87-028 |
GYH |
$7,123.50 |
$7,123.50 |
$0.00 |
$0.00 |
$14,247.00 |
Joint & crack sealing on runway 4/22. |
87-027 |
BNL |
$15,500.00 |
$15,500.00 |
$0.00 |
$0.00 |
$31,000.00 |
Recycling Runway 4/22 by using a rejuvenating agent preformed by the Yates Corporation. |