96-013 |
CQW |
$11,000.00 |
$11,000.00 |
$0.00 |
$0.00 |
$22,000.00 |
Crack seal and seal coat runway 7/25 including the stub taxiways and apron area. |
96-012 |
LQK |
$47,571.00 |
$47,571.00 |
$489,858.00 |
$0.00 |
$585,000.00 |
Phase I - Site preparation for the northeast partial parallel taxiway, and Phase II - Paving and marking for the northeast partial parallel taxiway. |
96-011 |
RBW |
$20,020.00 |
$20,021.00 |
$0.00 |
$0.00 |
$40,041.00 |
Installation of two, precision approach path indicator lighting systems (PAPI-2) located on the ends of runway 5 and 23. |
96-010 |
RBW |
$10,000.00 |
$10,000.00 |
$0.00 |
$0.00 |
$20,000.00 |
Off-site tree clearing in runway 5 approach & line of sight obstructions removal between runways on airport property. |
96-009 |
DYB |
$20,250.00 |
$20,250.00 |
$0.00 |
$0.00 |
$40,500.00 |
Application of a coal tar sealer/rejuvenator to the aircraft parking apron. |
96-008 |
OGB |
$3,966.00 |
$3,967.00 |
$71,393.00 |
$0.00 |
$79,326.00 |
Planting of wetland trees and shrubs as part of the recent construction of Phase I wetland mitigation areas. The creation of this wetland area is due to the construction of runway 17/35. |
96-007 |
GMU |
$55,901.94 |
$55,901.94 |
$0.00 |
$0.00 |
$111,803.88 |
Reconstruction of a portion of taxiway G, including relocation of the medium intensity taxiway lights. |
96-006 |
AQX |
$5,000.00 |
$5,000.00 |
$0.00 |
$0.00 |
$10,000.00 |
Tree obstruction removal on airport property |
96-005 |
RBW |
$42,400.00 |
$42,400.00 |
$0.00 |
$0.00 |
$84,800.00 |
Updating the airport layout plan, including an exhibit " A" property plat. |
96-004 |
GYH |
$100,000.00 |
$210,000.00 |
$990,000.00 |
$0.00 |
$1,300,000.00 |
Rehabilitate 1000'x150' of concrete on the end of runway 5. |
96-003 |
LKR |
$24,319.00 |
$24,320.00 |
$437,753.00 |
$0.00 |
$486,392.00 |
Phase I development for the construction of a partial parallel taxiway. This phase will consist of constructing two temporary sediment ponds and the associated drainage to comply with federal NPDES and state storm water regulations. |
96-002 |
SPA |
$14,381.50 |
$14,381.50 |
$0.00 |
$0.00 |
$28,763.00 |
Construction of a lighted helicopter landing pad. |
96-001 |
HVS |
$389,727.00 |
$220,000.00 |
$0.00 |
$0.00 |
$609,727.00 |
Extend runway 3/21 to 5000' x 75', construct a paved turnaround and install medium intensity edge lights. Installation of precision approach path indicators (PAPIS) and runway end identifier lights (REILS). Obtaining land easements and approach clearing |
95-017 |
OGB |
$30,495.00 |
$30,495.00 |
$548,909.00 |
$0.00 |
$609,899.00 |
Wetland mitigation to offset wetland areas that will be impacted during the construction of runway 17/35. |
95-016 |
DCM |
$300,000.00 |
$42,500.00 |
$0.00 |
$0.00 |
$342,500.00 |
Construct terminal building, rehabilitate the existing apron and portions of the parallel taxiway. |
95-015 |
CKI |
$856,216.55 |
$0.00 |
$400,000.00 |
$0.00 |
$1,256,216.55 |
Reconstructing and overlaying runway 14/32, 4000' x 75' and extending runway 14, 600' x 75'. At completion, runway 14/32 will be 5000' x 75', with medium intensity lighting, serving dual wheel aircraft up to 30,000 lbs. |
95-014 |
UZA |
$500,000.00 |
$500,000.00 |
$0.00 |
$0.00 |
$1,000,000.00 |
Construction of a general aviation terminal building. |
95-013 |
RBW |
$15,093.59 |
$15,093.59 |
$0.00 |
$0.00 |
$30,187.18 |
Removing trees and shrubs in the approach to runway 5. |
95-012 |
OGB |
$25,770.00 |
$25,770.00 |
$463,860.00 |
$0.00 |
$515,400.00 |
Relocate Santee-Cooper electric power transmission line to facilitate the construction of runway 17/35. |
95-011 |
CDN |
$12,000.00 |
$15,000.00 |
$0.00 |
$0.00 |
$27,000.00 |
Crack sealing of airfield pavement areas. |