05-025 |
HVS |
$1,191.25 |
$10,789.75 |
$227,639.00 |
$0.00 |
$239,620.00 |
Update the airport master plan and assist in the acquisition of 41.72 acres of property for obstruction clearing. |
05-024 |
MYR |
$0.00 |
$350,000.00 |
$0.00 |
$0.00 |
$350,000.00 |
Renovate general aviation terminal building |
05-023 |
FLO |
$65,140.00 |
$65,764.00 |
$2,499,019.00 |
$0.00 |
$2,629,923.00 |
Seal pavement cracks on Runway 1/19, parallel taxiway to Runway 1/19 and the aircraft terminal parking apron, and reconstruct the general aviation aircraft parking apron |
05-022 |
6J4 |
$8,078.00 |
$8,078.00 |
$306,971.00 |
$0.00 |
$323,127.00 |
Rehabilitate runway 1/19, stub taxiway and apron area with an asphalt overlay. |
05-021 |
6J0 |
$17,630.00 |
$5,877.00 |
$0.00 |
$0.00 |
$23,507.00 |
Repair airfield lighting system. |
05-020 |
51J |
$48,750.00 |
$16,250.00 |
$0.00 |
$0.00 |
$65,000.00 |
Crack sealing airfield pavements and install light control for runway lights. |
05-018 |
UDG |
$23,376.00 |
$23,376.00 |
$888,296.00 |
$0.00 |
$935,048.00 |
Extend Runway 23 and the parallel taxiway system by 500' and relocate 2,787' of Horse Branch Terrace Road |
05-017 |
MKS |
$1,973.00 |
$1,974.00 |
$75,000.00 |
$0.00 |
$78,947.00 |
Environmental assessment study for the following work elements: Complete parallel taxiway, relocate non-directional beacon, security fencing, runway pavement resurfacing/strengthening, ODALS on Runway 5 approach end, expansion of the aircraft parking apron and construction of T-hangars and box hangars in the terminal area. |
05-016 |
ARW |
$30,739.00 |
$30,739.00 |
$1,168,088.00 |
$0.00 |
$1,229,566.00 |
Construct partial parallel taxiway and rehabilitate asphalt apron. |
05-015 |
AND |
$80,763.00 |
$80,763.00 |
$3,068,980.00 |
$0.00 |
$3,230,506.00 |
Extend RWY 5 (850') and RWY 23 (150') - project consist of paving, marking, lighting, re-installation of the glide slope antenna and the medium intensity approach lighting system with runway alignment indicator lights (MALSR) including the installation of precision approach path indicator lights (PAPI) |
05-014 |
35A |
$16,737.00 |
$16,737.00 |
$636,000.00 |
$0.00 |
$669,474.00 |
Pave runway 5/23 with asphalt, including paving of a 550' runway extension, and installation of medium intensity runway lights. |
05-013 |
LKR |
$7,956.00 |
$10,278.00 |
$300,000.00 |
$0.00 |
$318,234.00 |
Install an automated weather observation system (AWOS III) |
05-012 |
AQX |
$20,444.00 |
$20,444.00 |
$776,887.00 |
$0.00 |
$817,775.00 |
Construct parallel taxiway to Runway 17/35. |
05-011 |
CEU |
$22,250.00 |
$22,250.00 |
$0.00 |
$0.00 |
$44,500.00 |
Engineering services for relocating SR-37 (Shiloh Road). Project task will include project formulation, preliminary road alignment, coordination with South Carolina Department of Transportation for road alignment and applicable design standards. |
05-010 |
DYB |
$16,324.00 |
$16,324.00 |
$620,300.00 |
$0.00 |
$652,948.00 |
Construct and rehabilitate t-hangar taxilanes |
05-009 |
CEU |
$3,050.00 |
$3,050.00 |
$115,900.00 |
$0.00 |
$122,000.00 |
Update the 2002 runway extension justification study, 2002 airport layout plan and narrative report, conduct an airport property survey plat, and update the 2004 environmental assessment documents. |
05-008 |
CQW |
$3,335.00 |
$3,335.00 |
$126,713.00 |
$0.00 |
$133,383.00 |
Installation of security fencing |
05-007 |
GGE |
$3,480.00 |
$1,160.00 |
$0.00 |
$0.00 |
$4,640.00 |
Clean 33,000 SF of painted runway markings on runway 5/23. |
05-006 |
AND |
$114,155.00 |
$80,762.63 |
$3,068,979.75 |
$0.00 |
$3,263,897.38 |
Extend runway 5/23 and the parallel taxiway 850' X 150', to include utility relocation, site preparation, miscellaneous land acquisition cost for wetland mitigation, survey and engineering construction services, and MALSR demolition. |
05-005 |
AND |
$38,911.00 |
$38,911.00 |
$1,478,605.00 |
$0.00 |
$1,556,427.00 |
Phase II site preparation; 850' runway extension to the runway 5 approach end. |