Year-ID Sort ascending FAA ID State Funds Local Funds Federal Funds Other Funds Project Total Description
05-010 DYB $16,324.00 $16,324.00 $620,300.00 $0.00 $652,948.00 Construct and rehabilitate t-hangar taxilanes
05-009 CEU $3,050.00 $3,050.00 $115,900.00 $0.00 $122,000.00 Update the 2002 runway extension justification study, 2002 airport layout plan and narrative report, conduct an airport property survey plat, and update the 2004 environmental assessment documents.
05-008 CQW $3,335.00 $3,335.00 $126,713.00 $0.00 $133,383.00 Installation of security fencing
05-007 GGE $3,480.00 $1,160.00 $0.00 $0.00 $4,640.00 Clean 33,000 SF of painted runway markings on runway 5/23.
05-006 AND $114,155.00 $80,762.63 $3,068,979.75 $0.00 $3,263,897.38 Extend runway 5/23 and the parallel taxiway 850' X 150', to include utility relocation, site preparation, miscellaneous land acquisition cost for wetland mitigation, survey and engineering construction services, and MALSR demolition.
05-005 AND $38,911.00 $38,911.00 $1,478,605.00 $0.00 $1,556,427.00 Phase II site preparation; 850' runway extension to the runway 5 approach end.
05-004 CKI $3,766.00 $3,766.00 $67,788.00 $0.00 $75,320.00 Update the airport layout plan and have engineering design services rehabilitate the stub taxiway and apron areas with a five inch concrete overlay
05-002 CEU $6,000.00 $2,000.00 $0.00 $0.00 $8,000.00 Refurbish rotating beacon
05-001 PHH $41,432.00 $41,432.00 $1,574,426.00 $0.00 $1,657,290.00 Rehabilitate runway 18/36, stub taxiway, and apron pavements, improve the runway safety areas, install a new medium intensity runway lighting system and lighting vault, install precision approach path indicators (PAPI), and a new rotating beacon.
04-028 LKR $4,192.00 $4,192.00 $159,296.00 $0.00 $167,680.00 Runway 6 one hundred foot threshold relocation and automated weather observation system (AWOS) design project.
04-027 GRD $2,211.00 $2,211.00 $84,031.00 $0.00 $88,453.00 Design services for rehabilitating taxiway "D".
04-026 GGE $550,000.00 $1,250,000.00 $0.00 $0.00 $1,800,000.00 Construct new terminal building
04-025 CUB $259,791.00 $2,698,313.00 $1,640,761.00 $0.00 $4,598,865.00 Construct a new general aviation terminal building and t-hangar taxiways
04-024 BBP $2,488.00 $2,488.00 $94,550.00 $0.00 $99,526.00 Apron resealing and marking, including the replacement of runway lighting cables.
04-023 HVS $2,072.00 $2,072.00 $78,746.00 $0.00 $82,890.00 Clearing and grubbing of runway 21 approach
04-022 FDW $30,208.00 $30,208.00 $1,147,885.00 $0.00 $1,208,301.00 Preliminary and final engineering design and construction services for a 500' runway and parallel taxiway extension; including obstruction clearing in the approach to runway 23.
04-021 RBW $1,070.00 $1,070.00 $40,660.00 $0.00 $42,800.00 Update the airport layout plan.
04-020 CQW $3,502.00 $3,503.00 $133,095.00 $0.00 $140,100.00 Installation of an automated weather observation system with precipitation and thunderstorm sensors (AWOS III P/T)
04-019 DYB $63,750.00 $21,250.00 $0.00 $0.00 $85,000.00 Rejuvenate runway 6/24, parallel taxiway, and apron including painting of the airfield markings.
04-018 GMU $11,758.00 $11,758.00 $446,794.00 $0.00 $470,310.00 Install security fencing and gates.